Title: AMS02 Phase II Ground Safety Review
1AMS-02 Phase II Ground Safety Review
- CERN TIM July 21-25, 2008
- (Developed by Eric Harvey, AMS-02 Ground Safety
Engineer)
2AMS-02 Phase II Ground Safety Review
- When September 8th-10th, 2008
- Where Kennedy Space Center, Building OSB2, Room
5109 - OSB2 is located across from Vehicle Assembly
Building - web page http//centerops.ksc.nasa.gov/offices/mg
mtintoffice/OSBII/cr5109.htm
3AMS-02 Phase II Ground Safety Review
- Required Collaboration Members
- JSC Safety and Management Team
- Mark Sistilli
- Dieter Schenzel (CGSE)
- Robert Becker
- Corrado Gargiulo (GSE)
- Steve Harrison (Magnet System)
- Mike Capell (AMS Operations and Avionics)
- Marco Molina or Christian Vettore (Thermal
System) - Thorsten Siedenburg (TRD Gas System)
4AMS-02 Phase II Ground Safety Review
- Recommended attendance
- S Ting
- R Battiston
- J Berdugo
- K Luebelsmeyer
- G Laurenti
- J P Vialle
- J van Es
- M Aguilar
- C. Titus
- A. Lebedev
- G. Ambrosi
- F. Cadoux
5AMS-02 Phase II Ground Safety Review
- Critical Issues to be discussed
- Venting Analysis
- Flight hardware of concern to ground personnel
- Ground Operations
- Ground Support Equipment (GSE)
- CGSE
- TRD GSE
- GHE
- TCS GSE
- Electrical GSE
6Ground Safety Review Agenda
7Ground Safety Review Agenda
8Ground Safety Review Agenda
9Ground Safety Review Agenda
10Ground Safety Review Agenda
11Ground Safety Review Agenda
12Ground Safety Review Presentations
- Approximate times for each presentation are shown
on agenda. - Presentations should focus on Systems with
possible impact to ground safety, not flight or
mission aspects. - Coordinate all presentations with Ground Safety
Engineer, Eric Harvey - E-mail eric.harvey_at_escg.jacobs.com
- Phone 281-461-5509
- Draft presentations will need to be provided by
August 4, 2008. - Final presentations will need to be provided by
August 25, 2008 for reproduction and pre-meeting
data requirements.
13Ground Safety Review Issues
- AMS-02 has not yet developed the operational
procedures that will be utilized at KSC. - Responsibility and design of some ground support
equipment is still unclear - Warm Helium Supply
- CGSE operations at KSC
- Star Tracker GSE
- Thermal GSE
14AMS-02 Phase II Ground Safety Review
- Thanks to your support, the Ground Safety Data
Package has been well received at KSC. - We have also enjoyed excellent support from KSC
in preparation for this review. - Your participation is required and appreciated to
make the ground safety review a success!