Description:

Reference Framework to evaluate pro / cons of different technology options ... Functional requirements definition and prioritization. TSG Chair. Face-to-face ... – PowerPoint PPT presentation

Number of Views:59
Avg rating:3.0/5.0
Slides: 16
Provided by: Pagn
Category:

less

Transcript and Presenter's Notes

Title: MESA next steps


1
MESA next steps
  • MESA 13

2
MESA TSG Current WI DTR/MESA-SYS0070015v311
  • Current WI Title Analysis of System of Systems
    networking technologies
  • Scope and Field of Application Analysis of
    system of systems networking technologies and
    air interface technologies
  • Rapporteur 4DK Technologies (Mar Tarres
    mar_at_4dk.com)

Draft for discussion purposes only To be
approved by TSG, SSG members
3
Objectives
  • Understand the level of conformity of published
    COTS technologies to Public Safety requirements
    for broadband data
  • Identify how existing and roadmapped capabilities
    deliver on Public Safety requirements
  • Identify additional technology capabilities and
    technology enhancements that need to be developed
    and standardized to deliver on the Public Safety
    requirements
  • Create a framework of reference for Public Safety
    to evaluate how the different technologies meet
    on the different elements and requirements of the
    System of System architecture

4
Deliverables
  • Develop a high level architecture and functional
    requirements based on Project MESA SoR
  • Conduct a technology capabilities to functional
    requirement mapping
  • Identifying timing of capabilities (existing vs
    roadmapped)
  • Identifying capability gaps and enhancements that
    will need to be developed
  • Set up a process to update the technology
    capabilities to requirements mapping to include
    new technologies as they become available

5
Rules of Engagement for this Phase of Work
  • The work item will build upon the proposals
    received on March 2006
  • The work item should use work already done in
    TIA/TR8.8 and APIC/BBTG and consider 802.11ma,
    802.16e, 1x/EV-DO and WCDMA
  • The work can also include new technologies
    proposed by the TSG contributors
  • Proposers of technology must join at the point of
    the process
  • The work shall include a peer review
  • Avoid duplicating work developed on TIA and ETSI
  • Contributors and users are expected to be
    involved ALL ALONG the development of the
    activities
  • Peer review will be conducted off-line and
    conference calls face to face meetings are
    expected to approve the work and plan for next
    steps

6
Approach
Project MESA SoR
Project MESA Functional Requirements
Technology Capabilities to Functional
Requirements Mapping
Reference Framework to evaluate pro / cons of
different technology options
New Functional and Technology requirements for
Technology Standardization Bodies
TIA
ETSI
7
6 Month Workplan Overview
1.A Refine High-level Architecture
1.B Review and Feedback from SSG, TSG
2.A Create analysis matrix template
2.B Review and Feedback from SSG, TSG
3.A Map user requirements to functional
requirements
3.B Review and Feedback from SSG, TSG
4.A Populate analysis matrix
5.A Technology gap analysis and roadmapping
6.A Evaluate next steps
Monthly status updates
  • Gap Analysis roadmapping complete for first
    set of functional requirements
  • Consensus on
  • HL Architecture
  • Matrix
  • Requirement mapping

Deliverables
  • Analysis matrix complete for first set of
    functional requirements
  • High-level architecture draft
  • Analysis matrix template draft
  • User req. to Funct. Req. mapping
  • MESA meeting to review technology proposals and
    roadmapping define next steps

Plenary sessions
  • TSG Meeting to reach consensus on 3 initial
    deliverables

8
Task description
Analysis of System of System Networking
Technologies
9
Task description
Analysis of System of System Networking
Technologies
10
Task description
Analysis of System of System Networking
Technologies
11
Task description
Analysis of System of System Networking
Technologies
12
Task description
Program Management
13
Next Steps
  • Approve and publish plan
  • Collect contacts of all TSG members actively
    participating in WI
  • Establish WI logistics
  • Schedule meetings
  • Start the work!!

14
Appendix
15
Tasks
  • Create project plan
  • Refine high level architecture given in the
    overview document December 1st 06 (Mark Klerer)
  • Create a matrix template - December 1st 06 (Mar
    Tarres)
  • Mapping user requirements to functional
    (operational, performance, application,
    management) requirements - January 15th 07
    (Mar Tarres)
  • Consensus on the first iteration of the matrix -
    January 30th 07 (TSG SYS)
  • Consensus on the high level architecture -
    January 30th 07 (TSG SYS)
  • Schedule the face to face meeting (tentative week
    of January 29th 07) (TSG chair)
  • Populate the matrix from proposals received
    March 20th 07
  • Common requirements/optional
  • Gap analysis - (TSG SYS)
  • Consider new proposals final date March 20th 07
  • Evaluate next steps
Write a Comment