BRAC Base Realignment and Closure http:www'globalsecurity'orgmilitaryfacilitybrac'htm - PowerPoint PPT Presentation

1 / 6
About This Presentation
Title:

BRAC Base Realignment and Closure http:www'globalsecurity'orgmilitaryfacilitybrac'htm

Description:

BRAC Base Realignment and Closure http:www'globalsecurity'orgmilitaryfacilitybrac'htm – PowerPoint PPT presentation

Number of Views:32
Avg rating:3.0/5.0
Slides: 7
Provided by: rcm
Category:

less

Transcript and Presenter's Notes

Title: BRAC Base Realignment and Closure http:www'globalsecurity'orgmilitaryfacilitybrac'htm


1
BRAC (Base Realignment and Closure)http//www.glo
balsecurity.org/military/facility/brac.htm
  • Problem 11-24
  • http//www.defenselink.mil/brac/

2
Which Base to Close? P11-24
3
Cash Flow Changes at Each Base if Close Alameda,
CA
4
Cash Flow Changes System-wide per Year
5
What Changes, Whats Relevant?
  • System-wide operating costs fall by 300m/yr if
    close Alameda.
  • Alameda falls by 400m/yr
  • Everett rises by 100 and grows to 400 (original
    300 100).
  • 3m rent on lease at Everett remains if close
    Alameda.
  • 440m of working capital generated if close
    Alameda (500m salvage from Alameda less 60m
    working capital to yield to pays 3 rent on lease
    at Everett).
  • If DOD closes Alameda
  • 400 System-wide operating costs
  • 3m/yr from 60m Working Capital fund
  • 440 remains from salvage of Alameda Land that
    can earn 22m/yr (440 5)-

6
Possible Criteria
  • Readiness
  • Industrial Base
  • System Wide Cost Savings
  • One Time Costs
  • One Time Benefits
  • Social Engineering
  • Congressional Districts
  • California Has 54 Electoral Votes
Write a Comment
User Comments (0)
About PowerShow.com