Description:

URD. An user requirements document (URD) template is being prepared. ... Collect URD and identify common hardware. Work on gateways for existing software frameworks: ... – PowerPoint PPT presentation

Number of Views:45
Avg rating:3.0/5.0
Slides: 19
Provided by: burkha2
Category:

less

Transcript and Presenter's Notes

Title: ECS Experiment Control System


1
ECS Experiment Control System
  • Burkhard Kolb, GSI
  • CBM collaboration meeting
  • Darmstadt, March 9 - 12, 2005

2
Main Goal
  • The Experiment Control system (ECS) has to ensure
    the coherent and safe operation of the CBM
    experiment.
  • One main requirement is the easy integration of
    independently developed components.

3
What it does - and what not
  • The Experiment Control System is used to
    supervise and operate all detector hardware, the
    common experimental infrastructure, it provides
    the status of detector components for the CBM
    DAQ, it interfaces to the GSI infrastructure and
    to the SIS accelerator.
  • The ECS does not deal with the safety of
    personnel.

4
Client - Server Model
  • The clients are the distributed user interfaces
    (GUI), archiving stations, alarm handlers, and
    other high-level interfaces.
  • The servers are agents running either in the DCS
    boards or workstations or single board computers
    which interface to the specific detector or
    infrastructure hardware.
  • Clients and servers communicate overIP networks
    with protocols like channel access (CA), DIM or
    similar.

5
Standalone operation
  • The ECS has to be capable of operating the
    detector hardware without the DAQ system.
    Therefore it should wherever possible use its own
    control path to the hardware.

6
Partitioning
  • The ECS can be partitioned in sub-detectors for
    development and separate testing on a per agent
    basis.
  • GUI panels, archiving, and alarm handling also
    can be built accordingly.

7
Integration
  • The ECS has to integrate independently developed
    components by providing interoperability between
    a small number of allowed standards (field
    busses, SCADA systems, common hardware)

8
Functionality 1 - Setting
  • The ECS sets the detector system into RUN status
    by loading parameters and configuration files
    from the database to detector and trigger
    hardware. This includes the loading of
    programmable logic (FPGAs,...)
  • For speed of operation the database will be
    distributed and local caches in agents or
    intermediate management layers will be used (LAM
    and WAM).

9
Functionality 2 - Monitoring
  • The ECS monitors operational parameters from
    detectors, trigger hardware, high and low voltage
    supplies, gas systems, position measurement
    systems, and environment and provides a GUI to
    these process variables (PV) to the user.
  • All relevant process variables are archived to
    the database.
  • Historical views and trending is provided to the
    user and via APIs to the analysis software.

10
Functionality 3 - Archiving
  • All relevant process variables are archived to
    the database (ORACLE)
  • Historical views and trending is provided to the
    user and via APIs to the analysis software.

11
Functionality 4 - Alarms
  • The state of critical process variables is
    constantly monitored and compared against
    predefined boundaries (on server).
  • The alarm handling client alerts the operator and
    logs alarm states and acknowledgments to log
    files (or database).
  • Interlocks and detector safety are provided with
    dedicated hardware (i.e. PLCs), but the ECS
    monitors this hardware and the interlock status.

12
Functionality 5 - Access
  • Access Control for modification of parameters in
    the ECS and in the database are provided through
    user accounts and passwords.

13
Software
  • Open source software
  • For the reason of maintainability and licensing
    costs we want to use wherever possible open
    source software. There are several packages which
    are used with good experience in the HEP
    community, like EPICS and DIM.
  • Commercial SCADA
  • On the other hand there are many laboratory style
    hardware setups like gas systems, high voltage
    supplies, connections to PLCs, which are build
    around commercial SCADA packages like LabView. We
    will try to interconnect these sub systems to the
    general ECS by writing gateways.

14
Hardware
  • Early on a set of standardized hardware
    components which can be reused in the different
    detector sections has to be identified, as there
    are
  • High Voltage
  • Low voltage power supplies
  • Crates and racks
  • Temperature sensors
  • Position sensors
  • Gas supply systems, valves, flow meters
  • Through standardization we will have fewer
    different components and need less spares.

15
DCS system
  • The detector control system (DCS) is an agent
    unit for many detector front-end components.
  • It acts as a status and event server for the ECS
    system as well as a client for controlling all
    front-end electronics.
  • The DCS will be implemented as a single board
    computer.
  • It consists of DCS hardware (DCS board), an
    operating system and the DCS application.

16
DCS functionality
  • The main tasks of DCS are to securely switch on
    and off front-end electronics, to configure all
    components (including FPGAs), and to set and
    monitor all software and hardware parameters.
  • Additionally the DCS should implement the runtime
    refresh for all FPGAs exposed to high radiation.
  • DCS acts as an agent to the experiment control
    system (ECS).

17
URD
  • An user requirements document (URD) template is
    being prepared.
  • It will be send to all detector group
    coordinators to collect the information about the
    to be controlled hardware.

18
Next steps
  • Constitute ECS group.
  • Collect URD and identify common hardware.
  • Work on gateways for existing software
    frameworks
  • EPICS
  • DIM
  • Labview
  • OPC
Write a Comment