Title: Request by Mayor Slay:
1(No Transcript)
2(No Transcript)
3DANFORTH FOUNDATION INVOLVEMENT
- Request by Mayor Slay
- Funding Great Rivers Greenway District
Riverfront Master Plan. - Funding Engineering work for realistic
structural design of the Connector. - Funding Design of the public space for the
Connector. - Assess potential financial resources/support.
- Recommendation on feasibility to proceed.
4DANFORTH FOUNDATION INVOLVEMENT
- Regional Priority
- Improving the Arch Riverfront.
- Themes
- What are the possibilities?
- Approach must be grounded in reality.
5ST. LOUIS CENTRAL RIVERFRONT
- Challenges
- Gateway Arch/Arch Grounds.
- Memorial status.
- NPS design control.
- Limited land area.
- River dynamics and conditions.
- Navigation issues/river commerce.
- Financing issues.
- Operating issues.
6ST. LOUIS CENTRAL RIVERFRONT
7ST. LOUIS CENTRAL RIVERFRONT
- Objectives
- Tourist and resident destination.
- Attractions and amenities.
- Economic activity.
- Connections.
- Unique design.
8ST. LOUIS CENTRAL RIVERFRONT
- Current Status St. Louis Riverfront Master
Plan - Great Rivers Greenway (GRG) leading effort.
- Diana Balmori/HOK leading design and planning
process. - GRG and Danforth Foundation providing funding.
- Major theme Connectivity.
9ST. LOUIS CENTRAL RIVERFRONT
- Riverfront Master Plan Preliminary Concept
DRAFT
10ST. LOUIS CENTRAL RIVERFRONT
- Current Activities
- Assess feasibility of preliminary concept.
- Computer and physical modeling.
- Effects on River current.
- Effects on River sediment flow.
- Navigation simulator.
- Island protection system.
- Maintenance and operations analysis.
-
- Economic / venue analysis.
11ARCH GROUNDS CONNECTOR PROJECT
- Objectives
- Integrate Arch Grounds with Downtown.
- Create architecturally significant
boulevard-like environment. - Create space for public and special events.
- Provide safer pedestrian/vehicular movement.
12ARCH GROUNDS CONNECTOR PROJECT
- History
- Debated for past 40 years.
- Recommendation Downtown Development Action
Plan. - Approved by City Planning Commission December
1999. - Stakeholder consensus (2003).
13ARCH GROUNDS CONNECTOR PROJECT
- Challenges
- NPS design control view shed from Old
Courthouse. - NPS limitations on commercial activity.
- Maintaining traffic flow on Memorial Drive.
- Tunnel considerations.
- Financing issues.
- Operating issues.
14ARCH GROUNDS CONNECTOR PROJECT
15ARCH GROUNDS CONNECTOR PROJECT
- Current Status Engineering and Design
- Danforth Foundation retained design/engineering
team to - Examine three structural options.
- Construction cost estimates.
- Construction timelines.
- Maintenance and operation cost estimates.
- Arcturis is project manager Jacobs, ARUP, ABNA
and Vector Communications also on team. - Quality design Retained Thomas Balsley and Leni
Schwendinger. - Detailed concept by early 2007.
16ARCH GROUNDS CONNECTOR PROJECT
Memorial Drive Configurations
17ARCH GROUNDS CONNECTOR PROJECT
18ARCH GROUNDS CONNECTOR PROJECT
19ARCH GROUNDS CONNECTOR PROJECT
20ARCH GROUNDS CONNECTOR PROJECT
21REGIONAL SIGNIFICANCEWhy is this Important?
- Great Cities Build on Community Pride
22REGIONAL SIGNIFICANCEWhy is this Important?
- Great Cities Build on Momentum/Add New Products
23REGIONAL SIGNIFICANCEWhy is this Important?
- Great Cities Connect the Dots
Downtown and Central Riverfront
24REGIONAL SIGNIFICANCEWhy is this Important?
- Great Cities Develop Meaningful Projects
25REGIONAL SIGNIFICANCE
- Regional Opinion Survey September 2005
- Overwhelming regional support (84) for
revitalization of the riverfront.
26REGIONAL SIGNIFICANCE
- Regional Opinion Survey September 2005
- Support for variety of riverfront improvements
strongest support for family oriented activities.
27REGIONAL SIGNIFICANCE
- Regional Opinion Survey September 2005
- Overwhelming support (76) for plan to cover
depressed lanes of I-70.
28(No Transcript)