Alberta Silviculture Guide Project Progression Plan - PowerPoint PPT Presentation

1 / 18
About This Presentation
Title:

Alberta Silviculture Guide Project Progression Plan

Description:

Mixedwood Management Association. Alberta Silviculture Guide Project Progression Plan ... communicate plans & actions (to MWMA, to FRIAA, to technical advisory ... – PowerPoint PPT presentation

Number of Views:94
Avg rating:3.0/5.0
Slides: 19
Provided by: scottfo
Category:

less

Transcript and Presenter's Notes

Title: Alberta Silviculture Guide Project Progression Plan


1
Alberta Silviculture Guide Project Progression
Plan
2
Project Progression Plan
3
Project Management Bodies
  • 1. Steering Committee
  • 2. Project Manager
  • 3. Technical Advisory Committee
  • 4. Mixedwood Management Association

4
Steering Committee Roles
  • Management
  • people selection (technical advisory committee,
    service providers)
  • project schedule
  • communicate plans actions (to MWMA, to FRIAA,
    to technical advisory committee)
  • project budgeting (tracking, reporting)
  • project coordination and tasking

5
Steering Committee Roles
  • Content
  • assigning tasks to service providers and
    integrating responses into project
  • facilitate technical advisory committee
  • design guide outline
  • modualization and integration of guide components

6
Project Manager Roles
  • Coordinating interaction and outputs between
    service providers, technical advisory committee,
    and steering committee
  • manage against timelines
  • documentation and reporting to support the two
    points above

7
Technical Advisory Committee Roles
  • Respond to content
  • missing info
  • wrong info
  • insufficient detail
  • Review technical info using knowledge assessment
    protocol
  • Input on how to help populate guide with
    available data

8
Mixedwood Management Associations Role
  • Confirmation on how guide is being developed
  • provide input similar to technical advisory
    committee

9
Project Progression Plan
10
Guide Design
  • GDC has been hired as the service provider to
    come up with the guide design framework
  • A first iteration through the project progression
    plan is necessary to work through how we think
    the guide should work, what type of data we think
    we have, and how we want components presented in
    order that we can come up with a reasonable
    framework for guide design that can be taken to
    the technical advisory committee

11
Guide Design
  • The first iteration would be very coarse and
    could be populated with dummy data just to get an
    idea of how the design would work
  • A number of meetings have already occurred to
    begin putting together a design framework
  • A workshop is scheduled for March 18th in which
    we will present the guide design to the TAC for
    comments and suggestions

12
Project Progression Plan
13
Population of Guide Components
  • Once we have a framework for guide design we can
    begin the process of hiring appropriate service
    providers to populate the necessary components of
    the guide
  • The second iteration would still be coarse, but
    populated with readily available real world data
  • The purpose of the second iteration is to have a
    good first approximation of the various project
    components that the group can take to the TAC in
    order to get critical review and redesign
    feedback

14
Project Progression Plan
15
Editing and Integration
  • It will be necessary to integrate various guide
    components into one cohesive and flowing document
    prior to production and publishing
  • It is our goal to have gone through the second
    iteration in which we have gotten feedback from
    the TAC on editing and integration and have a
    draft document ready for production and
    publishing by September 2004

16
Project Progression Plan
17
Production and Publishing
  • A digital first draft of the guide would be
    available for laser jet printing by October 2004
  • The first draft will still be relatively coarse
    in nature as it will be based on a combination of
    expert opinion and readily available literature
    and data

18
3rd Iteration
  • The third iteration through the project
    progression structure would aim to strengthen the
    guide by filling data gaps through targetted
    research or detailed data analysis
  • Timelines for completion of a 3rd iteration would
    be dependent on level of resolution desired and
    availability of future funding