Title: System Test and Installation
1System Test and Installation
- System test and installation in the SDLC
- Installation goals
- Design and perform the system test
- Install the components
- The user acceptance test
- Cutover
- The post-implementation evaluation
- Systems maintenance
- System test and installation management
- The future of the system
2System Test and Installation in the SDLC Fig
9.1 System Test and Installation Overview
3Installation Goals
- Meet design specs
- Meet cost constraints
- Meet time constraints
- Turn control over to capable users
4Design and Perform the Systems Test The
production staging environment
5Install the System Components
- Installation Schedule
- Tasks, person assigned to it, time schedule
- Installation procedures and controls
- To maintain data integrity and cross check the
old and new systems - Contingency plan
- Old or new system fails during conversion
- Timetable for dismantling old system
6Install the System Components Fig 9.3
Installation Plan Checklist
7The User Acceptance Test User acceptance form
8Cutover
9Post-Implementation Evaluation
- Post Implementation Report
- Generally 2-3 months after the cutover
- System Quality
- Project Management
- Organizational Relevance
10Evaluation Process
- Review Project Documents
- Old system, promised system, and the delivered
system - Plan the review
- Conduct interviews
- Prepare the report
- Submit the report to management
11Data Gathering Forms
- Project summary (Page 496Fig 9.6)
- Users evaluation (Page 498Fig 9.7)
- Developers evaluation (Page 500 Fig 9.8)
- Evaluation of project management (Page 501Fig
9.9) - Post-Implementation Report (Page 502 Fig 9.10)
12System maintenance
- System compatibility maintenance
- System efficiency and reliability maintenance
- Emergency needs and errors maintenance
- User enhancements maintenance
13Strategies for reducing system maintenance
- Eliminate unnecessary changes
- Define functional requirements right
- Build in flexibility, portability
- Thorough testing
- Thorough training
- Reduce effort of changes
- Thorough documentation
- CASE/Tools
14System Test and Installation Matrix
- System components
- Input, Processing, Output, Storage, Control
- Resources
- People, Data, Information, Hardware, software
- Matrix Components
- Meets functional requirements
- Facilities including equipment, fixtures,
supplies - Users manuals and procedures
- User training
- Technical manual procedures
15The Future of the System
- System dismantling
- Redevelopment
- Business process redesign (BPR)