Title: Status of the EEE telescopes in BolognaReggio Emilia
1Status of the EEE telescopes in Bologna/Reggio
Emilia
2EEE Project
People involved in the EEE Project in Bologna
G. Sartorelli E. Bressan F. Cindolo M. Garbini C.
Sbarra E. Scapparone M. Selvi
3EEE Project
- Works done in Bologna since october 2006
- Tests on all the chambers delivered in Bologna.
- Spatial resolution measurements
- Data analysis
- Optimization of analysis code for schools
- Installation inside schools
- Trigger card and GPS interface (E.S.) test
- Divulgative DVD
4EEE Project
As reported in the previous meeting we received 3
MRPC on December 2005, serial number 11, 17, 18.
We tested them extensively and found them very
noisy. Another set of MRPCs arrived in October
2006, serial number 50, 51, 52. They were built
at CERN by Bologna Liceo Fermi students. Very
good results on efficiency and rates were
obtained with the second telescope (presented in
the previous EEE Project EC meeting) In December
2006 all the MRPCs for the Bologna area
telescopes arrived. We tested (gas tightness,
efficiency and rates) all the chambers obtaining
almost the same results.
5EEE Project
Preliminary tests summary
A total of 18 MRPCs (6 telescopes) have been
tested
6Efficiency of the school telescopes
7Rates of the school telescopes
8Spatial resolution (1)
We used the position (strip/time difference) on
upper and lower chambers to calculate the
expected position on the middle chamber both for
x and y coordinate
Our coordinate system The x coordinate is
orthogonal to the strips The y coordinate is
along the strips
Trigger coincidence of the 3 MRPCs
9Spatial resolution (2) y coordinate
Time difference distributions are not centered in
0 ? Offset
Difference between the expected position on
middle chamber and the measured one
10Spatial resolution (3) y coordinate
If we correct data for each strip offset we obtain
x-y distribution before and after correction
The sigma is 229 ps leading to a time resolution
of st s? (2/3)1/2 ? 187 ps Taking into
account the signal propagation velocity (17.3
cm/ns) sy ? 1.6 cm
11Spatial resolution (4) x coordinate
Taking into account the strip pitch (3.2 cm) sx
? 0.96 cm
12 Other measurements
We measured the muon rate as a function of the
distance between the MRPCs.
We also measured the muon reconstructed zenith
angle and compared it with simulation
13 Trigger rate measurement
Using trigger card as a scaler The LTM card
has the capability to measure single, double and
triple coincidence rate.
Using GPS time To obtain this distribution we
defined the start of run time as the time of the
first trigger (both GPS or TDC) and then
calculated the time distance between each event
and the start.
14Further Tests
In order to have a complete VME data acquisition
system we tested the Trigger card (LTM) designed
by E. Scapparone and the GPS interface.
Provides MRPCs trigger
Provides GPS time and reset TDC clock counters
15Tools for schools
- In order to help students and teachers in
monitoring the telescope we prepared a command
panel easy to use. - From this panel it is possible to
- Organize data files
- Analyze data
- Look to histograms
- Look to event display
16Reggio Emilia inauguration on 11/05/07
17Status of Reggio Emilia telescope
After inauguration of the telescope in May we are
working with students and teachers to set the
detector to work. Soon we will have the detector
in full data acquisition. We were waiting for GPS
interface and now they are ready! See Eugenio
Scapparone
Next telescope inauguration
Installation of telescope in the Liceo Fermi in
Bologna is almost completed and we will be ready
to inaugurate soon
Next telescope installation
We are planning installation inside Liceo Galvani
in Bologna. We are waiting for DC/DC converters
and FEAs (few weeks)
18After installation inside Liceo Galvani we will
have 3 telescopes in the Bologna area
19Conclusions
- All the MRPCs delivered in Bologna have been
tested - Except the first set all the MRPCs show good
performances - The spatial resolution has been measured in the
Bologna INFN lab. to be 1.96 x 0.96 cm2 - After tests on Trigger card and GPS Interface the
DAQ system is fully VME based - Analysis codes have been optimized to monitor the
detector and user friendly interface has been
prepared - Installation and work inside and with schools
started and by the end of this year we may have 3
working telescopes in Bologna the Reggio Emilia
one
20Extra
21Preliminary 1/? measurement
We tried to evaluate the ? of the muons crossing
the telescope
22Some problems about first telescope why noisy?