Title: Discussion on DAQ Issues


1
Discussion on DAQ Issues
Paul Soler University of Glasgow and Rutherford
Appleton Laboratory
MICE UK Meeting 6 June 2005.
2
Requirements
  • Makoto Yoshida gave talk at collaboration meeting
    in Frascati regarding DAQ (see http//www.lnf.infn
    .it/conference/mice05/miceprogram.html)
  • I will borrow from his talk in this one
  • UNIDAQ is used at KEK for KEK Sci-fi tracker
    testbeam and will be used for the Beamline
    diagnostics equipment to be built and tested at
    Glasgow
  • DAQ team had discussions at Frascati Makoto
    Yoshida (KEK), Emilio Radicioni (Bari),
    Jean-Sebastien Graulich (Geneva), Alan Bross
    (Fermilab), Paul Drumm, Koji Yoshimura (KEK).
    Malcolm has also contributed to Sci-fi DAQ.
  • A skeleton of DAQ specifications is being
    prepared by Emilio
  • Motivation and boundary conditions
  • Detector requirements
  • Slow controls
  • High level state machine
  • Online analysis and storage facilities

3
Event categories
  • DAQ (O(mili-sec), every spill)
  • Detector-DAQ (O(micro-sec), every trigger with
    spill-stamp)
  • detector data
  • ADC / TDC
  • Beamline-DAQ
  • cooling channel
  • RF voltage / phase
  • oscilloscope or flash ADC
  • others?
  • protons on target
  • Secondary particle intensity monitor
  • Slow control/monitor (O(sec), continuously even
    when DAQ is not running)
  • beamline
  • magnet currents / temperature
  • cooling channel
  • RF temperature
  • LH2 absorber temperature
  • solenoid currents / temperature
  • detectors

4
Architecture
Questions about 2 level event building
5
Schematic
6
Conclusions
  • DAQ group started to discuss integration
  • Need to fill the documents on DAQ specification
  • Description on the systems of each sub-group
  • Integration, synchronization
  • To build up MICE control/monitor and DAQ system,
    communication with accelerator experts is
    mandatory
  • Workshop in RAL?
  • Need to integrate UK people in DAQ discussions
    (beamline, controls, sci-fi tracker)