ACC Biennial Transmission Assessment - PowerPoint PPT Presentation

1 / 9
About This Presentation
Title:

ACC Biennial Transmission Assessment

Description:

... of TEP's EHV stations contained two transformers and TEP operates to survive N-2 ... substation will have 3 EHV transformers study showed this also can be ... – PowerPoint PPT presentation

Number of Views:75
Avg rating:3.0/5.0
Slides: 10
Provided by: edb7
Category:

less

Transcript and Presenter's Notes

Title: ACC Biennial Transmission Assessment


1
ACC Biennial Transmission Assessment
2006 - 2015
  • Ed Beck
  • Superintendent, Planning
  • Tucson Electric Power

2
(No Transcript)
3
TEP EHV System Additions
Springerville
Westwing
Saguaro
North Loop
Tortolita
Greenlee
Winchester
TEP Service Area
Vail
South
Irvington
4
138 kV System
Westwing
Saguaro
North Loop
Tortolita
Greenlee
Winchester
5
UNS Electric (Citizens)
  • Only change from 2004 to 2006 is a plan to
    upgrade the existing 115kV line to Nogales to
    138kV and connect to TEP Vail substation

6
TEP Extreme Contingency
  • Extreme contingency considered to be loss of all
    EHV transformers at a TEP substation (Tortolita,
    Vail or South)
  • In 2008 each of TEPs EHV stations contained two
    transformers and TEP operates to survive N-2
  • In 2015 Tortolita substation will have 3 EHV
    transformers study showed this also can be
    survived with direct load tripping

7
N 1 - 1
  • TEP operates using load Shed tables
  • Fast switched reactive devices and/or direct load
    trip arming
  • Studied TEP system with all generation on-line
    and N 2 conditions, all N 2 contingencies
    solved meeting TEP .98 p.u. voltage criterion
  • TEP is working with SWTC on issues on their
    system

8
SIL and MLSC
9
Questions?