Title: HERAB
1HERA-B
Bernhard Schmidt DESY - HH
PRC open session, October 30, 2002
2Status of run 2000 analysis
- nearing completion
?
?
submitted
in press
Some additional theses ongoing
There are no more data left to analyze
3Detector status
?
?
4ITR
- HV training completed (425 hours operation),
stability ok - HV problems 4 (160) chambers in-operational (1
cathode, 3 GEM) acceptable level - Hit efficiency (90 - 95) S/N (16-24) looks
ok - Alignment first iterationdone
chambers of MS01 layer
5ITR-2
25 of channels show no signal !
- New problem observed recently
normal chamber
abnormal chamber
REASON UNCLEAR
Run 19990
ITR-tracks at exit of PC section
Due to high redundancy in ITR Coverage and
efficiency of trackingstill sufficient
Worrisome but not fatal
6OTR
- Fully operational in trigger and for tracking
- HV problems level out mean time between
failures at 58 h (since May 2002) - Noise level improved considerably
threshold, noise at 1
Channel statistics
(-)
()
Cell efficiency gt95 ,fine for triggering and
tracking
7ECAL
Calibration precision
- Fully operational and calibrated with ?? (1)
- Dramatically improved performance compared to
2000( noise, stability, spatial resolution)
1
8ECAL-2
J/??ee signals
-1? lt E/p lt 3?
- improved PID with ECAL
- no BR tag required to see J/?
9Muon System
- Operational, some non-working chambers in MU1,
not critical - No new HV problems since May 2002
- Efficiency of pad read out on average 883
(include. dead channels), no major holes
Not perfect, but sufficient for triggering
Muon tracks at MU1 position
J/y-gtµµ online
10TRIGGER and DAQ status FLT
- FLT routinely used for J/y triggering now
- High level of understanding but still some
mysteries - single track efficiencies usable (25 µ-ons, 60
for electrons ) - FLT - pair trigger works
11trigger schemes
- No FLT-pairs, but FLT(1 track 1 pre-trigger)
SLT(2tracks)
star mode
- advantage
- much less affected by FLT efficiency (OR inst.
AND) - covers ITR for second track (acceptance at xFgt
0)
achieved J/? rates
400 J/? per hour and MHz interaction rate (eµ)
? Dead time, achievable interaction rate ?
gt 800 J/? per hour
Typical 30 DT at 3 MHz Seen 0 DT at 3 MHz
-gt ?
work ongoing
beam DAQ conditions
We hope to get 1000 J/? per hour these days.
12Status of Commissioning
20
70
Many thanks to HERA for giving us beam in hard
times
13Readiness for data taking
Carbon target 7106 events
With RICH PID.
Statistics KS 90200 ? 20000 ? 9700
Counts
Mass (GeV/c2)
14Readiness
- Spectrometer considerably improved since 2002
- Performance and reliability of sub-detectors
- Calibration and alignment
- Reconstruction algorithms
- Data Quality Monitoring
- ..
Track finding efficiency (real data) 2000 86.9
2.3 2002 96.5 2.0
15Readiness..
- J/? trigger (signals, rates)
J/?
mm
?
Collection rate
1000 J/psi per real hour (both channels) almost
at hand
ee
16Physics goals Run plans
The initial goal for 2002
- Measurement of the b cross section
- Publishable charmonium physics
- Investigation of physics program beyond 2002
2106 J/y?????months running
We Are Ready To Take These Data
- complicated situation with HERA planned new
shutdown-
we need SERIOUS physics data before shutdown
OR collaboration will collapse
17Physics goal run plan - present planning
- Reduced time scale 52 days stable running
- with existing performance
- lower limit for meaningful charmonium program and
B-cross section measurement - Mandatory prerequisite stable and reliable HERA
operation (moderate currents, no aggressive
machine experiments..) - Run schedule 75 charmonium prod. 25
min.bias, calibration, tests..
1/6 of planned data sample
18Perspectives and Outlook
- HERA-B in better shape than ever
- Ready to take serious physics data NOW
We need these data