PREPARATION, EXECUTION AND PERFORMANCE OF A DESIGNBUILD CONTRACT

Description:

Complete control over design and construction. Single point of responsibility ... Recover overhead and general conditions as well as profit. FASTER AND MORE ... – PowerPoint PPT presentation

Number of Views:61
Avg rating:3.0/5.0
Slides: 18
Provided by: jann157
Category:

less

Transcript and Presenter's Notes

Title: PREPARATION, EXECUTION AND PERFORMANCE OF A DESIGNBUILD CONTRACT


1
PREPARATION, EXECUTION AND PERFORMANCE OF A
DESIGN/BUILDCONTRACT
  • Erik M. Rosenwood and Adam L. Horner
  • DESIGN PROFESSIONAL SERVICE GROUP

2
Topics to be covered
  • Understanding the risks and rewards of
    Design/Build
  • Things to consider when executing Design/Build
    contracts
  • Performing a Design/Build Contract as a Design
    Professional

3
DESIGN/BID/BUILD
OWNER
General Contractor/Construction Manager At-Risk
Architect/Design Professional
4
DESIGN/BUILD
  • Owner

Design/Builder
Architect/Design Professional
Construction subcontractors
Sub-consultants (geotechnical, environmental,
civil, etc.)
5
  • PART I
  • UNDERSTANDING THE RISKS AND REWARDS OF
    DESIGN/BUILD

6
Benefits of Design/Build
  • Faster and more cost effective
  • Complete control over design and construction
  • Single point of responsibility
  • Focus on problem solving, not assigning blame for
    problems
  • Currently about 40 of the market and growing!
  • Ability to identify and address errors in design
    before they become a big problem Limit exposure
  • You control the flow of money
  • Much higher profit potential
  • Recover overhead and general conditions as well
    as profit

7
FASTER AND MORE COST EFFICIENT
  • Enhance constructability and cost estimating
  • Value engineering
  • Geotechnical and Environmental concerns
    integrated into project planning and sequence
  • Long lead item procurement
  • Identifying design delegation responsibilities
    with subcontractors

8
Things to Consider Before Choosing Design/Build
  • Is there a conflict? Design Professional is
    under contract with Design/Builder not Owner
  • Creating a separate corporate entity
  • Considering Risk
  • Guaranteed Maximum Price
  • Subcontractor default
  • The Expectations Problem
  • Playing the role of general contractorAre you
    ready?

9
Things to Consider Before Choosing Design/Build
(Cont.)
  • Construction accounting skills lacking
  • Licensing issues
  • No Standard of Care
  • Job Site Safety
  • Risks as Design Professional Subcontractor

10
  • PART II
  • Executing Design/Build Contracts

11
AIA Contracts
  • A141-2004 Owner / Design-Builder Agreement
  • A142-2004 Design-Builder / Contractor Agreement
  • B143-2004 Design-Builder / Architect Agreement

12
Things to Consider When Contracting with Owner
for Design Build?
  • Does Owner have Owners rep. or consultant?
  • Communicate and Document
  • Limitation of Liability
  • Explain duties of all parties in letter or
    memorandum
  • Arbitration provision?

13
  • PART III
  • PERFORMANCE OF THE DESIGN PROFESSIONAL IN
    DESIGN/BUILD CONTRACTS

14
Things to Consider when Contracting with
Design/Builder as Design Professional
  • Try to limit liability for flow down claims
  • Clearly define scope of work
  • Limitation of Liability
  • Arbitration provisions
  • Limiting consequential damages

15
Risks for the Design Professional in a
Design/Build Contract
  • Flow down provisions for Design Professional
    Subcontractor
  • Design Builder may want less than full
    construction drawings to limit cost
  • Other subs may do portions of design
  • Construction Administration services are usually
    very limited
  • Respond to questions and inquiries
  • Sign off at substantial completion
  • Certification to governmental authorities

16
The Differing Role of the Design Professional in
Design/Build
  • Design system by system
  • Eliminate Defensive Detailing
  • Investigate alternative designs
  • Delegating design duties to specialty
    subcontractors
  • Setting price constraints
  • Alter design sequencing
  • Maximize flexibility of design-build team

17
Questions?