Peabody Energy Corporation Project Thoroughbred Board Presentation - PowerPoint PPT Presentation

1 / 2
About This Presentation
Title:

Peabody Energy Corporation Project Thoroughbred Board Presentation

Description:

Collect and coordinate data for a new base case transmission planning study ... down 2004 Study Program 'realistic' resource scenario Work with SPGs and ... – PowerPoint PPT presentation

Number of Views:77
Avg rating:3.0/5.0
Slides: 3
Provided by: pea120
Category:

less

Transcript and Presenter's Notes

Title: Peabody Energy Corporation Project Thoroughbred Board Presentation


1
Joint Planning at the Regional and Sub-Regional
Levels
Northwest Transmission Assessment Committee
(NTAC)
SSG-WI West wide Planning
Rocky Mountain Area Transmission Study (RMATS)
WECC West wide Reliability
Southwest Transmission Expansion Plan (STEP)
Southwest Area Transmission (SWAT) Planning Group
2
SSG-WI
  • 2004 Work Plan
  • Database management Major role for SSG-WI
  • Review economic analysis and findings in 2003
    Study
  • Conduct workshops
  • Collect and coordinate data for a new base case
    transmission planning study
  • Transmission economic analysis
  • Modeling improvements
  • Conduct a scaled down 2004 Study Program
    realistic resource scenario Work with SPGs
    and CREPC in developing the base case scenario
  • Update historical path congestion analysis