Title: Shared Processing Program Operations
1Shared Processing Program Operations Working
Group (SPOWG) November 29, 2001 Mac McCreary
2SPOWG
- SHARED PROCESSING OPERATIONS WORKING GROUP
- November 27, 2001 at WWB, Camp Springs, MD
- Action Item Review
- SPP Documentation Status and Network Management
Update -
- EOS Update and Operational use of EOS Data
- GMS-5 and MSG
- xDR Definition for NPOESS
3SPOWG
- Issues
-
- AFWA Shared Processing Product Tranistion Status
- Sample Files for SNOW and Cloud Analysis from
AFWA - SPP Partners Participation in SSMIS Cal/Val
- Navy Access to NPP VIS, IR Radiances and Sounder
Data - Recommendation to form Altimetry Research Panel
- NPOESS Centrals TIM Results
4SPOWG
- Action Items Account
- 17 Existing Actions
- 11 Actions Closed
- 6 Actions Remained Open
- 10 New Actions
5SPOWG
a. The residual action items are summarized as
follows 1) SPOWG 99-20 Open Direct
Soundings ARP to determine resources needed for
NESDIS to provide accurate temperature and
moisture retrievals from sounder channels of
SSMIS. Action NESDIS Due Date TBD Status
Open. NESDIS participating in SSMIS
Cal/Val. a. FNMOC is interested in assimilating
profiles before attempting direct radiance
assimilation. b. NCEP would like to evaluate
radiances, resources permitting. 2) SPOWG
00-12 Open Provide feedback on SPP Program
Management Plan including Configuration
Management plan. Action NESDIS Due date 29
Jun 01. Status NESDIS host teleconference for
joint review.
6SPOWG
- 3) SPOWG 00-10 Open. NESDIS needs a formal
request of MODIS data - from users.
- Action NAVOCEANO Due TBD
- 4) SPOWG 01-07 Review Soundings ARP requirement
POPS Representation. - Action NESDIS Due Date TBD
- 5) SPOWG 01-08 Implement operational capability
for processing SSM/T-1, - SSM/T-2 Raw Satellite Data Records (RSDR) files.
- Action NESDIS Due Date Mid-Feb
- Status T-2 product is being testing / T-2 and
T-1 is scheduled - to be completed in mid-February
- 6) SPOWG 01-09 Implement capability to process
WWMCA Cloud Analysis - and SNOW data in GRIB format.
- Action NESDIS, FNMOC Due Date 30 April 02
7SPOWG
New Actions 1) SPOWG 01-10 Open. NEDIS will
supply AFWA with requirements for SSMIS
RSDR. Action NESDIS Due 15 Dec. 01 2)
SPOWG 01-11 Open. AFWA will supply NESDIS with
GPS code Version 3 and the corresponding
documentation. Action AFWA Due Date Dec
01 3) SPOWG 01-12 Open. CNMOC will contact
DISA about scheduling Routing outages Action
CNMOC Due Date TBD 4) SPOWG 01-13 Open.
SPP will re-instate a secretary for taking
minutes and action items. Action All Due
Date Mar 02
8SPOWG
New Actions (cont) 5) SPOWG 01-14 Open. All
SPP sites will send update on site infrastructure
and corresponding documentation to be
incorporated in the POM. Action All Due 30
Jan 02 6) SPOWG 01-15 Open. AFWA will
determine the earliest possible date for routine
transfer of non-operational Cloud Analysis
product. Action AFWA Due Date Jan 02 7)
SPOWG 01-16 Open. FNMOC will determine when
sample date can be available to NESDIS. Action
FNMOC Due Date Feb 02 8) SPOWG 01-17 Open.
SPP will re-instate a secretary for taking
minutes and action items. Action All Due
Date Mar 02
9SPOWG
New Actions (cont) 9) SPOWG 01-18 Open. For
the NAVY Access to NPP VIS, IR Radiances
and Sounder data a. FNMOC and CNMOC will
determine product requirements. b. AFWA and
NESDIS will determine how meet those
requirements. Action All Due TBD 10) SPOWG
01-19 Open. AFWA will determine the earliest
possible date for routine transfer of
non-operational Cloud Analysis product. Action
AFWA Due Date Jan 02