Title: Future activities of the COMPASS polarized target
1Future activitiesof the COMPASS polarized target
- N. Doshita
- University of Bochum, Germany
2Contents
The COMPASS experiment
The Polarized Target 2002-2004
Upgrade for 2006
Summary
3CERN and COMPASS
4The COMPASS experiment
Physics data taking started in 2002
- Muon program
- -Nucleon spin structure --- gluon
contribution - -Polarized muon beam and polarized nucleon
target - Hadron program
- -Meson spectroscopy
- -hadron beam and Hydrogen, carbon target
5Gluon polarization measurement in the COMPASS
Experimentally measurable double spin cross
section asymmetry via PGF
PB Beam polarization PT Target polarization f
Dilution factor N Number of events
Direction of beam polarization
Dilution factor polarizable nucleon rate in
material
?
Direction of target polarization
Aphys ? Gluon polarization
(double spin asymmetry)
Extraction
What kinds of events can be approached to realize
PGF ?
- Open charm production events
- High-PT hadron production events
D0, D0
Low statistics
6Requirement of Polarized Target
Statistical accuracy
-High polarization -High dilution factor -Large
target
COMPASS polarized target
- - Target material 6LiD (high
dilution factor), 350g - - Magnetic field 2.5T
superconducting magnet - Temperature 60mK and 300mW at
300mK - by
dilution refrigerator
?
Dynamic Nuclear Polarization with Microwave
Deuteron polarization more than 50
7COMPASS polarized target2002 2004
Still pumping line
Magnet 2.5 T solenoid 0.5 T
dipole
3He precooling line
µ beam
69 mrad
Twin target cells 60 cm 60 cm
Mixing chamber 6 L
8Dilution refrigerator
3He Pumping line
Magnet
Beam
9Upgrade for 2006
10Upgrade part 1
Large acceptance
- F 60cm
- 30 gain in statistics
2.5T Solenoid, 0.5T Dipole
- Solenoid lt 100 ppm homogeneity
- 25 L/hour Liq. He
11Upgrade part 2
3 target cells
To reduce false asymmetry
Large cavity
Fit on new magnet
talk of Y. Kisselev
12Upgraded PT system for 2006
Ready in next spring
Data taking June 14th
13 COMPASS Oxford Danfysik magnet
- OD magnet assembly was finished at December 2004
and has been tested in Saclay. - It is almost finished to test the magnet and
construct its instruments. - The magnet is being delivered to CERN in the end
of this month.
14COMPASS OD magnet
1st attempt to get uniform field (June 24th)
obtained less than 100 ppm homogeneity now
100 ppm
Request is 100 ppm
Target region 130cm
15Summary
- The COMPASS polarized target has been used
since 2002.
- The system is upgraded for 2006 .
- 3 target cells - New large acceptance magnet -
New microwave cavity
- Expect high statistics and high quality data in
2006