TRD Sector 8 SM Commissioning Status and Plan - PowerPoint PPT Presentation

1 / 11
About This Presentation
Title:

TRD Sector 8 SM Commissioning Status and Plan

Description:

... (David, Tom). FeeServer, ControlEngine, DB (Kai, David, Tom, Uwe) ... Assuming 50 m cable length from ACORDE to CTP, pre-trigger latency is ~1 us (0 pre-samples) ... – PowerPoint PPT presentation

Number of Views:31
Avg rating:3.0/5.0
Slides: 12
Provided by: wwwali
Category:

less

Transcript and Presenter's Notes

Title: TRD Sector 8 SM Commissioning Status and Plan


1
TRD Sector 8 SM CommissioningStatus and Plan
  • Ken Oyama
  • Mar. 30, 2007
  • TRD Status Meeting _at_ Bonn

2
First Commissioning Try Till 2 Days Ago
  • tested Items so far
  • LV Services (David, Kai, Benjamin, Christian).
  • DCS network infrastructure (David, Tom).
  • FeeServer, ControlEngine, DB (Kai, David, Tom,
    Uwe).
  • Control with PVSS etc (Georgios, Jorge, Kai,
    Michael, Jens).
  • Cooling (Ana).
  • some temporary stuff
  • Linux worker node with our
  • diagnostics tools used at KIP.
  • .bin ? .root ? digits conversion
  • tools (Minjung).
  • Software Interlock running on
  • PCU (Kai, David, Tom).

3
Working LV ans Successful in Configuration
PVSS panels by Georgios and Michael were used for
operation.
4
Results of the Last Try
  • Services prepared by David et.al. work very well.
  • Readout chamber status and operation
  • Good, no significant changes from SXL2 tests,
  • Power up successful with normal current. No
    shorts.
  • Configuration was ok with script based tools.
  • Dummy configuration sent to the chambers with
    full chain.
  • Noise scanned (13 events) using DCS board readout
  • next slides.
  • Cooling performance is good (23 K rise).
  • Dead HC (S2L0) is still dead unfortunately.

5
The First DCS-readout Noise Scanning
6
More Precise Performance Study Started
Plots by Minjung
RMS noise nominal 1.25 ADC counts 1300
electrons except for bad MCMs
7
For Further Commissioning
  • Final goal
  • Take cosmic data with final DCS infrastructure
    and DAQ and trigger infrastructure directly
    related to TRD.
  • Gas will be available middle of Apr. (Chilo).
  • H.V. distribution box will be available end of
    May (Maria).
  • DCS Infrastructure will be debugged a lot in
    Apr..
  • Performance tests will be done end of Apr. (Kai
    et.al.).
  • New FSM based DCS system will be installed end of
    Apr. (Jorge).
  • Optical fibers ready (David). DAQ ready.
  • (5 DDL?) GTU will be ready end of Apr. (Volker
    et.al.).
  • Pre-trigger (partially available, discussed
    later).
  • Software, Analysis Tools (MOOD Benjamin,
    Minjung).

8
Commissioning with CTP and Trigger Detectors
  • LTUTTCex are there (we can borrow).
  • ACORDE is ready to provide trigger to the CTP.
  • Assuming 50 m cable length from ACORDE to CTP,
    pre-trigger latency is 1 us (0 pre-samples).
    With direct connection, 2 pre-samples possible.
  • Cosmic rate in SM08 0.5 Hz. It is much lower
    with ACORDE (studied by Minjung). Preparation of
    cosmic paddles in the magnet is proposed.
  • Not allowed to operate during daytime. We run
    overnight.
  • T0/V0 will be installed on Apr. 1. and will have
    services in end of Apr..

9
Commissioning with Pre-Trigger System
  • FEB for C side in production (90 produced).
    Tests just started (Massimiliano, Robert).
  • 5x FEB C Installation planned 10, Apr..
  • Pre-amplifiers for T0/V0 arrived (have wrong
    components).
  • CB-TOF hardware ready. Being debugged (Rainer).
  • CB-TOF will be used partially (DCS board TTCex)
    in Apr.. commissioning.

10
Needs Many More Preparation for Long Run
  • Chairs and tables
  • Quick plug play cosmic system
  • Easy use hacking PCs
  • Tools
  • Air sprays (inside Magnet is really dirty)
  • SMEC Covers
  • Housing
  • Cars

After taking 1st event Wednesday 28, Mar. 500 am
David, Georgios, Kai, Minjung, Ken
11
Conclusion The Commissioning Setup in April
Sc.HV
Gas
NIM
TRD Super-module Sec. 08
HV (GreekBox)
Cooling
LV
data with DCS r.o.
Config control
ORI r.o.
pretrig
bypass
DCS net
GTU
CB-TOF with TTCex
FSM based control InterComLayer Command
Coder wingDB feeserver
alitrdwn005 as data storage
DAQ
HD Cluster
CTP
ACORDE