How to diagram a pulley system - PowerPoint PPT Presentation

1 / 11
About This Presentation
Title:

How to diagram a pulley system

Description:

How to diagram a pulley system! Anchor point ... You can use a sticker to represent your pulleys. Load ... Double Pulley Systems. L. E. Single-fixed / single-movable ... – PowerPoint PPT presentation

Number of Views:203
Avg rating:3.0/5.0
Slides: 12
Provided by: cdsch
Category:

less

Transcript and Presenter's Notes

Title: How to diagram a pulley system


1
How to diagram a pulley system!
2
Anchor point
  • The anchor point should be a solid black box
    fixed to a surface.

3
Dot
  • Draw a large dot to show where the end of the
    rope is connected.

4
Rope
  • Use a nice black line to represent the ropes.

5
Pulley
  • Use a larger circle with a dot in the middle to
    represent the pulley.
  • You can use a sticker to represent your pulleys

6
Load
  • Use the same symbol we used for load with levers.
    Draw a box with an L in it.

L
7
Effort
E
  • Use the same symbol we used for effort with
    levers. Draw a circle with an E in it.

L
8
Direction
E
  • Use a line with an arrow to show the direction of
    the effort and where the rope goes.

L
9
Labels
E
  • Make sure you label each type of pulley in the
    system

L
Single-movable pulley
10
Single Pulley Systems
E
E
L
L
Single-fixed
Single-movable
11
Double Pulley Systems
E
E
L
L
Single-fixed / single-movable
Write a Comment
User Comments (0)
About PowerShow.com