Description:

A number of amendments required. Can be categorised into: - provision of services ... Based on expenditure against forecast, adjusted for growth ... – PowerPoint PPT presentation

Number of Views:35
Avg rating:3.0/5.0
Slides: 16
Provided by: ORG9
Category:

less

Transcript and Presenter's Notes

Title: 2003 Victorian Gas Access Arrangement Review Public Forum Essential Services Commission Tuesday, 13


1
2003 Victorian Gas Access Arrangement Review
Public Forum Essential Services
CommissionTuesday, 13 August 2002
2
Draft Decision
  • ESC assessment of DB proposals
  • A number of amendments required
  • Can be categorised into
  • - provision of services
  • - X factors (revenue demand assumptions)
  • - other price controls tariffs
  • - use of system terms conditions

3
Draft Decision Overview
  • Services
  • - Approve proposed reference services adopt GSL
    scheme, various amendments to Terms
    Conditions, Distribution Code
  • X Factors
  • - X factors to be amended (lower prices)
  • - Lower revenue higher demand assumed
  • Other price controls
  • - Accept proposed form of price control with
    amended formulae
  • - Amend approval processes, re-balancing

4
Draft Decision Overview
  • Amendments reflect ESCs assessment of proposals
    against the Code
  • Consideration of responses, comments
  • Further consultation
  • - Expenditure (especially safety issues)
  • - Queries regarding calculations
  • - Terms Conditions working group
  • - Other workshops if necessary
  • Final Decision 2 October 2002

5
Services
  • Proposed Reference Services
  • Non-Reference Services
  • GSL Payments Scheme
  • Extensions expansions

6
GSL Payments scheme
  • Appointments
  • - 50 if more than 15 minutes late
  • Connections
  • - 80 per day if not connected within 2 days
    (capped at 240)
  • Repeat interruptions
  • - 50 per event if more than 3 interruptions in
    a year due to faults
  • Lengthy Interruptions
  • - 80 if not restored within 12 hours

7
Extensions Expansions
  • Connection charges
  • - economic feasibility test
  • - guidelines for application
  • Reticulation of towns
  • - distributors proposals approved
  • - application of economic feasibility
  • - net financing costs, efficiency carryover
  • - retain discretion

8
Revenue Demand
  • Operating expenditure
  • Capital expenditure
  • Efficiency carryover
  • Demand
  • Finance Issues

9
Operating Expenditure
  • Base year (2001)
  • existing marketing expenditure, licence fee
    recovery through price controls
  • Adjustment for scope changes 0.5m
  • Annual productivity trend (1)
  • Relies on incentives rather than line-by-line
    assessment

10
Capital Expenditure
  • Envestra accepted
  • - (GSL allowance to be added)
  • Multinet and TXU proposal for significant
    increases
  • Draft Decision assumes a 20 increase in existing
    levels
  • Subject to further consultation

11
Efficiency Carryover
  • Retain gains for 5 years
  • Based on expenditure against forecast, adjusted
    for growth
  • Envestra proposal for 10 years to be amended
  • Multinet allowance of 16.1M for gains made
    during 1998-2001

12
Demand
  • Draft Decision adopts adjusted (upwards)
    distributor forecasts
  • Further consultation on detailed assumptions
  • Dealing with queries raised by distributors re
    calculations

13
Finance Issues
  • Asset base roll-forward
  • After tax cost of capital (6.7)
  • Cost of tax allowance
  • Proposal to lock-in methodology
  • Depreciation straight-line method
  • Working capital

14
Price Controls
  • Form of price control
  • Rebalancing controls
  • Tariffs and tariff structures

15
Price Controls
  • Accept tariff basket form of control
  • Re-balancing constraint of CPI2
  • - Some amendments to algebra
  • Upper lower bounds for tariffs
  • Amend annual approval processes
  • Licence fee recovery
  • Public Tariff Report