Title: OOA
1DFS on the move to very advanced
V ery A dvanced F DP O
perational R equirements I
mplemen T ation
Development Process
2Contents
- VAFORIT scope
- schedule
- evolutionary prototyping
- verification validation
- development and simulation environment
- adaptation of P1 ATCAS, operational environment
- functional aspects to be delt with in second part
of presentation by Mr. Willenbockel
3Overview
VAFORIT
EVA
F D P S
P1-V
4VAFORIT FDPS Functionality
5VAFORIT Schedule
6Evolutionary Prototyping
- Results
- Requirements shall be implemented in steps
according to operational priorities - Prototype, that complies with the VAFOR
Requirements, ready for operational use - Minimisation of risks by means of
- Transparency in the realisation process
- Implementation of necessary amendments and
corrections of system specifications - Early validation of compliance to operational
concepts - Target date
- Ready for site implementation about 2003
7Evaluation Phases Of The Prototype
1) Verification of Build 1 ( FAT )2)
Validation of Build 1
3) Verification of Build 2 (FAT) 4)
Validation of Build 2
5) Technical and operational Evaluation
of VAFORIT FDP and HMI in P1 Environment
AFS Environment
AFS Environment
oper. Environment
8Development / FAT Environment
FAT Configuration
9Validation
- test of the system with special attention to the
needs and expectations of the user - use of the DFS Advanced Function Simulator (AFS)
in Langen, responsibility by DFS - additional simulation independent of INDRA
simulation - stepwise performed for Build 1 and 2
- improvements optimizations implemented in the
software and regression tested
10P1 Integration
P1/ATCAS
P1/VAFORIT
SSS C.5
HMI
EVA
SSS C.X
P1
P1-V
SSS C.X1
P1 Additions
FDPS
VAFORIT
SSS System Segment Specification
11P1 Integration Process
12Some transition aspects
- first site yet to be defined
- infrastructure at our sites allow installation of
the VAFORIT system in parallel to running system - shadowing operation in order to gain credibility
- intensive training due to changing procedures
- controllers that were involved from the beginning
will function as trainer
13Major Milestones
- P1-V Contract Award I /2000
- EVA Contract Award II/2000
- FDPS Design ready IV/2000
- FDPS Build 1 FAT III/2001
- FDPS Build 1 SAT IV/2001
- P1-V FAT IV/2001
- EVA Build 1 validated IV/2002
- FDPS Build 2 SAT IV/2002
- EVA Build 2 validated IV/2003
- Integration of FDPS/EVA/P1-V IV/2003
14BACK-UP
15VAFORIT Goals
PBR 3 February 1998
- Stepwise implementation and Installation of a
future Flight Data Processing System (FDPS)
according the requirements defined in the VAFOR
document. - Definition and Realisation of a future HMI for
strip-less operations. - Integration with the ATS System P1.
- Realisation of P1-V (Adaptation of P1 in VAFORIT)
Steering Group July 99
16Highlights of VAFORIT FDPS Step 1
- 4D Trajectory Prediction
- Automatic System Co-ordination (OLDI 2.2)
- Flight Progress Monitoring
- Medium Term Conflict Detection
- Identification by Mode S-Data
- (Elementary Surveillance)
- Support of the DFS Sector Concept
- Flexible use of airspace
- Support strip-less operations
- more open architecture (NOS-CORBA Gateway)
Focus is going to move to planning tasks
17Major Milestones (Build 1)
18Major Milestones (Build 2)
19Major Fuctions In Step 1
- 4D Trajectory Prediction
- System supported co-ordination level 1 (OLDI
2.2) - Flight progress monitoring
- Medium Term Conflict Detection
- Flight identification based on Mode S data
(Elementary Surveillance). - Support new DFS sector concept
- Support flexible use of airspace
- Support of stripless operations.
20Verification
- objective technical and operational requirements
- responsibility contractor (INDRA)
- stepwise performed for Build 1 and 2
- use of the test environment of INDRA
- acceptance by FAT
21Scope Of P1-V
- P1 Components which have to be changed- RDPS1),
DMS2),CMD3) SMC4),DRF5) - The VAFORIT system will substitute the following
P1 components- FDP6) (?VAFORIT), FDD7)
(?FDA8)), SDD9) (?EVA10)) - Development parallel to other P1/ATCAS Releases
- Development in 2 releases
- release 1 Integration with FDPS and EVA
- release 2 Incorporating further developments of
the P1/ATCAS release-developments)
1) Radar
Data Processing
System, 2)
Database
Management System, 3)
Control and Monitoring
Display
1
4) System
Monitoring
and
Control
, 5)
Data Recording Facility
, 6)
Flight Data Processing
, 7)
Flight Data
Display
8)
Flight Data Assistant
, 9) Situation
Data
Display, 10)
Eurodisplay Very Advanced
22P1 Integration Process
23P1 Integration - Process