Title: RISK STUDY ANALYSIS FOR PETAL INTEGRATION MountUnmount
1RISK STUDY ANALYSIS FOR PETAL INTEGRATION
(Mount/Unmount)
2RISK STUDY ANALYSIS FOR PETAL INTEGRATION
- The goals of this risk analysis are
- To find all potential problems during petal
integration (Mount/Unmount) - For each case, study a solution to improve the
safety of process. - To validate this solution or specific tools and
to share this development between PICs.
3RISK STUDY ANALYSIS FOR PETAL INTEGRATION
- The potential problems list
- Unmounting modules Extraction force, thermal
lubricate sticking, falling screw, distance plate
sticking, modules maintains. - Cleaning modules thermal lubricate cleaning,
Modules maintains - Unmount and cleaning center liners and others
parts unmount center liner, thermal lubricate
cleaning, arrangement logistic. - AOHs changement Scenario
- Risk analysis report http//gfffhkjfhsdkf
4RISK STUDY ANALYSISForce extraction Tests
- One important problem
- Could be the sticking
- Force due to thermal
- Lubricate on module.
- We decided to measure
- This force value is 5 cases
- After heating
- After cooling
- After free air 10 mn
- After free air 2 days
- After dry air 2 days
5RISK STUDY ANALYSISForce extraction Tests
Best case After 2 days under dry air (less than
all others mean 68gr)
6RISK STUDY ANALYSISTOOLS FOR DYNA SCREW
Manipulation of little Screws during mount Or
unmount. Specific tool developed Directly
assembled on Dynanometer screw Driver.
7RISK STUDY ANALYSISDISTANCE PLATE STICKING
Plastic plate
Move module
Unmount module
Move module above Plastic plate
Warning distance plate
distance plate sticking
Petal Frame Plastic Protection Scenario
8RISK STUDY ANALYSISSPECIFIC TOOLS MOUNT/UNMOUNT
Our experience Proved that Specific tool
for Module integration Or extraction is More
safety We propose to Use it for each Ring.
9RISK STUDY ANALYSISSpecific Module Support for
Cleaning
After module Extraction, in order To clean
module In safety condition We have to place This
module on Specific support Plate with
little Modification This for each ring.
10RISK STUDY ANALYSISSpecific Module Support for
Cleaning
For both face The cleaning With cotton Stem and
Polypropanol Would be without Any pressure
on Module.
11RISK STUDY ANALYSISUNMOUNT center liner
- Unmounting center liner
- Take a big screw and to screw until the end
- After center liner go to up
12RISK STUDY ANALYSISCleaning mechanics parts
All different mechanical Parts and center
liners Would be cleaning In each box inside a
Ultrasonic cleaner during 25 mn at ambiant temp.
13RISK STUDY ANALYSIS FOR PETAL INTEGRATION
- Preliminary conclusions
- This study shows that we can decrease risk on
module during mount or unmount scenario. - The time estimate to complete unmount a petal is
3 Days, in order to extract, to clean, to stock
and be ready for a new petal integration.
14RISK STUDY ANALYSIS FOR PETAL INTEGRATION
- Preliminary conclusions
- To mount
- Specific tool maintaining for module integration.
- Plastic petal frame protection
- Adapter dyna screw driver
- To unmount
- Same points
- Ultrasonic cleaner using
- Dry air stockage before unmount.