Title: Facilitator:Mark Leslein
1- WELCOME
- Facilitator Mark Leslein
- Risk Management Advisor
- Acquisition Center of Excellence
- Hosts Debbie Jackson, FAST Program Director
- K.C. Jones, SB Mods Requirements Lead
- Capt Brian Mayer, SB Mods Program Manager
- Stephanie Gisseman, SB Mods PCO
- Al Thompson, SB Mods Lead Engineer
2- DAY 1 SESSION
- Start (830AM)
- Welcome/Opening Remarks Debbie Jackson
- Administrative Comments K.C. Jones
- New Requirements Traceability Matrix Al Thompson
- Introduction K.C. Jones
- Overview of Workshop Events Mark Leslein
- Review of Risks Submitted Mark Leslein
- Rewrite of Risks Identified
- Voting
- Risk Mitigation Mark Leslein/Al Thompson
- DAY 2 SESSION - If Necessary
3Risk Assessment Procedures
- Risk Identification
- Scoring
- Create Scorecard
- Contractor Score (one per company)
- Analysis
- Create Master Risk Assessment
- Determine Low, Moderate, Severe Risks
- Risk Mitigation
- How to Mitigate
- Where to Mitigate
4ADMINISTRATIVE COMMENTS
- Conference Support
- Restrooms, Food Beverage
- Cell phone operation within the building is
difficult due to the metal construction of the
building. - Please set cell phones to silent mode or turn
them off while conference is in session. - Limit sidebar conversions while conference is in
session.
5Requirements Traceability Matrix
6Risk Assessment Workshop Overview Presentation
7Risk is a measure of the potential inability to
achieve overall program objectives within defined
cost, schedule, and technical constraints and has
two components (1) the probability/likelihood
of failing to achieve a particular outcome,
(2) the consequences/impacts of failing to
achieve that outcome.
RISK
8RISK STATEMENTS
- Risk Future event that could result in negative
consequences - IF cargo capacity threshold not met,
- THEN ops tempo will slow giving
- enemy more time to prepare
- Refine statement by determining the root cause(s)
9AREAS FOR CONCERN
- Coherent Program Schedule
- Dedicated Resources
- Contracting Plan
- Technical Requirements
- Management Support
- Advance Planning
- Funding Commitments
- Unscheduled Events
- Sustainment Logistics Support
- Long Lead Items
- Acquisition Strategy
10SOURCES OF RISK
- External
- Personnel
- Occupational
- Labor Actions
- Physical Damage
- Criminal
- Data
- Supplier Viability
- Regulations
- Political Actions
- Terrorism
- Climate/Environment
- Company Stability
- Priority
- Transportation
- Maintenance
- Internal
- Technical
- Maturity
- Customer (User) Uncertainty
- Changing Requirements
- Complexity/Dependency
- Design Errors, Omissions,
- Processes (tech, mfg, s/w)
- Schedule
- Unrealistic Requirements
- Capabilities Optimism
- Type (Time vs Event Based)
- Incomplete ID of Tasks
- Cost
- Uncertain Number of Products
- Competitive Environment
- Design Config. Changes
- Data
11F2AST Risk Assessment
6
8
10
81- 99
7
9
5
6
7
8
9
4
61- 80
5
Probability
5
6
7
8
3
41- 60
4
21- 40
4
5
6
7
2
3
1- 20
3
4
5
6
1
2
5
4
3
2
1
Low Moderate Severe
Consequence
12(No Transcript)
13RFI Risk Identification Statements
Risk Mitigation
14(No Transcript)
15(No Transcript)
16(No Transcript)
17(No Transcript)
18(No Transcript)
19(No Transcript)
20(No Transcript)
21(No Transcript)
22(No Transcript)
23(No Transcript)
24D/TO Level Risks
25D/TO Level Risks
26D/TO Level Risks
27D/TO Level Risks
28D/TO Level Risks
29Additional Risks
30Additional Risks
31Additional Risks
32Additional Risks
33Risk Assessment Procedures
- Completed Risk Identification
- Scoring
- Create Scorecard
- Contractor Score (one per company)
- Analysis
- Create Master Risk Assessment
- Determine Low, Moderate, Severe Risks
- Risk Mitigation
- How to Mitigate
- Where to Mitigate