Project Zeus - PowerPoint PPT Presentation

1 / 28
About This Presentation
Title:

Project Zeus

Description:

Outsource all E & M group requirements to a strategic partner ... Landing gears, pneumatics & hydraulics. Commodity Specialists. Interiors. Contracts Management ... – PowerPoint PPT presentation

Number of Views:219
Avg rating:3.0/5.0
Slides: 29
Provided by: ITA142
Category:

less

Transcript and Presenter's Notes

Title: Project Zeus


1
Project Zeus
2
The History
  • Accenture 2003
  • Project Challenge
  • A TUI Group initiated review of group airlines
    maintenance organisations
  • Objective To identify opportunities with cost
    savings potential
  • Findings 4 options to pursue
  • Outsource all E M group requirements to a
    strategic partner
  • Local re-engineering and the implementation of a
    single Engineering IT system
  • (GEMS group engineering maintenance system)
  • Single MRO
  • Competency centres
  • Scenarios evaluated and presented to the TUI
    board decision -
  • Further investigate outsourcing all of EM and
    local re-engineering, including GEMS
  • Abandon single MRO and competency centres

3
Project Zeus
  • Purpose
  • Conducted a review of EM Supply Chain to
    optimise its performance and to position it for
    the future
  • Provided an input to the two remaining options
    under Project Challenge,
  • i.e. outsourcing all of E M and local
    re-engineering
  • Scope
  • Thomsonflys Engineering and Maintenance Supply
    Chain (E M SC)
  • Reviewed structure, skills, processes, systems
    and stock levels
  • Phase I (August 2004 October 2004)
  • Identified key tactical business, process and
    data improvements
  • Proposed strategic improvements, ensuring
    alignment with
  • Opportunities offered within the TUI Group
  • Project Challenge
  • Project LOLA
  • C Check Escalation
  • A Check Optimisation

4
Project Zeus - Phase I (Q3 2004)
  • Delivered as agreed in project terms of reference
  • Documented Findings
  • Tactical Actions Outlined
  • Improving inventory Accuracy
  • Optimising inventory levels
  • Strategic Improvements Outlined
  • Organisation Structure Roles
  • Skills Experience
  • KPIs Accountability
  • Process Redesign Implementation
  • Deliverable incremental to the project terms of
    reference
  • Cost/Benefit Analysis Model and Template for all
    Supply Chain initiativesFeeding into the local
    re-engineering option of Project Challenge

5
EM Supply Chain The story so far
  • Focus of the last 3 years
  • Consistently reducing the cost base whilst
    maintaining an adequate level of service for an
    expanding business model.
  • Delivering in excess of 8.5m pa business
    benefits through -
  • Reduced Headcount by 40 over a period of 18
    months, to end 2003, reducing the cost base by
    over 350k pa
  • Rationalised inventory holding achieving in
    excess of 6m benefits
  • Increased revenue contribution by winning
    profitable business, in excess of 1m pa
  • Delivered bottom line benefits in excess of 1m
    pa through improved contract coverage and
    improved sourcing strategy
  • Strategically outsourced non-core services
    delivering in excess of 250k pa

6
EM Supply Chain The way forward
  • A supply chain function that operates
    pro-actively, effectively and efficiently in
    delivering bottom line business benefits and an
    excellent service to BAL, TUI and its customers.
  • This will include -
  • The design and implementation of an
    organisational model that
  • Is composed primarily of knowledge workers
  • Ensures clarity of roles and responsibility
  • Enables full accountability
  • Enables the outsourcing of all low skills-based
    areas
  • Embedding a culture that encourages teamwork,
    initiative and a can-do attitude
  • Processes that are simple, auditable, measurable
    and streamlined

7
Key findings addressed
  • Inventory data is consistently inaccurate
  • Inventory levels are in excess of business need
  • Insufficient contracts and framework agreements
    in place
  • No consolidated/comprehensive view of procurement
    and invoice settlement activity
  • No active supplier management
  • Unable to assess profitability of services sold
    to customers - poor data quality and quantity
  • People skills less than needed, performance
    less than acceptable

8
Inventory data that was consistently inaccurate
  • Scale of the inaccuracy is hidden by the
  • Reporting format
  • Process halting when the report is delivered?
  • Perpetual stock checks are used solely to correct
    financial records
  • NO root cause analysis
  • NO corrective actions
  • Cause of inaccuracies extend beyond the span of
    control of the Supply Chain team
  • NO clear mechanism to ensure compliance to
    record-keeping from the Engineering community

9
Inventory levels that were in excess of business
need
  • Accountability and ownership unclear
  • Inaccuracies are corrected manually rather than
    systemically
  • Processes and actions for materials forecasting
    planning and the setting of replenishment levels
    are ad-hoc rather than methodical
  • No clear and agreed process/procedure to address
    old removed parts, resulting in an
    accumulation of redundant/obsolete inventory
  • No clear and agreed process/procedure to dispose
    of redundant/obsolete stock

10
Insufficient contracts and framework agreements
being in place
  • Low contract coverage for procured services
  • No contract or framework agreement coverage for
    airline approved parts
  • The process for requesting contracts award is
    ad-hoc and initiated on an as requested basis
    no contracting strategy or formalised, methodical
    process
  • Resources and skills are not in place to
    pro-actively manage negotiation, tender activity
    and contracts, resulting in business exposure
    from unqualified staff entering into
    negotiation and supplier selection
  • Key contract information not readily available
    for repair activity

11
Absence of consolidated/comprehensive view of
procurement and invoice settlement activity
  • Procurement carried out using
  • IES (Integrated Engineering System) for Airline
    Approved Parts
  • Oracle iProcurement for commercial parts and
    general purchasing
  • Services non-PO invoices processed via Oracle
  • No single view of purchasing commitments related
    to Engineer Maintenance activities
  • Disjointed processes and systems, resulting in
    data inaccuracies and significant issues in
    reconciliation
  • IES has been designed primarily from an
    engineering perspective and does not lend
    itself to enabling pro-active analysis, planning
    and management of procurement activity

12
No active supplier management
  • Supplier performance
  • No monitoring or reporting
  • No evaluation meetings
  • No formalised feedback mechanisms
  • No formalised mechanisms for sharing plans and
    projections
  • No strategic sourcing strategies
  • No commodity strategies
  • No visible market data analysis

13
Inability to assess profitability of services
sold to customers - poor data quality and quantity
  • Unreliable recording of man-hours
  • Misunderstanding/misinterpretation of available
    man-hour data
  • All required data not available
  • Disjointed processes and systems between
    engineering, contracts and sales
  • Capacity planning information not readily
    available
  • Resulting in
  • Difficulties in charging correct amounts to
    customer
  • Difficulties in assessing potential profitability
  • Difficulties in assessing actual profitability

14
People skills less than needed, performance
less than acceptable
  • Organisation structure and boundaries are not
    conducive to team work
  • Process are broken and disjointed across the
    organisation
  • Skills level is not sufficient for an effective
    supply chain management group
  • Resources mix inappropriate
  • On-going headcount reductions and business
    uncertainty for Thomsonfly as a whole has
    dampened motivation and developed a culture where
    job security is sometimes managed by protecting
    job content knowledge
  • Morale and motivation too low for the
    productivity and performance required going
    forward
  • Environment not conducive to exhibiting
    initiative or gaining recognition for any
    significant contribution
  • Silo mentality - very little periphery vision

15
Implemented a Tactical ActionImproving Inventory
Accuracy
  • Luton Main Stores (highest occurrence of
    inaccuracies)
  • Root Cause Analysis to be initiated immediately
  • Corrective actions, including any process
    changes, to be applied to all relevant stock
    locations
  • 3rd-Party Agencies
  • Root Cause Analysis to be initiated immediately
  • Corrective actions, including any process
    changes, to be implemented
  • Perpetual Stock Check (PSC) Process
  • Immediate redesign of reports to accurately
    reflect scale of discrepancies
  • Redesign process
  • To capture, where possible, cause and effect
    information
  • To complete only when corrective and preventative
    action has been implemented for each cause

16
Organisation Structure Roles
Supply Chain Manager
Contracts Management Group Leader
Services Management Group Leader
Commodity Management Group Leader
Contracts Specialists
Revenue Specialists
Services Specialists
KPIs
KPIs
17
Commodity Specialists
  • Role Responsibility
  • Materials Planning
  • Commodity strategies
  • Stock level
  • Stock accuracy
  • Procurement
  • Supplier Performance Management
  • Supply-base analysis
  • Contracting requirements
  • Contract management
  • Teamwork with
  • Contracts Specialists
  • Outsource Specialists
  • Revenue Specialists
  • Liaison with engineering community for materials
    needs for all maintenance and repair activity
  • Management of loans
  • Repair and warranty management
  • Management reporting
  • Skills Experience
  • Aviation Engineering Maintenance supply-base
    knowledge
  • Procurement and/or Materials planning experience
  • Degree/Diploma plus 5 years
  • Commercially astute
  • Strong inter-personal
  • Strong communication (written verbal)
  • Highly analytical
  • Team player
  • KPIs Accountability
  • Minimise stock excess stock levels vs. usage
  • Minimise stock shortages (AOG Loans data)
  • Minimisation of Loans-In
  • Revenue from Loans-Out Sales
  • Savings Cost optimisation
  • Supplier Scorecards (quality of supplier
    performance)
  • Internal Customer Satisfaction
  • Performance against contracts

18
Commodity SpecialistsClosed-loop Performance
Improvement
  • Role Responsibility
  • Materials Planning
  • Commodity strategies
  • Stock level
  • Stock accuracy
  • Procurement
  • Supplier Performance Management
  • Supply-base analysis
  • Contracting requirements
  • Contract management
  • Teamwork with
  • Contracts Specialists
  • Outsource Specialists
  • Revenue Specialists
  • Liaison with engineering community for materials
    needs for all maintenance and repair activity
  • Management of loans
  • Repair and warranty management
  • Management reporting

Performance in Role
Capability Required
  • KPIs Accountability
  • Minimise stock excess stock levels vs. usage
  • Minimise stock shortages (AOG Loans data)
  • Minimisation of Loans-In
  • Revenue from Loans-Out Sales
  • Savings Cost optimisation
  • Supplier Scorecards (quality of supplier
    performance)
  • Internal Customer Satisfaction
  • Performance against contracts
  • Skills Experience
  • Aviation Engineering Maintenance supply-base
    knowledge
  • Procurement and/or Materials planning experience
  • Degree/Diploma plus 5 years
  • Commercially astute
  • Strong inter-personal
  • Strong communication (written verbal)
  • Highly analytical
  • Team player

Development Plan
19
Commodity Management Group Leader
  • Role Responsibility
  • Leadership and co-ordination of Commodity
    Specialist team
  • Liaison with all areas of BAL and TUI pertinent
    to commodity planning and delivery
  • Management reporting
  • Performance management
  • Skills Experience
  • Aviation Engineering Maintenance supply-base
    knowledge
  • Degree plus 10 years
  • Procurement and/or materials planning
  • Sound leadership
  • Strong inter-personal
  • Strong communication (written verbal)
  • Commercially astute
  • Highly analytical
  • Team player
  • KPIs Accountability
  • Employee Satisfaction
  • 360 degree feedback
  • Aggregated team KPIs

20
Commodity Management Group LeaderClosed-loop
Performance Improvement
  • Role Responsibility
  • Leadership and co-ordination of Commodity
    Specialist team
  • Liaison with all areas of BAL and TUI pertinent
    to commodity planning and delivery
  • Management reporting
  • Performance management

Performance in Role
Capability Required
  • Skills Experience
  • Aviation Engineering Maintenance supply-base
    knowledge
  • Degree plus 10 years
  • Procurement and/or materials planning
  • Sound leadership
  • Strong inter-personal
  • Strong communication (written verbal)
  • Commercially astute
  • Highly analytical
  • Team player
  • KPIs Accountability
  • Employee Satisfaction
  • 360 degree feedback
  • Aggregated team KPIs

Development Plan
Leadership Performance
21
Outsourced Services
  • Stores
  • Goods receiving
  • Returns Management
  • Warehousing and Stores Movement
  • Inventory Pooling
  • Logistics
  • UK Overseas Planning Handling
  • Sales Agents
  • Surplus Stock
  • Repair Agents
  • Engines APUs
  • Components
  • Maintenance (C-Checks, A-Checks, Line,
    Unscheduled)
  • Overflow
  • Strategic/Planned

22
Strategic Process Redesign ImplementationInvent
ory Level Management
Key Inventory Definitions Redundant No longer
valid for Fleet Obsolete No longer valid for any
airline Excess Too much valid stock
  • Included -
  • A comprehensive disposal timetable
  • For Redundant/Obsolete Stock
  • Quarterly review and disposal process capturing
    input for the KPIs of relevant Commodity
    Specialists
  • Event-based review and disposal process for stock
    replaced through normal course of business and/or
    exceptional events (e.g REFRESH programmes)
  • For Excess Stock
  • Quarterly review and disposal process for
    potentially excess stock capturing input for
    the KPIs of relevant Commodity Specialists
  • Maintenance plan-based review and tuning of
    replenishment levels (by Commodity Specialists
    for each of their commodities)
  • Key inputs for both processes (i.e. Quarterly
    reviews and plan-based reviews)
  • Stock Usage vs. Stock Turns
  • Forecasted Usage
  • Current and projected market value and purchase
    price
  • Business impact reporting of stock shortages
    (AOG/Loan Costs)
  • capturing input for the KPIs of relevant
    Commodity Specialists

23
Strategic Process Redesign ImplementationStrate
gic Sourcing Contract Management
  • Included -
  • The development and ongoing management of
  • Sourcing Strategies
  • Contract Strategies
  • Full life-cycle management and administration of
  • Tenders
  • Contracts
  • Framework Agreements
  • Monitoring and reporting of
  • The coverage of commodities and services with
    contracts and framework agreements
  • Procurement activity against contracts and
    framework agreements
  • Performance and continued fit of contracts and
    framework agreements
  • Off-contract activity

24
Supplier Management
  • Included -
  • Supplier Scorecards that enable analysis and
    decision-making related to supplier performance
    in key areas, e.g. -
  • Price
  • Quality
  • Delivery/Lead-time
  • Responsiveness
  • Data collection processes that enable the
    construction of the Supplier Scorecards based on
    consistent and, wherever possible, objective data
  • Supplier performance review process, including -
  • Internal review
  • Supplier feedback
  • Supplier ranking
  • Supply base optimisation

25
Market Development and Customer Satisfaction
  • Included -
  • Business and market development strategies and
    plans
  • Sales performance management
  • Key decision-making data to win profitable
    business
  • Customer satisfaction surveys and associated
    processes and timetable
  • Market/Customer review process, including -
  • Internal review
  • Feedback from Customers
  • Customer ranking
  • Customer base optimisation for maximum
    profitability

26
People Management
  • Included -
  • Date collection, monitoring and reporting
    processes for all KPIs
  • Employee satisfaction surveys and associated
    processes and timetable
  • 360 degree feedback process
  • On-going skills review and gap analysis
  • Group and individual development plans and
    timetables
  • Skip-level meetings (i.e. relatively informal
    meeting between a manager and staff two levels
    away in the organisations structure, skipping a
    level)
  • High-visibility employee recognition programmes

27
Transition Route Map with Optional Outsourcing
of Stores
8-10 weeks
6-8 weeks
8-10 weeks
  • Finalise embed organisation
  • Review performance of all staff in new roles
  • Recruitment shortlist identified if any role
    needs to b revisited
  • Assessment centres completed and new staff
    assigned
  • Skills gap analysis and associated development
    plans in place for any new appointments
  • Probationary performance targets in place for new
    appointment
  • Routine performance target established for
    remaining staff
  • Redundancy processes completed, if appropriate
  • Set-up mobilisation
  • HR support and participation initiated
  • Group Leader assignments
  • Target roles for existing Group Leaders
    identified
  • Recruitment shortlist identified
  • Group leader Assessment centres completed and
    group leaders assigned
  • Skills gap analysis and associated development
    plans in place
  • Probationary performance targets in place
  • Specialists assignments
  • Target specialists roles for existing staff
    identified
  • Recruitment shortlist identified
  • Specialists Assessment centres completed and
    staff assigned
  • Skills gap analysis and associated development
    plans in place
  • Probationary performance targets in place
  • Redundancy processes completed
  • New organisation
  • Staff feedback cycles completed

6 month probationary period for each role
  • Role profiles and associated target skills
    matrix in place
  • Recruitment campaign initiated
  • Assessment centres designed and scheduled

Design of new business process and procedures
completed
Ongoing Performance monitoring and review
Probationary Performance monitoring and review
Rationalisation of STORES
Optional Outsourcing of STORES
28
Project Challenges
  • Support increased number of outsourced
    maintenance Checks
  • Management of complex component support
    arrangements across mixed fleet i.e. Thomsonfly,
    Nordic, Third Party, etc
  • Maintaining business continuity whilst
    transitioning the Supply Chain through its
    organisational restructure
  • Facing the challenge of up-skilling and changes
    to the Fabric of the business
  • For employees this means either
  • Repair (develop, train, grow)
  • Remove (re-deploy elsewhere or leave)
  • Replace (external recruitment)
  • For peers this means exposure
  • Embedding a culture that encourages teamwork,
    initiative and a can-do attitude with processes
    that are simple, auditable, measurable and
    streamlined