Title: Environmental Groups
1San Francisco-Oakland Bay Bridge East Span
Seismic Safety Project
STEEL FABRICATORS OUTREACH July 17, 2001
2Program Project Overview
Amer Bata Senior Bridge Construction Engineer
3Program
- Project Overview
- Steel Design
- Steel Specifications
- Welding and Testing
- DBE Partner Participation/SBE
- DBE Certification Process
- Break
- Question/Comment Answer
- Open Discussion
- Lunch
- Open Discussion Continues
4Project Limits
5SFOBB East Span - Existing/ Proposed
Existing
Proposed
6Cross Section
Shoulder
Shoulder
Five Traffic Lanes
Bike / Ped
7SFOBB Contract Segments
Segment
YBI
Skyway
Oakland
SAS
Hinge A
Hinge E
Frame 1
Frame 2
Frame 3
Frame 4
8Segment 1 - YBI Structures
- Viaduct Modification
- Temporary Detours
- Transition Structures
- EB On-Ramp
9Detour Structures
- Structural Steel 5,700,000 Kg
10 Segment 2 - Self-Anchored Suspension
- Structural Steel 60,000,000 Kg
- 2.5 m Steel Piles 2,100 m
11Bridge Elevation
657 m
385 m
80 m
180 m
12 m
Elev. 160m
Pier W2
Aprox. OG along PG Line
Pier 1 Tower
Pier E2
12Temporary Towers
13Segment 3 - Skyway
- Structural Steel 33,000,000 Kg
- 2.5 m Steel Piles 15,000 M
14Transition Span
15Pile Cap
16 Segment 4 - Oakland Touchdown
17Construction Schedule
Tentative schedule, subject to change
18Steel Design
Rafael Manzanarez Bridge Design Manager
19Project Limits
20Single Tower - SAS
21Elevation and Plan View
22Dual Box Girder
23SAN FRANCISCO-OAKLAND BAY BRIDGE - FINAL TYPE
SELECTION
24Erection - Temporary Towers
25Transverse Elevation Looking East
26Tower Foundation
27Steel Framing Plan
28Tower Foundation
29Elevations
30Steel Framing Plan
31Pile
32Tower Anchorage Layout
33Tower Anchorage Details
34Transverse Elevation Looking East
35Tower Section and Shear Links
36Tower Diaphragms
37Tower Shear Link
38Bridge Plan ( Cable and Saddles)
39Cable
40S-Wire Wrapping
41Tower Saddle
42Deviation Saddle DetailPlan View
43W Line Section Type 1A
44E Line Section Type 1A
45Floorbeam Section and Detail
46Typical Crossbeam Details
47East Cable Anchorage Layout
48Bushing and Bearing
49Skyway Structure
50Plan for Piers E3E14
51Pile Head Connection
52Sections
53Bike Path
54CISS Concrete Piling
55Sections and Dimension Table
56Typical Section
57Pipe Beam Elevation
58Section F-F
59Bent WB1
60Section A-A
61Typical Section
62Section B-B
63Railing Details
64Bike/Pedestrian Path
65Modified Type 732 Steel Barrier - 65 Design
(August 1999)
66Swiveling Joint Seal Assembly
67Skyway StructuresFooting Layout No. 2
68Skyway Precast (1) Hinge A
69Section A-A YB4E1
70Section B-B YB4E1
71Section C-C YB4E1
72Section D-D YB4E1
73Section E-E YB4E1
74Single Tower - SAS
75Dual Box Girder
76Structure Specifications
Sharon Naramore Senior Bridge Engineer
77Steel Items
- Girders, Shapes, Plates
- Piling
- Hinge Joints, Bearings and Pipe Beams
- Anchorages and Saddles
- Tiedowns and Tiebacks
- Barrier, Railing, Lights
- Travelers and Elevator
- Service Platforms and Substation
- Miscellaneous Metal
78Steel Structures Special Provisions
- Buy America
- Welding
- Steel Audits
- Steel Pipe Piles
- Steel Structures
- Miscellaneous Metal
- Plus the Information Handout
79Buy America
- Standard Requirements
- Does not apply to temporary towers
- Does not apply to detour structures
80Welding Quality Control
- Applies to all steel items
- Welding Meeting
- QCM
- QCP
- Document Submittals
81Steel Audits
- Applies to all steel items
- Steel Fabrication Meeting
- Self Audit
- Caltrans Audit
- Document Submittals
82Steel Pipe Piling
- UT Technician Certification (field welds)
- AWS D 1.1 and API combined code
- Field welds vs. shop welds
- NDT requirements
- Documentation Submittals
83Steel Structures
- AISC Cbr, Major Steel Bridges, endorsement F,
FCM
- AISC, CASE, Certified Advanced Steel Erector,
endorsement F, FCM
- Mostly ASTM A709, with supplementary
requirements
- AWS D 1.5
- Construction Surveying
84Steel Structures
- Typical Structural Steel
- girders, plates, shapes, connections
- Furnish
- Erect
- Orthotropic box mock assembly
- Barrier, Rails and Light Standards
85Steel Structures
- Non-typical Structural Steel
- Hinge pipe beams
- Modular joint seal assemblies
- Circular segmented bearings
- Travelers and Elevator
- Substation components
- Service platforms
- Casting allowed for SAS components
86Miscellaneous Metal
- Welding Quality Control
- Some connection requirements may apply
- May attach to steel structure elements so the
connection is governed by Steel Structures
requirements
87Information Handout
- Caltrans UT Technician Certification Program
- Steel Audit Form
- PIDP Report
88Welding and Testing
Jim Merrill Senior Welding Engineer
89Steel Materials Testing - QC/QA
- Welding Quality Control
- Steel Audits
- Project Specific Discussion
90Welding Quality Control
- Field Vs. Shop
- Quality Control Manager (QCM)
- Pre-weld Meeting
- Quality Control Plan (QCP)
91Weld Quality
- Shop Vs. Field
- Code Quality is the same
- Same Allowable Stress
- Skill Level of Welders
92Quality Control Manager (QCM)
- Must be a Direct Employee of Prime
- Primary Contact for Quality Matters
- Review submittals
- Represents contractor and subs
- Certified Welding Inspector (CWI)
- Level II in NDT Methods Utilized
93Pre-weld Meeting
- Discussion of Sec. 8.3 (Special Provisions)
- Certification of personnel
- Procedure Qualification
- Development of QCP
- Required documents
- Questions from the Contractor
94Quality Control Plan
- Welding Procedures
- WPS, PQR
- Caltrans Witness
- Welder Qualifications
- Process, 3 year limit
- Caltrans Witness
- NDT
- Level II, III
- Written Practice
95Steel Audits
- Self Audit
- All audit items are contract requirements
- Caltrans Audit
- Prior to beginning Fabrication
- Formal Audit
- Purpose to Determine Capability
- Re-audit
- If required
- Max 3 times
96Project Specific
- Caltrans UT Certification
- Deck Mock-up
- Distortion Control Plan
- QC Presence
- Fatigue Details
- Fabrication Survey
97Caltrans UT Certification
- Caltrans UT Technician
- Certification Program
- Written Portion (Code Knowledge)
- Hands on (code technique acceptance)
98Deck Mock-up
- Fabricator to Provide Deck Mock-up
- Demonstrate Fabricators Procedures
- Welding Procedures
- Distortion Control
- Assembly Practice
99Distortion Control Plan
- Orthotropic Deck, Tower
- Holding of required dimensional tolerances
- Jigs and Fixtures
- Prevention of residual stress
- Lamellar tearing
- Pre and Post weld Heat Treatments
100QC Presence
- QC CWI Presence
- When any work is being performed
- all shifts
- all shops
- Before, During and After Welding
- 30 minute max duration
101Fatigue Details
- Specific Shape
- Weld Profile
- Depth of Penetration
102Fabrication Survey
- Must be performed at Fabrication Facility
- Deck Sections per Fit-up
- Match Field Erection