Title: FIMS Data Validation Process
1FIMS Data Validation Process
- FIMS Workshop
- Wyndham Phoenix
- May 23-25, 2006
2FIMS Data Validation Process
- New initiative is underway to roll-out a standard
FIMS data validation process - Initial validation efforts to be focused on the
23 FRPC data elements. - Process based on the LMI validation model
developed for DOE in September 2004.
3Why Validate?
- Need for a statistically valid, DOE-wide quality
assurance program for data verification - Ensure data accuracy and a level of confidence
- Accurate real property inventory is a key
requirement of the Presidents Management Agenda
and is a DOE Scorecard item. - Need to ensure accuracy of all data being
reported to the Federal Real Property Profile. - Generate recommendations for continuous data
improvement - FIMS is used on a daily basis to make real
property management decisions
4FIMS Data Elements to be Validated
- Property Type
- Property Usage
- Owned/Ingrant
- Status
- Historical Designation
- Using Organization
- Gross Sqft
- RPV
- Deferred Maintenance
- Actual Maintenance
- Status Utilization
- Net Occupiable Sqft
- Mission Dependency
- Annual Operating Cost
- Main Location
- City
- State
- County
- Congressional District
- Zip Code
- Restrictions
5Process Outline
- Assemble the Validation Team
- Develop a Schedule
- Determine the Sample Size
- Randomly Select Buildings for Validation
- Identify Outliers to be Validated
- Conduct the In-brief Meeting
- Execute the Validation Process
- Develop the Scorecard
- Conduct the Out-brief Meeting
6Assembling the Validation Team
- Size of validation team will vary by site, but at
a minimum should include - FIMS Administrator
- Individual(s) who is familiar with the facilities
to be validated and the source documentation - DOE Site Office representative
- Third party, not associated with the site being
validated - Others may be rotated in and out of the team as
subject or facility experts
7Develop the Validation Schedule
- Several weeks prior to the validation
- Distribute the validation templates
- Schedule times for review and facility visits
that are convenient and efficient - Send site visit agenda, schedule, and discuss
required data/source documents with participants - Identify date that FIMS data will be extracted
for use in the validation - Within two days of the validation
- Extract FIMS data based on previously disclosed
date
8Determine Sample Size
9Determine Sample Size
- Randomly selected buildings that will be
validated based on the number of facilities at a
particular site and the confidence level you hope
to achieve - To achieve a 90 confidence level in the accuracy
of a particular data element, the following table
will assist you in determining the random sample
size
10Sample Size For 90 Confidence Level
11Generate Random Sample Set
12Random Building Generator
13Random Building Generator (contd)
14Random Building Generator Output
15Selecting Outliers
16Outliers
- Outliers are typically facilities that have high
RPV, Gross Sqft, or Deferred Maintenance cost
that were not selected as part of the random
selection of buildings but should be included in
the validation process. - Reinforces the level of confidence and accuracy
of the data
17Outlier Selection
18Outlier Selection (contd)
19Outlier Report Output
20Outliers to be Validated
21Outliers to be Validated (contd)
22Outliers to be Validated (contd)
23In-Brief Meeting
- Introduction of team members
- Establish Logistics
- Identify persons and systems required for access
at planned times - Identify location where the validation will occur
- Review validation schedule
- Set goals and discussion protocols
- Share facilities validation list
- Discuss Outliers to be validated
- Select facilities for walk-throughs
- Identify any initial issues
24Beginning the Validation Process
25Source Documents
- Source documents contain detailed comprehensive
site data that should be the accurate data of
record. - Can be a hard or soft document
- Information contained is authoritative, has an
owner and is used in the sites decision-making
process
26Source Documentation
- FIMS values must be validated against independent
source documents. Acceptable source documents
are - Signed construction drawings and blueprints
- As-built drawings
- Condition Assessment Reports
- Work order requests and work orders
- Databases maintained on site that are managed and
used for daily decision making by the data owner
(CAIS, Maximo) - Physical Measurements
- Internal memorandums/documented processes
- Official documented reports
27Source Documentation (contd)
- Questionable Source Documents
- Databases that are repositories of information
- Spreadsheets of compiled data
- Undated printout of information
- Interim or draft reports
- Design development drawings
28Source Documentation (contd)
- Site / Program Databases
- Site or program specific databases may or may not
be credible sources - Site or program specific databases are only
acceptable if they are a part of the management
decision making process - If these sources are used, they should be clearly
identified
29Validation Form
30Validation Form (contd)
- Identification Information
- HQ Program Office, Site, Area, Prop ID, Property
Name - Data Element
- Corresponds to the FIMS data element to be
validated - FIMS Value
- Contains the FIMS data value that was extracted
prior to the start of the validation process
31Validation Form (contd)
- Source
- Most recent source document for the data element
- Can also be a site database
- Year of Source
- Year source was created or last updated
- Automatically creates a variance if
- Older than 1 year for Status Utilization,
Deferred Maintenance, or RPV - Older than 5 years for condition assessment
survey - Value from Source
- Value from source document that corresponds to
the FIMS data element being validated
32Validation Form (contd)
- Variance (FIMS-Source)
- A percentage that is calculated based on errors
for all numeric fields - Numeric values are only considered in error when
the material variance is greater than 10 - Example FIMS Value Source Value / Source Value
- (28,000 gsft 25,000)/25,000 gsft 12 material
variance - Material Variance (Y/N)
- A value of Y if the numeric data element has a
material variance greater than 10 or other
non-numeric data elements were found to be in
error.
33Validation Form (contd)
- Most likely cause of variance
- When a material variance occurs, validation team
should identify the likely cause - Out of date, inaccurate, or incomplete sources
- Sources probably exist but cant be located
- No source documentation
- Multiple or conflicting sources
- Incorrectly calculated value
- Incorrectly entered value
- Additional Comments
- Space provided to document other observations or
issues - Further explanation of data sources and variances
34Evaluation and Reporting Variances
35Evaluation and Reporting Variances (contd)
- Total number of buildings with material variance
- Basically identifies the number of errors found
in the validation of a particular data element - Total number of buildings sampled
- Total Frequency of Material Variance (errors) at
a 90 confidence level - Indicates a percentage of buildings that will
have a material variance - Calculation No of buildings with material
variance/ Total no of buildings sampled - Example 4 buildings with error in gsft /25
sampled buildings 16 Frequency of Material
Variance
36Evaluation and Reporting Variances (contd)
37Walk-Throughs
- Although the validation is largely a paper
validation, it is critical for the validation
team to physically see some of the assets to
verify utilization, usage, and condition - This is not a condition assessment survey
- This process relies mainly on observation and
communication with building manager or other site
personnel - Beneficial to generate the FIMS complete
information report for all walk-through facilities
38Development of a Scorecard
- A Scorecard is developed at the conclusion of the
validation process. This is preferred over a
lengthy written report - Can be largely completed at the site
- Saves time and energy
- Focuses attention on the facts and findings
- Compact and conveys results quickly
- Aligns with OMB and Departmental scoring
39Scorecard (contd)
- Provides an overall rating of the FIMS data and a
rating by data element - Overall rating includes a score for status and
progress - Status A weighted roll-up of the findings per
data element - Progress Subjective recognition of improvement
40Scorecard (contd)
- A Scorecard is designed like a stop light chart
- Green Continue to do great things
- Yellow Proceed with caution
- Some defects noted but not deemed to be affecting
overall FIMS quality - There is an opportunity for improvement or at
least monitoring - Red Stop and address a problem
- Defects noted affected data quality
- Corrective Action Required
41Scorecard Sample
42Scorecard Rating Data Element
- At the data element level, ratings are assessed
based on error rate - Red - gt 10 or greater
- Yellow - Between 6 and less than 10
- Green - 5 or less
43Scorecard Rating Overall Status
- A site will receive an overall status of red if
one or more of the following critical data
elements is in red status - RPV
- Deferred Maintenance
- Actual Maintenance
- Status Utilization
- Mission Dependency
- Annual Operating Cost
- Or two of the remaining data elements are red in
status
44Scorecard Rating Overall Status
- An overall status rating of yellow is received
if - Any non-critical data elements are red
- Any critical data element is yellow
- RPV
- Deferred Maintenance
- Actual Maintenance
- Status Utilization
- Mission Dependency
- Annual Operating Cost
45Scorecard Rating Overall Status
- To obtain a green status rating
- No red data elements
- All critical data elements are green
- RPV
- Deferred Maintenance
- Actual Maintenance
- Status Utilization
- Mission Dependency
- Annual Operating Cost
46Scorecard Rating Progress
- A progress rating is important because the status
rating may not tell the entire story - Progress rating is more subjective and considers
- Statistical improvement since last validation
- Establishment/meeting the goals of a corrective
action plan - The progress rating is a leading indicator and a
way to indicate positive or negative momentum
that will yield status improvement or decline
47Scorecard Rating Progress
- Red indication that red status will not improve
or yellow status will decline. - Lack of attention and urgency
- Corrective action plan not being met
- Yellow Indication that limited, positive
efforts are being taken that may improve the data - Corrective action plan is in place but progress
is slipping - Green results-oriented plan in place with goals
and necessary resources - Clear level of attention and demonstrated sense
of urgency - Typically, a site that is green in status by
default is green in progress
48Out-brief Meeting
- Out-brief to Site Manager and Staff
- Present a Scorecard resulting from the validation
- Resolve any outstanding issues. If not resolved,
assign action items and completion dates. - Share recommendations for improvement and note
good and best practices - Disagreements
- Capture and document disagreements with
validation findings and recommendations for
results
49Measure of a Successful Validation
- Review/validate the randomly selected FIMS
building records along with the selected outliers - Generate either agreement (or documented
disagreement) why a specific data element in FIMS
is inaccurate - Walk through a number of random buildings (four
or five) and examine condition, use, and
utilization - Understand how FIMS data is being maintained and
managed - Document other notable facts and data
- Determine significant findings, highlight
successes, prepare a scorecard and generate
recommendations to address shortfalls and areas
for improvement
50Results of a Good Validation
51Results of a Bad Validation
52Retention of Information
- What should be kept
- FIMS random buildings set
- Reference to source documents used
- Completed validation templates
- Validation Scorecard
- Information should be retained for no less than
five years for the purposes of tracking and
trending.
53Data Validation Tips for Success
- Assemble the proper validation team
- Includes FIMS Administrator and subject matter
experts as well as DOE representation - In-brief Out-brief meetings
- Having good source documentation
- Documents containing detailed site data that
should be the accurate data of record - Can be a hard or soft document
- Information contained is authoritative, has an
owner and is used in decision-making
54Data Validation Guidance/Training
- Guidance forthcoming from the Office of
Engineering and Construction Management (MA-50).
- Guidance currently in draft form
- Planned to be signed out and distributed in FY06
- Goal is for full implementation in FY07
- Data Validation Training
- All FIMS Administrators and appropriate Site
Management should attend - Contact your HQ Program Office FIMS
representative to express interest in attending
55Questions/Discussion