Title: WAMUS Commissioning Timeline


1
WAMUS Commissioning Timeline
Commissioning Channels Calibration and beam
preparation.
Commissioning Channels developing tools to do it
faster.
1999 2000



J A S O N
D J F M A M J
J A
Testing Proto Electronics
Components
  • Full System Readout
  • Real Cables, Gas System
  • Prod. FEBs, Cobos
  • Prod. Readout Electronics
  • Primary Data Path
  • Full Trigger Framework
  • Calibration Programs
  • Monitoring, Alarms
  • Drift-time-to-Dist Calib.
  • Shift Procedures
  • Preparation for Roll-In
  • Prototype Readout (1 PDT)
  • Bottled gas
  • kludge cables
  • Proto L3
  • 1 LVPS
  • Portable HV
  • Proto Electronics
  • Proto Examine
  • Full Crate 2 Crate Readout
  • Real Cables, Gas Manifolds
  • Proto L3, 12 LVPS
  • Prod. FEBs Control Boards
  • HV Control
  • Scintillation Counter Trigger
  • Secondary Data Path, Examine
  • Front-end controlled w/ 1553
  • Integrate w/ Trigger Framework
  • Event Display, Status GUIs

Tools
2 Crate Readout 1st Collab Commissioning
Milestone Mar 15, 2000
D0 Phase 1
D0 Phase 2
DAQ, RECO, Trigger
2
Scintillator Commissioning Timeline
Commissioning Channels Calibration and beam
preparation.
Commissioning Channels developing tools to do it
faster.
Testing Operation on Detector
1999 2000



J A S O N
D J F M A M J
J A
Components
  • Full System Readout
  • Prod. FEBs, Cobos
  • Primary Data Path
  • Full Trigger Framework
  • Calibration Programs
  • Monitoring, Alarms
  • Shift Procedures
  • Preparation for Roll-In
  • Full Crate Readout
  • Readout Cables
  • Production SFEs SRCs
  • Production LED Pulser Electronics
  • Examine, 1553 Control
  • Secondary Data Path
  • Integrate w/ Trigger Fwk.
  • Event Display, Status GUIs
  • Counter Crate Preparation
  • Magnets-On Time (check PMT gain)
  • Real HV Signal cables
  • HV Control
  • VME Crates, 68040s
  • Prototype SFE
  • Proto LED pulsers
  • Rad. Source, Oscilloscope
  • Terminal Server communication w/ crates

Tools
2 Crate Readout 1st Collab Commissioning
Milestone Mar 15, 2000
D0 Phase 1
D0 Phase 2
DAQ, RECO, Trigger