Title: MESA next steps
1MESA next steps
2MESA TSG Current WI DTR/MESA-SYS0070015v311
- Current WI Title Analysis of System of Systems
networking technologies - Scope and Field of Application Analysis of
system of systems networking technologies and
air interface technologies - Rapporteur 4DK Technologies (Mar Tarres
mar_at_4dk.com)
Draft for discussion purposes only To be
approved by TSG, SSG members
3Objectives
- Understand the level of conformity of published
COTS technologies to Public Safety requirements
for broadband data - Identify how existing and roadmapped capabilities
deliver on Public Safety requirements - Identify additional technology capabilities and
technology enhancements that need to be developed
and standardized to deliver on the Public Safety
requirements - Create a framework of reference for Public Safety
to evaluate how the different technologies meet
on the different elements and requirements of the
System of System architecture
4Deliverables
- Develop a high level architecture and functional
requirements based on Project MESA SoR - Conduct a technology capabilities to functional
requirement mapping - Identifying timing of capabilities (existing vs
roadmapped) - Identifying capability gaps and enhancements that
will need to be developed - Set up a process to update the technology
capabilities to requirements mapping to include
new technologies as they become available
5Rules of Engagement for this Phase of Work
- The work item will build upon the proposals
received on March 2006 - The work item should use work already done in
TIA/TR8.8 and APIC/BBTG and consider 802.11ma,
802.16e, 1x/EV-DO and WCDMA - The work can also include new technologies
proposed by the TSG contributors - Proposers of technology must join at the point of
the process - The work shall include a peer review
- Avoid duplicating work developed on TIA and ETSI
- Contributors and users are expected to be
involved ALL ALONG the development of the
activities - Peer review will be conducted off-line and
conference calls face to face meetings are
expected to approve the work and plan for next
steps
6Approach
Project MESA SoR
Project MESA Functional Requirements
Technology Capabilities to Functional
Requirements Mapping
Reference Framework to evaluate pro / cons of
different technology options
New Functional and Technology requirements for
Technology Standardization Bodies
TIA
ETSI
76 Month Workplan Overview
1.A Refine High-level Architecture
1.B Review and Feedback from SSG, TSG
2.A Create analysis matrix template
2.B Review and Feedback from SSG, TSG
3.A Map user requirements to functional
requirements
3.B Review and Feedback from SSG, TSG
4.A Populate analysis matrix
5.A Technology gap analysis and roadmapping
6.A Evaluate next steps
Monthly status updates
- Gap Analysis roadmapping complete for first
set of functional requirements
- Consensus on
- HL Architecture
- Matrix
- Requirement mapping
Deliverables
- Analysis matrix complete for first set of
functional requirements
- High-level architecture draft
- Analysis matrix template draft
- User req. to Funct. Req. mapping
- MESA meeting to review technology proposals and
roadmapping define next steps
Plenary sessions
- TSG Meeting to reach consensus on 3 initial
deliverables
8Task description
Analysis of System of System Networking
Technologies
9Task description
Analysis of System of System Networking
Technologies
10Task description
Analysis of System of System Networking
Technologies
11Task description
Analysis of System of System Networking
Technologies
12Task description
Program Management
13Next Steps
- Approve and publish plan
- Collect contacts of all TSG members actively
participating in WI - Establish WI logistics
- Schedule meetings
- Start the work!!
14Appendix
15Tasks
- Create project plan
- Refine high level architecture given in the
overview document December 1st 06 (Mark Klerer) - Create a matrix template - December 1st 06 (Mar
Tarres) - Mapping user requirements to functional
(operational, performance, application,
management) requirements - January 15th 07
(Mar Tarres) - Consensus on the first iteration of the matrix -
January 30th 07 (TSG SYS) - Consensus on the high level architecture -
January 30th 07 (TSG SYS) - Schedule the face to face meeting (tentative week
of January 29th 07) (TSG chair) - Populate the matrix from proposals received
March 20th 07 - Common requirements/optional
- Gap analysis - (TSG SYS)
- Consider new proposals final date March 20th 07
- Evaluate next steps