HERAB - PowerPoint PPT Presentation

About This Presentation
Title:

HERAB

Description:

HERAB – PowerPoint PPT presentation

Number of Views:61
Avg rating:3.0/5.0
Slides: 19
Provided by: bernhard55
Category:
Tags: herab | hard | ons

less

Transcript and Presenter's Notes

Title: HERAB


1
HERA-B
Bernhard Schmidt DESY - HH
PRC open session, October 30, 2002
2
Status of run 2000 analysis
- nearing completion
?
?
submitted
in press
Some additional theses ongoing
There are no more data left to analyze
3
Detector status
?
?
4
ITR
  • HV training completed (425 hours operation),
    stability ok
  • HV problems 4 (160) chambers in-operational (1
    cathode, 3 GEM) acceptable level
  • Hit efficiency (90 - 95) S/N (16-24) looks
    ok
  • Alignment first iterationdone

chambers of MS01 layer
5
ITR-2
25 of channels show no signal !
  • New problem observed recently

normal chamber
abnormal chamber
REASON UNCLEAR
Run 19990
ITR-tracks at exit of PC section
Due to high redundancy in ITR Coverage and
efficiency of trackingstill sufficient
Worrisome but not fatal
6
OTR
  • Fully operational in trigger and for tracking
  • HV problems level out mean time between
    failures at 58 h (since May 2002)
  • Noise level improved considerably

threshold, noise at 1
Channel statistics
(-)
()
Cell efficiency gt95 ,fine for triggering and
tracking
7
ECAL
Calibration precision
  • Fully operational and calibrated with ?? (1)
  • Dramatically improved performance compared to
    2000( noise, stability, spatial resolution)

1
8
ECAL-2
J/??ee signals
-1? lt E/p lt 3?
  • improved PID with ECAL
  • no BR tag required to see J/?

9
Muon System
  • Operational, some non-working chambers in MU1,
    not critical
  • No new HV problems since May 2002
  • Efficiency of pad read out on average 883
    (include. dead channels), no major holes

Not perfect, but sufficient for triggering
Muon tracks at MU1 position
J/y-gtµµ online
10
TRIGGER and DAQ status FLT
  • FLT routinely used for J/y triggering now
  • High level of understanding but still some
    mysteries
  • single track efficiencies usable (25 µ-ons, 60
    for electrons )
  • FLT - pair trigger works

11
trigger schemes
  • No FLT-pairs, but FLT(1 track 1 pre-trigger)
    SLT(2tracks)

star mode
  • advantage
  • much less affected by FLT efficiency (OR inst.
    AND)
  • covers ITR for second track (acceptance at xFgt
    0)

achieved J/? rates
400 J/? per hour and MHz interaction rate (eµ)
? Dead time, achievable interaction rate ?
gt 800 J/? per hour
Typical 30 DT at 3 MHz Seen 0 DT at 3 MHz
-gt ?
work ongoing
beam DAQ conditions
We hope to get 1000 J/? per hour these days.
12
Status of Commissioning
20
  • running in 2002 so far

70
Many thanks to HERA for giving us beam in hard
times
13
Readiness for data taking
  • Spectrometer performance

Carbon target 7106 events
With RICH PID.
Statistics KS 90200 ? 20000 ? 9700
Counts
Mass (GeV/c2)
14
Readiness
  • Spectrometer considerably improved since 2002
  • Performance and reliability of sub-detectors
  • Calibration and alignment
  • Reconstruction algorithms
  • Data Quality Monitoring
  • ..

Track finding efficiency (real data) 2000 86.9
2.3 2002 96.5 2.0
15
Readiness..
  • J/? trigger (signals, rates)

J/?
mm
?
Collection rate
1000 J/psi per real hour (both channels) almost
at hand
ee
16
Physics goals Run plans
The initial goal for 2002
  • Measurement of the b cross section
  • Publishable charmonium physics
  • Investigation of physics program beyond 2002

2106 J/y?????months running
We Are Ready To Take These Data
- complicated situation with HERA planned new
shutdown-
we need SERIOUS physics data before shutdown
OR collaboration will collapse
17
Physics goal run plan - present planning
  • Reduced time scale 52 days stable running
  • with existing performance
  • lower limit for meaningful charmonium program and
    B-cross section measurement
  • Mandatory prerequisite stable and reliable HERA
    operation (moderate currents, no aggressive
    machine experiments..)
  • Run schedule 75 charmonium prod. 25
    min.bias, calibration, tests..

1/6 of planned data sample
18
Perspectives and Outlook
  • HERA-B in better shape than ever
  • Ready to take serious physics data NOW

We need these data
Write a Comment
User Comments (0)
About PowerShow.com