INNOTRACK - PowerPoint PPT Presentation

1 / 7
About This Presentation
Title:

INNOTRACK

Description:

on the 5th and 6th of October 2006. By Bj rn Paulsson UIC. INNOTRACK - project organisation ... Remember that it is when the result is implemented the benefit ... – PowerPoint PPT presentation

Number of Views:73
Avg rating:3.0/5.0
Slides: 8
Provided by: caro262
Category:
Tags: 5th | innotrack | november | of | remember | the

less

Transcript and Presenter's Notes

Title: INNOTRACK


1
  • INNOTRACK
  • Dissemination and Training
  • Presentation on
  • the Kick Off meeting
  • in Paris
  • on the 5th and 6th of October 2006
  • By Björn Paulsson UIC

2
INNOTRACK - project organisation
SP0 InnoTrack Coordination UIC
SP2 Track Support Structure SNCF Track
subgrsde monitoring assessment Evaluation
and test of superstructure innovations
SP4 Rails VAS/ CORUS Methodology for Duty
conditions Supported track Form Rail
steel Material Grinding methodology
SP3 Switches and Crossings DB Predictive
Models for SC Switch designs Standards LCC
analysis
SP1 Dury NR
Vehicle track Characteristics General model
of failure/degradation
SP6 LCC DB
LCC methodology RAMS technology LCC models
SP5 Logserv ALSTOM
Best logistics practices New logistics
processes Cost effective methodologies
SP7 Dissemination and Training UIC
3
Management structure
4
Current development process
Verification tests
State of the art
Investigations
Final design
National acceptances
Pilot delivery
Volume deliveries
Development
Revisions
The impact of the generated INCREASED KNOWLEDGE
State of the art
Investi- gations
Verification tests
Final design
National acceptances
Pilot delivery
Volume deliveries
Development
Revisions
The impact of a COMMON EUROPEAN ACCEPTANCE PROCESS
Time n-x cost n-x
State of the art
Investi- gations
Deve- lopment
Verification tests
Final design
European acceptance
Pilot delivery
Volume deliveries
Revisions
Time n-x cost n-x
UNIFIED ACCEPTANCE CRITERIA
Year 1
Year n
5
(No Transcript)
6
  • Dissemination and Training
  • is not enough
  • Remember that it is when the result is
    implemented the benefit from INNOTRACK is reached

7
  • Agenda

INNOTRACK Kick Off Meeting i Paris 5th and 6th of
October 2006 Agenda Day 2
Write a Comment
User Comments (0)
About PowerShow.com