1
WP 1 (Globus)Status Report
  • Massimo Sgaravatto
  • INFN Padova
  • for the INFN Globus group
  • globus_at_infn.it

2
Meetings
  • Last meeting January 11, 2001
  • No other meetings scheduled

3
Security (GSI)
  • Management of grid-mapfile updates
  • Script to publish user certificates in LDAP
    server (done G. Lo Biondo)
  • LDAP server populated by CA manager (to do)
  • Members of groups published in LDAP server
    (update done by administrators of these groups)
  • Web tool to manage groups (work in progress C.
    Rocca)
  • Evaluation of existing tools (done)
  • Tool for end user (to do)
  • Tool (certretrieve) used to query the LDAP server
    (for example to get the members of a specific
    group) the results are grid-mapfile entries
    (done G. Lo Biondo)
  • Tests with Kerberos (AFS)
  • Analysis of how access AFS now and open issues
    (done F. Prelz)
  • Address the issues (to do ??)

4
Information Service (GIS)
  • Netscape LDAP server as mirror of top level GIIS
    (to do G. Lo Biondo, G. Vita Finzi, F. Semeria,
    E. Fasanelli, Ferrara)
  • Review the information gathered from the various
    machines and published in the GIS (to do G. Lo
    Biondo, G. Vita Finzi, F. Semeria, E. Fasanelli,
    Ferrara)
  • Tests on performance and scalability (work in
    progress F. Semeria, G. Vita Finzi, G. Lo
    Biondo, E. Fasanelli, Ferrara)

5
Resource Management
  • Fixes for job manager memory leaks (done)
  • Tests with GRAM API (done F. Giacomini)
  • GRAM GIS cooperation (work in progress)
  • Review and integrate the information concerning
    a FARM published in the GIS
  • First proposal defined (considering LSF and
    Condor) (done M. Biasotto, M. Sgaravatto)
  • Necessary to integrate this proposal considering
    also PBS (work in progress Torino)
  • Development of scripts for LSF (work in progress
    M. Biasotto)
  • Tests with MPICH-G2 (done Alfieri, Spataro)
  • MPICH-G2 vs MPICH
  • SMP, LAN, WAN (Pr Pd)

6
Globus deployment
  • Patches (for job manager) to apply to INFN-GRID
    1.2 installations (done Pisa)
  • INFN-GRID 1.3 (work in progress Pisa)
  • Fixes for Globus jobmanager memory leaks
  • GDMP 1.2
  • Distribution of various Globus compilations
    (Kerberos, MPICH-G2)
  • Certretrieve
  • Other bug fixes
  • Web software repository (done L. Fonti, G. Vita
    Finzi)
  • www.infn.it/grid/dist.html

7
Data Management
  • Tests with globusftp alpha release 2 (work in
    progress Cnaf, Torino, Napoli, Padova)
  • Collaboration with WP Network
  • Tests with replica catalog software alpha release
    2 (work in progress Pisa)
  • Collaboration with WP Data Management

8
Report conclusivo
  • Ch. 1 - Introduction (F. Prelz, M. Sgaravatto)
  • Ch. 2 - Globus deployment and installation tools
    (F. Donno)
  • Ch. 3 Security (F.Prelz)
  • Ch. 4 Information Service (G. Lo Biondo)
  • Ch. 5 Resource Management (M. Sgaravatto)
  • Ch. 6 Data Access and Migration (L. Gaido)
  • Ch. 7 Other services (M. Sgaravatto)
  • Ch. 8 Experiments
  • Alice
  • Cms
  • Atlas (??)
  • Ch. 9 Conclusions (F. Prelz, M. Sgaravatto)
  • Editor F. Prelz

9
Report conclusivo schedula
  • 11/1/2001 ?
  • Definizione della struttura del documento
  • Assegnazione dei chapter agli autori
  • Scelta delleditor
  • 28/1/2001 ?
  • Gli autori producono un primo draft del loro
    chapter, e lo inviano a globus_at_infn.it
  • 4/2/2001
  • Deadline per inviare feedback sul primo draft
  • 11/2/2001
  • Gli autori producono un secondo draft, e lo
    inviano alleditor
  • 20/2/2001
  • Leditor produce una prima versione del
    documento, e lo invia a globus_at_infn.it
  • 23/2/2001
  • Deadline per mandare feedback alleditor
  • 28/2/2001
  • Leditor produce la versione definitiva

10