Status from previous assessment
  • Employee Suggestion Box
  • Code almost complete
  • Testing this week or next
  • Status of Six Improvements from 2003
  • The methods of doing backups/restores should be
    documented and published.
  • Re-assessed backup schedule
  • New hardware and software
  • A disaster recovery plan should be defined and
    documented.
  • Need to do

2
Status from previous assessment
  • Status of Six Improvements from 2003
  • The methods used to protect web content needs to
    be reviewed and defined appropriately (e.g. the
    use of network usernames/passwords to
    authenticate over the internet should be
    reviewed).
  • Reviewed and implemented
  • Need to review division wide
  • Responsibility should be defined (i.e. names
    assigned) for people responsible for managing web
    content that is intended for the public.
  • Margie has been assigned as content manager for TD

3
Status from previous assessment
  • Status of Six Improvements from 2003
  • Implement a mechanism for tracking
    updates/patches applied to systems which do not
    have internal tracking mechanisms in place (e.g.
    MS SQL Server).
  • Patchlink since early 2004

4
Status from previous assessment
  • Data Storage Backups
  • 3 TB of current data storage
  • 1 SDLT Tape Library w/ 2 Drives
  • 3.6 TB in library
  • 700 MB/Min per tape drive
  • Archive monthly in Fermi Vault
  • Studying impact of dual backup from Feynman
  • New TDarchive2 server and tape library
  • Tapes being stored in 3 different places
  • In computer room for time they are in Tape
    Library (2 weeks)
  • In Jims office ICB 3rd floor for 2 months
  • One set a month goes to Fermilab Vault after that
    (up to date on transfers)

5
Long Term Network/Computing Plans
  • Networking
  • Infrastructure Plans
  • Pilot Secured/Protected Ethernet Network
  • Firewall Project w/ CD (Green/Yellow Network)
  • Totally switched Network w/ management required
  • Replace improve wireless LAN (done)
  • Fiber to ICB High Bay Area (Data Acquisition)
  • Since wireless advances, not as big an issue

6
Computing Plans
  • 12 current NT/2000/2003/Unix/Linux servers
  • Plan to replace 2/3 per year to keep us current
    with new technology 15K
  • OS and Keystone Application Licensing through CD
    (2000, Office, WRQ)
  • Implemented last year

7
Property Management
  • CIS and PC Equipment Inventory
  • A thorough physical scan for all equipment in
    TD's control is being performed now
  • Will be complete in early August 2005, with
    reports generated by end of August 2005
  • Property Passes
  • Currently have 75 active property passes
  • After a few items completed, we will be in 100
    compliance.
  • Missing Property PCs, Peripherals, and Hard
    Drives Discs
  • Currently have 52 unusable hard drives being
    processed in preparation for destruction at site
    38
  • all hard drives being destroyed are fully
    documented (serial number, model, size, where it
    came from)
  • All hard drives that are currently not in systems
    will be inventoried by my summer student before
    end of July 2005
  • all newly purchased hard drives should go thru me
    for inventorying in the future BEFORE being
    distributed
  • After equipment scan is complete, will be
    matching Fermilab tags from previous security
    reports to see if any have been found
  • Storage Timely MMR and Record Keeping
  • Graciela will be emailing me a summary of all
    MMRs to excess equipment in the future
  • MMRs of excessed equipment will be electronically
    recorded in HelpStar database via emails

8
Project Planning
  • Need to have Project Scope document for future
    Projects
  • Equipment selection
  • Power requirements
  • Participants and Roles defined
  • ICB1 UPS
  • HQ Conference Room
  • Not our project, just AV consult
  • Need to have Burks time
  • We need to be included in all future Project
    Plans
  • Participants and Roles defined