Transcript and Presenter's Notes

Title: Budgets


1
  • Budgets Projects Forum
  • April 25, 2006

2
Agenda
  • Overview
  • University Budgets
  • Endowment
  • Energy
  • Capital Projects
  • Q A

3
The Resource Perspective
4
Financial Performance Overview FY 1995, FY 2006,
FY 2012
5
Resources Building Blocks
  • Generally Positive Economy
  • Successful Completion of 470M Capital Campaign
  • Supportive Community
  • Experienced and Collegial Leadership
  • Talented Staff
  • Clear Organization and Responsibility Structure
  • Effective Information Systems
  • Policies and Procedures
  • Master Plans University, Major Program Areas
    and Assets
  • Financial Planning Model and Integrated Plan

6
  • University Budgets

7
FY 2006 Operating Revenues
Where Does it Come From?
8
Where Does it Go?
9
Where Does it Go?
10
FY 2006 FY 2007 Budget Assumptions
11
  • Endowment

12
Beginning Year Market ValuesFY 1995 FY 2006
ENDOWMENT BEGINNING YEAR MARKET VALUES (M)
13
Annual Endowment Total Returns
YTD
14
Endowment Draw for Operations
BASED ON 3-YEAR AVERAGE MARKET VALUE
Goal Sustainable draw at 5 or less (historical
average total return CPI)
(budgeted)
15
Gifts Added To Endowment vs. Draw for
Operations(M)
16
  • Energy

17
Utilities Consumption - Main Meters
Includes gas and oil consumed for central
heating plant.
18
Energy Savings Program FY 05 06 Implemented
and Planned Energy Conservation Measures
19
Energy Savings Program
  • Energy prices have been unstable during FY06
  • FY06 utility expenses projected at 13M
  • Recommended FY07 utility budget is net of
    projected 1M in reduced costs resulting from
    Energy Savings Program
  • Spent 1.4M on energy savings projects since FY
    2005

20
  • Capital Projects

21
FY 2006 Projected Capital Expenses and FY 2007
Preliminary Capital Budget
22
Major Current and Planned Projects
23
Science Complex Renewal ProjectPreliminary
Schedule
24
(No Transcript)
25
Science Complex Renewal Project
  • Phases 1 and 2 Schematic Design (SD) nearly
    complete
  • Final programmatic decisions by Provost being
    incorporated
  • Pricing of SD to begin May 5

26
Science Complex Renewal ProjectCross Section of
Phase 1 Building
27
Science Complex Renewal Project
  • Phases 1 and 2 Schematic Design (SD) nearly
    complete
  • Final programmatic decisions by Provost being
    incorporated
  • Pricing of SD to begin May 5

28
Heller School Schneider BuildingArchitects
Rendering
29
Schneider Building, Heller School View of Main
Entrance
4/19/06
3/17/2006
30
Schneider Building, Heller SchoolView of Forum
4/19/06
3/13/2006
31
Schneider Building, Heller SchoolArchitects
Rendering of Forum
3/13/2006
32
Heller-Brown Renovation
  • Renovation scope to include
  • Code-work
  • Complete mechanical upgrade
  • New classrooms
  • Conference rooms
  • Graduate student carrels
  • GIS lab
  • Offices
  • Replacement and addition of furnishings

33
Infrastructure Renewal Project
  • Infrastructure Renewal Project largely complete
  • Remaining elements include
  • Second phase of the campus signage program
  • New electric substation

34
Edmond J. Safra Center for the Arts
  • Schematic design by Bruner/Cott nearing
    completion
  • Based on programming work
  • Coordination with campus master plan

35
Edmond J. Safra Center for the Arts Both Phases
  • Siting study
  • Constraints include wetlands, Rose Art, Spingold,
    and important pedestrian path to IBS
  • Phasing options study
  • Phase 1 23,000 SF, east of Pollack
  • Future Phase 2 south of Phase 1, linking to
    Goldman-Schwartz

36
Edmond J. Safra Center for the Arts
  • Schedule
  • Schematic design expected to be complete by end
    of May
  • Start of construction anticipated in early 2007
  • Occupancy of Phase 1 building for fall 2008
    semester

37
New Ridgewood Residence Hall
  • New residence hall to occupy existing Ridgewood
    Quad site
  • Planned apartment style housing to provide 250 to
    300 beds
  • Consultant Biddison Hier assisted University in
    initial programming
  • Architect William Rawn engaged, initially for
    Pre-Design Cost Control workshops

38
Old South Street Project
  • Two parcels acquired by University, adding 2/3
    acre to Universitys existing 1-1/4 acres
  • With Old South St. and land on. opposite side of
    street, site is 4 acres.
  • Renovation to be completed, to provide new home
    for Rabb School and BOLLI.
  • Removal of MEU from Chapels Field

39
  • Questions Answers

40
Brandeis Web Pages
  • Executive Vice President/Chief Operating Officer
    (www.brandeis.edu/evpcoo/)
  • Budget (www.brandeis.edu/budgetandplanning/)
  • Business Conduct Policy (www.brandeis.edu/evpcoo/)
  • Facilities Services (www.brandeis.edu/facilities/)
  • Financial Affairs (www.brandeis.edu/financialaffai
    rs/)
  • Human Resources (www.brandeis.edu/humanresources/)
  • ITS (http//lts.brandeis.edu)
  • Capital Projects (www.brandeis.edu/capitalprojects
    /)
  • Public Safety (www.brandeis.edu/departments/public
    _safety/)