Title: SIMULATION SUPPORT PLAN


1
SIMULATION SUPPORT PLAN MODELLING SIMULATION
REPOSITORY
Bob Elliott Pierre Gauvin SECO
JSMARTS VISION WORKSHOP
2
(No Transcript)
3
SimulationSupportPlan
4
Whats a Simulation Support Plan?
  • Planning document
  • Updated throughout life of project
  • How and why MS will be used in project
  • What are the requirements for MS resources?
  • How will the simulations be supported?
  • How will VVA done?

5
Principles
  • Evolutionary document
  • Becomes more detailed as the project matures
  • Does not duplicate information found elsewhere
  • Document must be value added

6
SSP Call up Deliverables
  • Deliverables
  • SSP Guideline and Template
  • SSP Guideline and Template Use Case ADDNS
  • SSP for ADDNS

7
13 SSP Template
  • Simulation Support Plan
  • Introduction
  • References
  • Project Overview
  • MS Strategy
  • MS Application
  • MS Studies
  • MS Management
  • MS Resources and Facilities
  • MS Acquisition
  • MS Technology Support
  • Funding Considerations
  • MS VVA
  • Appendices

8
(No Transcript)
9
Test case - ADDNS
  • Advanced Deployable Day/Night Simulation
  • The objective of this project is aid operational
    readiness by advancing the visual simulation
    capabilities of training simulators so that they
    can be better used for mission rehearsal.

10
1 Annex C and 13 Annex A - ADDNS
Visualization of the Advanced Deployable
Day/Night Simulation Facility
11
13 SSP Findings
  • Value to the planning process for use of
    modelling and simulation
  • Applicable to all phases of project
  • Updated with project plan
  • avoid repetition of material in other plans
  • SECO extended call-up to proceed with
    coordination with DFPPC and ADM (Mat)

12
Advocacy
  • SSP was briefed to
  • DMASP
  • DRDC
  • DFPPC

13
Results
  • Consensus emerging there is a need for some form
    of SSP as part of project documentation.
  • Stand alone document or part of existing
    document?
  • Work ongoing to adapt the template to the TDP
    Project Manager guidebook Pilot

14
MSRR
15
Where does it fit?
ENTERPRISE
ENTERPRISE MS
MSRR
16
Progressive Capability
repository
1
sim space
repository
repository
sim space
sim space
3
2
17
The Value Added
  • Awareness
  • Evaluation
  • Decision on Use
  • Determine changes and support
  • Document Changes
  • Feedback / Deposit

18
Basics
  • Consistent, compatible, connected
  • Phased Approach
  • 80 / 20 Expectation
  • Visibility
  • Ease of Use
  • Library Concept
  • User Input / Contractor Support

19
Basics (2)
  • Distributed (organizational or geographical)
  • Security / Access
  • Content Quality
  • Meta Data
  • Configuration Control
  • Use Current Activities to Evaluate
  • Use project structure to execute

20
MSRRFUNCTIONAL REPRESENTATION
Resources
Tech framework
Meta data
Models / simulations
Applications
Information
Support data bases
Common tools
Time change
1
Separate Entities
2
Consolidated catalogue Separate sources
3
Unconnected Nodes
PHASE 1
Distributed Connected nodes
4
PHASE 2
Fully integrated simulation space
5
PHASE 3
Levels content detail connection
A
B
C
E
D
Query Find Locate
Manage ment
Input Populate
Retrieve
Access
MSRR Basic Functions
21
PHASE 1OBJECTIVE
  • Implement to level 3
  • Level 1 Activity (Present Situation)
  • Produce overall PIP
  • Level 2 Activity (Catalogue, DND users models)
  • Develop Search Strategy of DND Developers, Users,
    Models.
  • Establish basic meta data for catalogue
    catalogue locations
  • Establish Catalogue sites, collect Info, populate
    catalogue, implement process for continued
    updates
  • Level 3 Activity
  • Develop Meta Data for full up content, Each Org
    develops node at their rate, develop management
    and access processes
  • Implementation spec for Phase 2
  • Produce requirements definition
  • Develop the interconnection spec and additional
    management processes for access, security etc.
  • Produce implementation plan
  • Definition for Phase 3
  • Produce requirements definition
  • Investigate and propose architecture, meta data,
    management processes for fully integrated on line
    simulation space

22
PHASE 1
  • Develop Implementation Plan (SECO)
  • Who are the stakeholders
  • ( Organisational search by SEWG members assisted
    by SECO contractor )
  • Structure resource search
  • What do we want (level 2 meta data)
  • (very basic, take what is available, SECO
    establish )
  • What do we want (level 3 meta data)
  • (developed by contract or by SEWG members MSECO,
    FFSE, )
  • How will we get it
  • (contractor assisted search )

23
PHASE 1 Level 2
  • Compile catalogue (level 2 Meta Data)
  • Sustain updates
  • Develop node performance spec
  • Define Node Implementation Metrics
  • Finalize Level 3 Implementation Spec

24
Phase 1Level 3
  • Each Node Implementation
  • Provide Node map
  • Provide current content status
  • Continuous Process Managed by Node Owner

25
Phase 2
  • Level 4 Activity
  • Implement required interconnection links
  • Implement required security and access controls
  • Provide continued management functions
  • Introduce additional nodes as required
  • Level 5 Activity
  • Finalize development of performance spec
  • Produce draft management processes
  • Produce Implementation Plan

26
Phase 3
  • Level 5 Activity
  • Implement integrated simulation space
  • Implement Management processes
  • Implement sustaining resources

27
(No Transcript)
28
Issues
  • What are the essential requirements to support
    our MS goals
  • Is project centrally driven or user driven
  • Who supplies resources
  • How do we integrate schedules