Review of the Pacific NW Resource Adequacy Assessment Methodology - PowerPoint PPT Presentation

1 / 5
About This Presentation
Title:

Review of the Pacific NW Resource Adequacy Assessment Methodology

Description:

PSRI recommended metric for the Northwest. Annual or ... Monthly hydro dispatch (using hydro blocks) Using 'Energy vs. Capacity' curves for hourly dispatch ... – PowerPoint PPT presentation

Number of Views:38
Avg rating:3.0/5.0
Slides: 6
Provided by: johnf77
Category:

less

Transcript and Presenter's Notes

Title: Review of the Pacific NW Resource Adequacy Assessment Methodology


1
Review of the Pacific NW Resource Adequacy
Assessment Methodology
  • Proposed Contract with
  • Power Systems Research, Incorporated
  • Resource Adequacy Technical Committee
  • October 16, 2009

2
Topics for the PSRI Contract
  • Probabilistic Resource Adequacy Metrics
  • Adequacy Assessment and Long-term Resource
    Planning
  • Pacific NW Hydro System Simulation

3
Probabilistic Resource Adequacy Metrics
  • Inventory of probabilistic metrics
  • Appropriate metrics for the Northwest
  • Value of including magnitude
  • PSRI recommended metric for the Northwest
  • Annual or seasonal assessments?
  • Review of BPAs approach
  • Aid in assessing appropriate sustained-peak
    period duration

4
Adequacy and Resource Planning
  • How other utilities use adequacy standards to
    develop long-term resource plans
  • Use of deterministic metrics in planning models
  • Recommendation on the best way to incorporate
    adequacy standards into long-term planning

5
Review of Hydro Simulation
  • Monthly hydro dispatch (using hydro blocks)
  • Using Energy vs. Capacity curves for hourly
    dispatch
  • Using the Trapezoidal Model to create Energy vs.
    Capacity curves
  • Recommendation for other methods
Write a Comment
User Comments (0)
About PowerShow.com