Require 4 rack spaces on the cassegrain cage. Two 30U for the DM electronics ... Dean working on DM cabling and has made some significant progress ... – PowerPoint PPT presentation

Number of Views:994
Avg rating:3.0/5.0
Slides: 19
Provided by: mitche7
Category:
Tags: p3k | cage | dean | meeting | team

less

Transcript and Presenter's Notes

Title: P3K Team Meeting


1
P3K Team Meeting 9
  • Stephen Guiwits
  • Team Meeting 9 and 023 Robinson
  • October 22, 2008

2
P3K Electronics Documents
  • Electronics Requirements Document
  • Interfaces.xls
  • Requires more detail
  • Electronics Project Schedule
  • Design Document
  • In the works

3
RTC Hardware
  • Software Installation and Test
  • Suse Kickstart DVD Install
  • Complete
  • Custom RPMS completed and tested
  • Custom scripts to install
  • Nvidia development libs
  • Quadrics drivers
  • EDT drivers
  • 2 disks
  • Disk 1 Base patches
  • Disk 2 custom scripts
  • Quadrics Installation
  • Quadrics switch installed and configured
  • Linux driver installed
  • Initial communication tests completed

4
RTC Hardware
  • Software Installation and Test
  • Development Rack
  • Will be installed next week and set up in JPL AO
    Lab
  • Production Rack
  • Will have the initial Suse kickstart release
    installed next week
  • Will be shipped to Caltech within the following
    weeks

4
5
RTC Rack Layout
6
DM Driver
  • Hardware
  • Xinetics Gen III Mirror Electronics
  • Software
  • Initial test software written
  • Reads in command line arguments or files
  • Communicates over the RS 232 interface
  • Needs to be cleaned up and put into a linkable
    library
  • Results
  • Able to set the driver state to active and send
    commands successfully

7
DM Driver
  • Results
  • Several commands are still not working
  • B set the bias voltage
  • C set the frame size (currently have to send
    full frames)
  • D read the driver type
  • Rest of the command set still needs to be tested
  • To complete this week
  • Working with Xinetics
  • Need to actively work with Xinetics to make sure
    we have all the commands working required for P3K
    operation

8
P3K Cassegrain Cage Racks
  • Space Required
  • Require 4 rack spaces on the cassegrain cage
  • Two 30U for the DM electronics
  • Two 24 U for the general AO electronics
  • These spaces do not include the instrument cage

9
P3K Cassegrain Cage Racks
  • Locations
  • DM Drivers in 2 and 3
  • General racks in 4 and 5
  • Instrument rack in 6
  • This has not been confirmed by Palomar but should
    be possible Ive been told

10
DM Rack Designs
  • Rack One

11
DM Rack Designs
  • Rack Two

12
P3K General Rack
  • Rack One

13
P3K General Rack
  • Rack Two

14
DM Electronic Cooling
  • Early stages of design
  • Cooling lines
  • Facility class or AO only
  • Must work in AO lab
  • Alcohol and Water vs. Glycol
  • All racks vs. just DM
  • Flow rate / Vibration / Noise

15
P3K Power
  • P3K Power Requirements Given to Palomar Staff
  • Major power and infrastructure upgrades needed
    for 200
  • No shared UPS for RTC Racks
  • UPS for DM electronics?

16
P3K Cabling
  • Cabling design
  • Overall design and documentation to begin soon
  • DM cabling already in the works
  • Dean working on DM cabling and has made some
    significant progress
  • Cabling from FPGA to magic box
  • Magic box to DM drivers
  • Currently working on a quick connect from the DM
    drivers to the mirror to speed up instrument
    installation and eliminate errors

17
P3K Cabling
18
Procurements
  • Cassegrain Cage Computer
  • Specd and quoted
  • SciMeasure Optical Splitter
  • Gave Charlie B. until December 1, 2008 to produce
    a quote
  • FPGA Cards
  • Specd and quoted
  • DVI KVM Switch
  • For Production RTC Racks
  • Quoted and Ordered
Write a Comment