Transcript and Presenter's Notes

Title: Session 1'5 Evaluation


1
Session 1.5 Evaluation
  • STREETWISE - Achievements and results to date
  • case studies of benefits achieved
  • looking at results across projects
  • By Steve Tarry

2
Achievements and results to date
Evaluation
STREETWISE SUMMARY
IMPLEMENTATED PROJECTS
BENEFITS REPORTED / TO BE REPORTED
SYNERGY OF RESULTS
CONCLUSION
3
STREETWISE SUMMARY
Summary
  • Newest E-R project
  • Started 2001
  • 9M Euros from EU
  • First projects implemented 2002/3

Summary
Projects
Benefits
Synergy
Conclusion
4
Implemented Projects 2001
Projects
  • Wales
  • 5 CCTV cameras installed
  • Cabling installed for CCTV
  • MIDAS coverage extended
  • Traffic Wales WAP site implemented
  • Scotland
  • M90/A90 integration of VMS/TMUs to NADICS
  • No evaluation for 2001 projects - projects well
    developed prior to STREETWISE

Summary
Projects
Benefits
Synergy
Conclusion
5
Implemented Projects 2002
Projects
  • Scotland
  • NADICS host upgrade
  • 2 additional VMS installed
  • Local Journey Time System
  • Mobile Journey Time System through roadworks
  • Network wide web based travel time information
    sourced from FVD
  • service available on website
  • Ireland
  • M50 Incident Detection Response
  • Algorithms currently being tuned.
  • Projects in bold being evaluated

Summary
Projects
Benefits
Synergy
Conclusion
6
Implemented Projects 2002
Projects
  • Wales
  • Web based journey time provision using existing
    infrastructure
  • Icealert system upgrade
  • CCTV installation
  • Mobile VMS
  • England
  • Video Information Highway
  • Northern Ireland
  • Gantry construction

Summary
Projects
Benefits
Synergy
Conclusion
Projects in bold being evaluated
7
Benefits
Benefits
  • Most STREETWISE projects have yet to report
    benefits due to recent start of the project.
  • Some technical evaluation complete
  • Impact evaluation to follow

Summary
Projects
Benefits
Synergy
Conclusion
8
Benefits
Benefits
  • Technical Performance
  • Mobile Journey Time System

Summary
Projects
Benefits
Synergy
Conclusion
9
Benefits
Benefits
  • Technical Performance
  • Mobile Journey Time System
  • Trials over several peak periods to verify
    correlation of journey times (FVD vs MJTS) at the
    95 confidence interval
  • Hit (read) rate of ANPR over 60
  • Outlier results must be removed for accurate
    Journey Times
  • 14 of Plates successfully matched over a long
    section of route to provide journey times (NB
    ANPR on inside lane only)

Summary
Projects
Benefits
Synergy
Conclusion
10
Benefits
Benefits
  • Technical Performance accuracy of journey times

Summary
Projects
Benefits
Synergy
Conclusion
11
Benefits
Benefits
  • Technical Performance

Summary
  •  
  • System ability to recognise number plates may be
    compromised by low direct sunlight.
  • User Acceptance
  • User Acceptance surveys planned Q3/Q4 2003

Projects
Benefits
Synergy
Conclusion
12
Benefits
Benefits
  • Technical Performance
  • Local Journey Time Information System
  • Will use VMS to present current travel times from
    the edge of Glasgow to locations in the City
    centre (between 8 25 km)
  • Signs not yet installed, but loops and algorithms
    operational.
  • before survey of average journey times
    collected.

Summary
Projects
Benefits
Synergy
Conclusion
13
Benefits
Benefits
  • Technical Performance

Summary
Projects
Benefits
Synergy
Conclusion
The research indicated that there was no
significant difference between the data sets at
the 95 confidence level.  
14
Synergies
Synergies
  • Synergies between STREETWISE and other projects
    include
  • Køge Bugt Motorway DK and
  • Active Traffic Management UK
  • M25 Controlled Motorway UK and
  • Variable Speed Limits Sweden/Finland
  • Travel times system in the V-30 motorway ESP and
  • Local Journey Time System UK

Summary
Projects
Benefits
Synergy
Conclusion
15
Synergies
Synergies
  • Synergies within STREETWISE include
  • Local Journey Time System Scotland
  • Welsh Journey Time System
  • Northern Irish Journey Time System.
  • MS4 Wales and
  • MS4 England.
  • ITIS FV Journey Time Information Provision
    Scotland and
  • FV Journey Time Information Provision Republic of
    Ireland.

Summary
Projects
Benefits
Synergy
Conclusion
16
Conclusions
Conclusions
  • Early days for STREETWISE evaluation results.
  • Much before monitoring and technical evaluation
    on-going
  • Opportunity to share technical experiences of
    journey time estimation now
  • Opportunity to share experience of several
    applications over the coming months and years

Summary
Projects
Benefits
Synergy
Conclusion