GWTIG Integration Proposal Near Term Functions - PowerPoint PPT Presentation

1 / 26
About This Presentation
Title:

GWTIG Integration Proposal Near Term Functions

Description:

X. X. X. X. X. X. X. X. X. X. X. X. X. Review. X. X. X. X. X ... X. NWE. Ray Brush. X. SCL. Jim Hansen. Facilitator. Dariush. Shirmohammadi. CCA. TSLG. FB- ATC ... – PowerPoint PPT presentation

Number of Views:18
Avg rating:3.0/5.0
Slides: 27
Provided by: dash49
Category:

less

Transcript and Presenter's Notes

Title: GWTIG Integration Proposal Near Term Functions


1
GW/TIG Integration ProposalNear Term Functions
  • Technical Work Group (TWG)
  • October 14, 2005

2
Outline
  • TWG Charter Team
  • Major Assumptions
  • TWG Selection Principles
  • Recommended Near Term Functions
  • Work outline and cost estimate

3
TWG Charter Schedule
  • GW/TIG Integration Technical Work Group (TWG)
    charter is to develop a report that recommends
    the functions to be provided in the near term
    (the first two years 2006/2007) under the
    integration proposal including a rough outline of
    the work to be done and an estimate of the cost
  • A first draft of the near term functions must be
    completed and presented to the Integration
    Steering Committee by October 20, 2005
  • The final report must be presented October 31,
    2005

4
GW/TIG Integration TWG Team and Participation
5
Major Assumptions
  • Work outline and cost figures are preliminary in
    nature
  • Cost estimates do not include
  • Overhead costs (administration and oversight)
  • We assume that they are covered as part of cost
    of the GW development effort
  • It does include staff overhead
  • Cost of TO participation
  • We did not address expense allocation among
    funding members
  • Open issue on funding near term services
  • TA service fees, or
  • Inclusion in funding agreement
  • The earliest that the Integration Board will be
    in place will be Q1, 2006
  • No expenditures until Board is seated and the
    Bylaws are adopted
  • Decision Point 4 will take place at least 2 years
    after the Board is seated and the bylaws are
    adopted,
  • Once the Near term implementation transmission
    agreement (TA1) is implemented, there will be at
    least 12 months where these services are
    operational

6
Major Assumptions Cont.
  • We developed our own cost estimates ground up and
    verified their overall consistency with GW/TIG
    cost estimates whenever possible
  • The Integration Board will oversee
    design/development of TSLG basic features and the
    implementation of near term functions
    Integration Board will also play the role of the
    following bodies for the near term (2006-2007)
  • Transmission Expansion Review Council (TERC)
  • Market Monitoring Committee (MMC)

7
Major Assumptions Cont.
  • In the near term, for functions TIG addressed
    that are being directly funded and developed by
    another regional entity such as WECC, PNSC, or
    NWPP, the Integration Board will
  • Actively monitor and support their development to
    ensure their successful and timely completion and
    operation
  • Participate in the development of requirements,
    standards, business practices and desired
    outcomes 
  • Participate in the design, development and
    implementation of all the necessary
    infrastructure
  • If the development of such functions is delayed
    or abandoned, step in, subject to feasibility and
    continued value, to complete appropriate elements
    as part of this near term effort
  • Review such functions at the time for value and
    feasibility
  • Designate the necessary resources for their
    timely completion and deployment
  • Cost of such potential undertakings is not
    included here

8
TWG Selection Principles for Near Term Functions
  • Function is recommended by the TIG report and
    provides immediate value for the region
  • Function can be reasonably implemented and be
    operational in the near term - next two (2) years
  • Function is not inconsistent or incompatible with
    the solution proposed in the TSLG Basic Features
  • We have also assumed that design/development of
    the TSLG Basic Features will move forward in
    parallel and close coordination with the
    development of the near term functions proposed
    here

9
Near Term Transmission Planning Functions
  • Integration Board to hire staff for a planning
    organization whose near term responsibilities
    will be to
  • Develop open planning processes and procedures
  • Develop transmission adequacy standards in
    coordination with region
  • Use existing standards for the first biennial
    plan
  • Participate in WECCs transmission adequacy
    development process
  • Coordinate planning with all regional entities,
    run studies and produce Biennial Plans
  • Collect system info and build basecases
  • Perform some system studies and coordinate with
    other entities for others
  • Document "Problem Need Statements"
  • Use WECC/NERC minimum criteria supplemented with
    TOs criteria as needed
  • Coordinate congestion analysis responsibility
    with NTAC
  • Propose projects to relieve major congestion
    problems as identified by the Integration Board
    in coordination with the region

10
Near Term Transmission Planning Functions Cont.
  • Planning organizations near term
    responsibilities (cont.)
  • Submit Biennial Plans to Integration Board
  • Integration Board will play the role of TERC
  • Modify the plan per Integration Board
    instructions
  • Facilitate the development of cost and capacity
    allocation methodology and backstop model for
    reliability and firm obligation projects
  • Apply to the first biennial plan
  • Planning organization will rely heavily on TOs
    and other regional entities to conduct many of
    the necessary planning studies
  • The scope of this reliance to be determined as
    part of the open planning process design

11
Work Outline Cost Estimate for the Near Term
Transmission Planning Functions
12
Near Term IMM Functions
  • Integration Board to contract with a qualified
    independent contractor as the Independent Market
    Monitor (IMM)
  • Integration Board would also play the role of MMC
    for the near term
  • IMMs near term responsibilities will be to
  • Produce state of market (SOM) reports annually
  • Report to Integration Board
  • Establish direct relationships with states,
    federal, and provincial regulatory/enforcement
    and oversight entities and submit un-redacted
    reports, governed by non-disclosure agreements,
    to such entities
  • Establish data exchange protocols and solution
    with market participants

13
Near Term IMM Functions Cont.
  • IMMs near term responsibilities (continued)
  • Monitor and analyze regional transmission and
    wholesale power markets
  • For the initial SOM, the IMM would prepare a
    general retrospective report based to the
    greatest extent possible on publicly available
    information
  • Report to the Integration Board as well as other
    appropriate oversight/regulatory bodies about
    market irregularities without intervening itself
    to remedy behavior or market structure
  • Monitor activities in adjacent wholesale power
    and transmission markets as well as related
    commodities (e.g., gas market) for their impact
    on the wholesale power and transmission markets
    in the region
  • Recommend and assist in market investigations in
    response to complaints as well as on own
    initiative

14
Work Outline Cost Estimate for Near Term IMM
Functions
15
Near Term Common OASIS Functions
  • Integration Board to hire a Common OASIS
    Coordinator
  • Common OASIS Coordinators near term
    responsibilities will be to
  • Develop and implement an OASIS Agreement for
    signature by TOs
  • Select and put into place contract between an
    OASIS vendor and TOs to implement a Common
    Northwest OASIS on an outsource basis
  • The TOs will sign appropriate agreements and pay
    associated costs
  • Consider WesTTrans as an available option
  • Coordinate Common OASIS operation including all
    path offerings from multiple owners.
  • Develop common business practices among TOs

16
Work Outline Cost Estimate for Near Term
Common OASIS Functions
17
Near Term Reliability and Security Functions
  • Integration Board to assign resources to monitor
    and support Reliability and Security initiatives
    by regional entities
  • Development of PNSCs tools for flow and voltage
    and transient stability analyses for real-time
    and hour-ahead use
  • Development of PNSCs day ahead operational
    analysis
  • Development of PNSCs infrastructure to comply
    with updated security coordination requirements
  • Development of NWPPs ACE Diversity Interchange
    through reserve sharing system
  • Development of WECCs regional database for
    reliability data that can be shared among
    participants
  • Development of TSLGs Consolidated Control Area
    (CCA)
  • Cost of CCA development is addressed separately

18
Near Term Reliability and Security Functions
Cont.
  • Step in to complete above functions, subject to
    feasibility and continued value, if their
    development is delayed or abandoned
  • Cost of such undertakings is not included here
  • If at Decision Point 4, the region decides not to
    implement Grid West, the Integration Board will
    pursue development of additional necessary
    reliability measures including the voluntary
    consolidation of control areas

19
Work Outline Cost Estimate for Near Term
Reliability Security Functions
20
Near Term Flow Based ATC Calculation Function
  • Support development and implementation of TSLGs
    Flow Based ATC calculator
  • The cost of development and implementation of
    Flow Based ATC calculator is addressed separately
  • Use the developed Flow Based ATC calculator in
    parallel with actual operation for testing and
    evaluation purposes as judged effective

21
Work Outline Cost Estimate for Near Term Flow
Based ATC Calculation Function
22
Near Term Admin and Legal
  • Secretarial and administration support needed for
    the Near Term Implementation staff.
  • Hire contract legal assistance to assist with
    writing the Near Term Implementation Transmission
    Agreement (TA1) and providing Near Term
    Implementation Staff legal advice on operational
    and development issues.

23
Work Outline Cost Estimate for Near Term Admin
and Legal
24
Cost Estimate for All Near Term Functions
25
TWG Next Steps
  • Factor in input from today into TWG proposal
  • Modify selected near term functions as well as
    work outlines and cost estimates as necessary
  • Prepare a report based on the final list of near
    term functions as well as their work outlines and
    cost estimates
  • Present the report to the Regional Forum on
    10/28/2005

26
Comparison to TIG cost estimate
  • The TIG estimated cost was 50.5 million per
    year, of this
  • 22.4 million was associated with the RABA
    function, which will not be implemented in the
    near term
  • 28.1 million was associated with non-RABA
    functions
  • Of the 28.1 million of non-RABA cost
  • Significant cost was associated with moving to
    flow based ATC calculation. This is not expected
    to be implemented in the near term,
  • Given the uncertainty of the development of
    Reliability and Security initiatives, it was
    assumed that TIG would fund and develop these.
  • The region will still carry these costs, but
    under the WECC, NWPP, and PNSC
  • There are also some non-RABA reliability
    functions not being implemented in the near term