Transcript and Presenter's Notes

Title: Communication Forum


1
  • Communication Forum
  • 16th September 2003
  • Henry Gun-Why
  • Estates Management DL

2
Reception Building Progress
  • Tender return on 23rd July 2003, tender returns
    in excess of the budget allocation.
  • Tender Analysis is has been completed and
    Contract agreed at 1.654 including VAT
  • Principal Contractor Whites
  • Pre Contract Meeting 16th September 03
  • Start on site Monday 22nd September 2003
  • Completion May 2004

3
Reception Building
4
Reception Building
5
Daresbury Laboratory Access and Main Entrance
and widening of Keckwick Lane - 6th October 2003
6
Keckwick Lane Construction Works
  • The proposed works and approval resides with
    Halton Borough Council
  • Halton Borough Councils main concern is that all
    the services are co-ordinated and inserted into
    the highway or pavement , once.
  • Gas, Electricity, BT,NTL etc.
  • BT diversions have been ongoing in August and
    have been diverted onto DL site.
  • Anticipated widening construction works 6th
    October 2003, to be confirmed.

7
Daresbury Science Park Progress
8
Daresbury Science Park Progress
  • Steel work to both buildings complete
  • Pumped concrete for floor slabs on going,
    therefore lots of concrete mixer lorries on
    Keckwick Lane
  • More cranes will arrive on the site, to be used
    to fit cladding panels and roofing.
  • Wind and water tight before winter, completion
    April /May 2004.

9
Daresbury Science Park Progress
10
Daresbury Science Park Progress
11
Estates Management Group Activity Update and
Issues Raised
  • Decentralisation of Site Heating Gas Supply
  • HSE Fire Precaution and Disability Discrimination
    Act Survey A Block complete - preparation for
    the remainder of site.
  • HSE Fire Precautions Phase 1 - work has commenced
    in the SR and Tower completion March 2004 Fire
    Panels replacement
  • Space Utilisation and Functional Suitability
    Survey ongoing December 2003
  • De-commisioning of Radiochemical Lab ongoing
    completion 27th September 2003
  • Astec and 4 GLS Enabling Works Tower ongoing
  • Upgrade of Lecture Theatre Main Entrance 17th
    September 2003
  • Toilet Upgrade in B Block Ground Floor Centre
    15th September 2003

12
Tower
13
Tower Clearance
14
Tower Clearance
15
Tower Preparation
16
Tower Clearance
17
Tower Clearance
18
Estates Management Group Activity Update and
Issues Raised
  • Office Relocations for effective organisations
    Relocation Relocation ongoing
  • Hostel Accommodation Project feasibility into
    replacement with a Hotel , Retail Outlet and
    Hostelry .
  • House Options Low Wood Project feasibility
    in developing this site with a Third Party
    Operator as a Crèche Facility. Demand ?
  • Estates Management Website Development 9th
    September 2003.
  • Welcome, Services, Projects, Contacts, Site
    Information , Health and Safety, Procedures and
    Guides, Job Requests, Useful Links, Feedback and
    a Search Facility
  • Bids to OST for projects such as C Block
    fenestrations awaiting a positive response.
  • Health and Safety induction Unit