Title: Updates on the Chinese Energy Sector and on the China LEAP Modeling Effort


1
Updates on the Chinese Energy Sector and on the
China LEAP Modeling Effort
  • Yanjia Wang, Alun Gu, Aling Zhang
  • EETC, Tsinghua University, China
  • 4th Asia Energy Security Workshop
  • 6-7 November 2006, Beijing, China

2
Part A Update on the Chinese Energy Sector
  • Yanjia Wang

3
Where Does Chinas Energy Go?
  • Basic facts in 2005
  • Primary energy production 2.063 billion tce, 10
    higher than previous year
  • Total energy consumption 2.225 billion tce,
    9.47 higher than 2004
  • Coal consumption 2.14 billion ton, 11.4 higher
  • Power installed capacity 517.18GW, 16.9 higher
  • Power generated 2,497.5TWh, 13.82 higher
  • Crude oil consumption 3300 million ton, 13.8
    higher
  • Crud oil import (net) 119 million ton, 1.4
    higher
  • Petroleum import (net) 143.6 million ton, 5.2
    less
  • Elasticity of energy production consumption
    0.96
  • Elasticity of electricity production 1.24
  • Elasticity of electricity consumption 1.22

4
Where Does Chinas Energy Go?
  • Macro control effected, but still a long way to
    go

5
Coal Plays Dominate Role Continuously
6
(No Transcript)
7
Power Industry
8
1972-2004 New Constructed Power Plant (104 kW)
9
ENERGY EFFICIENCY IN CHINA
???
10
Renewable Energy Law Effected on Jan. 1st 2006
  • NDRC issued a document for pricing renewable
    energy for power generation on Jan. 4th 2006.
  • Biomass for power tariff coal-fired tariff
    (including deSOx) 0.25yuan/kWh for 15 years
  • Wind power tendering price and lowest bidders
    price
  • PV, geothermal, wave.. project based approval
    price

11
20 Energy Efficiency Target
  • National 11th Five-Year Plan(2006-2010) Energy
    intensity of GDP will decrease about 20 within 5
    years.
  • Give a quantified target on energy efficiency for
    the first time in five-year plans
  • Divide total target to provincial, large
    industrial group, city, large energy consumers
    target to implement.

12
Tremendous Efforts Must be Made on Energy
Efficiency Improvement
13
Three Gorge Hydropower Fully Operate for the
First Time
  • 14700MW generators fully operate on Oct. 18 2006
  • 14700MW generators commissioned on Sept. 2005
  • The first generator commissioned on July 2003
  • 26700MW generators will commission by the end of
    2008
  • Sluice will reach designed level-- 156 meter
  • Water level before 156 meter (bottom) (taken on
    Aug. 8th 2006)
  • Water level reached 154.24 meter (top) (taken on
    Oct. 22, 2006)

14
40GW Nuclear Power by 2020
Weihai, 195MW Domestic Gas cooling
reactor, Another two plants in Rongchen, Hai Yang
are under planning
Hongheyan 2GW, 2011 finished
15
Operated Nuclear Power Plant List
16
Qinshan I
17
Qinshan II
18
Qinshan III
China Vice Primary Minister and Canadian Primary
Minister attend the creamery of Qinshan III
commissioned
2700 MW US2.88 billion
19
Daya Bay
20
Location of Nuclear Power Plants in Asia
21
Part BChina LEAP Modeling Effort
22
Basic assumptions
  • Base year 2000 (2005)
  • Target year 2030
  • Dataset AES2005
  • LEAP2006 (slow calculation)
  • Three scenarios BAU, NAP,RAP
  • Check inputs and outputs of base year (finish)
  • GDP adjustment in 2004

23
The construction of new socialist countryside in
China
  • Narrow the widening gap between rural and urban Ch
    ina
  • Improve agricultural production, living standards
    and public administration in the rural areas
  • Rural facilities will be improved
  • Rural consumption structure will be changed

24
Wind power industry update
  • Wind power installed capacity in 2005 1.26GW,
    increment 0.498 GW (39)
  • Localization of 70
  • Initial investment 7500-8500 yuan/kW
  • In 2020, wind power installed capacity 30GW
    (finish)

25
CDM projects in China
  • CDM projects will decrease the operation cost in
    power industry in China (doing)
  • Emission factor in China about 0.8
    kgCO2e/kWh(coal-fired)
  • CERs (Certified emission reductions) US
    10/tCO2e
  • Emission reduction benefits 0.064yuan/kWh
  • Average electricity tariff 0.309 yuan/kWh

26
Nuclear power scenarios in China
27
Nuclear
28
Adjustment
29
Ongoing
  • Transport sector (substitute fuel development)
  • Renewable energy development in China renewable
    energy power plants
  • ......

30
Thank you!
  • gal_at_tsinghua.edu.cn