Title: Communication Forum
1Communication Forum 29th July 2004 Henry Gun-Why
Estates Management DL
2Keckkwick Lane Nearly there
- Apologies Traffic Lights at the top, commenced
without notices, by courtesy of Core Utilities - Apologies Traffic Lights did not work
- Apologies for the accident
- Apologies for the anxiety cause
- Nothing to do with Wates , cables for DL.
3Keckwick Lane
4Traffic Arrangements on A558 from 22 July
- A single way closure is to be implemented on the
A558 Daresbury Expressway from Thursday 22 July
for 5 weeks. - The closure will apply to the section of the A558
between the Manor Park (Pitts Heath Lane)
roundabout and the A56 Chester Road roundabout.
The closure will prohibit eastbound traffic on
this section of the expressway (traffic bound for
Warrington and M56 junction 11). - The diversion route is Daresbury Expressway -
Central Expressway - Rocksavage Expressway - M56,
from junction 12 to junction 11 - A56 Chester
Road. - Non-motorway traffic will follow the same
diversion route to Clifton roundabout (M56
junction 12) and then be directed along the A56
for Warrington. - Traffic bound for Runcorn and Widnes from the A56
will still be able to travel along A558. - The closure is necessary to complete the
construction of the new roundabout on the A558
which will provide the link to Keckwick Lane. - The closure scheme has been developed in
discussion between Halton Borough Council,
Cheshire Traffic Police and Warrington Borough
Council's Highways department. - Plans detailing the route will be available to
view in the following locations Amenity Area B
Block Foyer, Coffee Lounge, A Block Foyer (near
Science Centre), S Block office entrance, Tower
Foyer and Hostel. - Any queries about this notice should be addressed
to Steve Dobson ext 3365 or Hazel Harkins ext
3468. - Henry Gun-WhyHead of Estates Management
5(No Transcript)
6(No Transcript)
7(No Transcript)
8(No Transcript)
9SITE ROAD STRAIGHTENING PEDESTRIAN ACCESS
10SITE ACCESS TRAFFIC CONTROL
11Bike Motor-Bike Shelters
12(No Transcript)
13Reception Centre Progress
- Principal Contractor Whites Building Services
- Start on site Monday 22nd September 2003
- Demolition w/c 6th October 2003
- Time Capsules
- Security Systems transfer being arranged with
Keith Cope -BITD - Completion 30th July 2004, external works to
continue - Project Monitoring to Project Team and Project
Board
14(No Transcript)
15(No Transcript)
16(No Transcript)
17(No Transcript)
18(No Transcript)
19(No Transcript)
20(No Transcript)
21(No Transcript)
22(No Transcript)
23(No Transcript)
24New Boiler A Block Basement
25(No Transcript)
26Big Plant Outside A Block
27(No Transcript)
28(No Transcript)
29Cleaning out the pipes - 1
30Henrys escape tunnel
31Cleaning out the pipes - 2
32(No Transcript)
33Broken Drain Outside SuperStem
34(No Transcript)
35(No Transcript)
36Big Plant Outside A Block
Big Plant Inside A Block
37(No Transcript)
38(No Transcript)
39(No Transcript)
40(No Transcript)
41(No Transcript)
42(No Transcript)
43(No Transcript)
44(No Transcript)
45(No Transcript)
46(No Transcript)
47(No Transcript)
48(No Transcript)
49Estates Management Activity Update and Issues
Raised
- Proposed Decentralisation of heating system ,
commencement May 2004, completion September
2004. - Estates Management Website http//www.estates.dl.
ac.uk , to be updated in June 2004 . - Development of a DL Emergency Plan on going in
draft June 2004 Bike Sheds to be relocated to
Main Car park , consultation required
50Estates Strategy - OST proposed funded projects-
2004-2005
- Replacement Site Water Main
- Asbestos removal within Tower Building
- Tower Ventilation system replacement
- Replacement of Roofs
- Replacement of CBlock Elevations
- New Entrance for B Block from Car Park - DDA
- Upgrade entrance to A and B Blocks- DDA
- Upgrade Main corridors A and B Blocks
- Upgrade Road surfaces, replace security barriers
and replace wooden kerbs. - Electrical Testing of Buildings
51Estates Management Activity Update and Issues
Raised
- Decentralisation of Site Heating Gas Supply
Hobb Lane, A56 Chester Road, down Keckwick Lane
by July 2004. - HSE Fire Precautions Phase 1 - work has commenced
in the SR and Tower completion September 2004
Fire Panels replacement - Fire System Replacement - Tower, Stores , E
Block and A Block Summer 2004
52Other Matters
- Power dips on Monday 19th July 2004
- Board of Enquiry into the Tower Incident 16rh
May 2004 completed - Mini Board on Enquiry into recent fire in C
Block. - Site entrance, access control and mods to site
roads - Fitness Centre office improvement
- Daresbury Campus Building 2
- Future Forums
- Invitation to other departments to present -
- Learning and Development
- Communications Group
- SRD Operations
- Health and Safety
- Trade Unions
- Others