Title: Revival Project Work Package 07


1
Revival Project -Work Package 07
Daneshill House Stevenage
Progress Report Seven Athens November 2006
2
REVIVAL STEVENAGE
  • Stevenage Work Packages
  • Night Cooling using thermal mass PCM
  • Partial Night Cooling using thermal mass PCM
  • Energy Efficient Lighting controls
  • Low Energy Lighting Controls
  • Solar Collection System for domestic hot water
  • Control Alterations to Existing AC Plant
  • Associated project works
  • Winter Ventilation to Old Block
  • Replacement of Under floor Electric Heating to
    Old Block
  • Overall aim to demonstrate Co2 reduction of 50
    compared to existing building.

3
REVIVAL STEVENAGE
  • Delivery Context of Stevenage Work Packages
  • The 14 Stevenage work packages are being
    delivered as part of Phased programme of
    refurbishment of an occupied public building.
  • They are part of 8 individual refurbishment
    projects with different funding and timescales.
  • The 8 projects have a total value of 2.35m
  • (3.3m Euros)
  • The Revival financial contribution is 48k
  • (67,000 Euros) 2

4
REVIVAL STEVENAGE
  • Update on Progress and Delivery Nov. 2006

5
REVIVAL STEVENAGE
  • Update on Progress and Delivery

6
REVIVAL STEVENAGE
Old Block Summer Cooling Energy Efficient
Lighting Works
  • Work on 3rd floor summer cooling lighting
    controls completed in August.

7
REVIVAL STEVENAGE
Old Block Summer Cooling with Night Ventilation
  • 3rd floor summer cooling with night ventilation
    covers area of 350m2
  • 48 Cooldeck plates installed fed by 24 ceiling
    fans
  • 96 pcm panels installed

8
3rd floor Night Cooling
9
(No Transcript)
10
(No Transcript)
11
REVIVAL STEVENAGE
  • Single CoolDeck plate with new format PCM
    Modules

96 pcm panels installed
12
Ceiling Inlet to Cooldeck
  • Night Ventilation fans for Cooldeck system

13
REVIVAL STEVENAGE
Mechanical Top Up Cooling Units
  • The new Squid top up mechanical cooling units
    are operational and were used towards the end of
    the summer period.
  • These units were also retrofitted to the 2nd and
    6th floors.
  • They are currently set to operate when internal
    temperature reaches 27Deg. C.
  • Design assumes around 200 hours operation per
    summer.

14
Squid Top Up Cooling Unit
Inlet
15
Squid Top Up Cooling Unit
Inlet Grille for Squid Mechanical Cooling Units
16
Squid Top Up Cooling Unit
Outlet ducts for Mechanical Cooling Units
discharge into ceiling void
Inlet Grille for Squid Mechanical Cooling Units
17
3rd floor Solar Occupancy lighting control
18
REVIVAL STEVENAGE
Lighting Controls
  • 3rd floor lighting to main open plan area is
    controlled by Solar sensors
  • The lighting in 2 meeting rooms and 2 offices
    are controlled by occupancy sensors.

19
Lighting Under Solar Control
Lighting Control Panel for Solar Sensors
20
REVIVAL STEVENAGE
Solar Water Heating
31 m2 of solar panels 35kw auxiliary gas boiler
21
REVIVAL STEVENAGE
  • Solar Water Heating
  • Existing Hot Water Cylinders could not be reused.
    Final design included for
  • New hot water cylinders
  • Installation of high efficiency gas boiler
  • ( installation costs considerably more than
    original budget)
  • Installation was completed in September 2006

22
(No Transcript)
23
(No Transcript)
24
(No Transcript)
25
REVIVAL STEVENAGE
Winter Ventilation to Old Block
  • To provide acceptable winter ventilation to the
    old block, a system of Co2 controlled radiators
    is being installed.
  • The system is called oXygen manufactured by
    Jaga of Belgium
  • 6 oXygen radiators have been installed as part
    of the 3rd floor project

26
REVIVAL STEVENAGE
  • System has Co2 controls and can also be used in
    summer to provide controlled ventilation within
    the passive cooled area

27
Two oXegen units within single Radiator
oXegen units are controlled through power
circuit (Laptop is part of control system will
allow detailed monitoring)
28
REVIVAL STEVENAGE
Problem Encountered in last reporting period
  • Solar Panels damaged in storm during installation

29
REVIVAL STEVENAGE
Problem Encountered in last reporting period
  • Serious Flood to 3rd floor 3 days after
    completion

30
REVIVAL STEVENAGE
Monitoring Evaluation Programme
  • Stevenage Monitoring Exercise aims to demonstrate
    improvements in energy performance against a
    target Co2 reduction of 50

Stevenage project will show efficiency
improvements both in terms of the buildings
-Energy performance -Space Utilisation
efficiency
31
REVIVAL STEVENAGE
  • Monitoring for 2007
  • Monitoring of all REVIVAL Elements will take
    place in 2007
  • As well as whole building consumption monitoring,
    Main Emphasis will be Comprehensive Monitoring of
    3rd Floor Old Block, including
  • Consumption Monitoring
  • Power to lighting office equipment
  • Power to Cooldeck, top up cooling, Oxegen units
  • Comfort Conditioning Monitoring
  • Temperature, RH, Internal Co2,

32
REVIVAL STEVENAGE
  • Monitoring for 2007
  • Area Usage monitoring
  • Sample monitoring of Actual occupancy levels
  • Actual periods of use
  • Sample Monitoring of Plant Equipment Operating
    Periods
  • Lighting (Summer Winter)
  • Cooldeck system (summer only)
  • Oxegen ventilation units (Summer Winter)
  • Cooldeck system Performance Monitoring
  • Full 12 point temperature monitoring to be
    repeated
  • PCM performance to be monitored with addition of
    Heat flux sensor

33
REVIVAL STEVANAGE
  • Monitoring Schematic for Old Block Night Cooling
    System
  • T8
  • T5
  • T9
  • T7
  • T4
  • Heat Flux Sensor
  • T6
  • H1
  • T3
  • T1
  • T2
  • H2

34
REVIVAL STEVENAGE
  • Monitoring for 2007
  • Solar Hot Water System Monitoring
  • Gas, Water Electricity consumption
  • ( individual meters for all elements have been
    installed in the boiler room)
  • Solar generation (KWH)
  • Whole building occupancy hours
  • Building a profile of hot water demand and
    assessing match to solar supply capacity

35
Summary of Monitoring Programme 2007
36
REVIVAL STEVENAGE
  • A significant Investment has been made in
    installing monitoring equipment including
    additions to central BEMS
  • Gas meter
  • Solar Heat Meter
  • Water Meter

37
REVIVAL STEVENAGE
Presentation of the Stevenage Monitoring Data
  • Emphasis will be on SIMPLE presentation of the
    data

38
Summary Area Information
39
Summary Energy Consumption Monitoring Table
40
Summary Energy Consumption Monitoring Table
41
Local Climate Monitoring
42
Local Climate Monitoring
43
REVIVAL STEVENAGE
  • Dissemination Activities in 2006
  • Presentation on site to West Angilain Energy
    Environment Group (WAEEG)
  • Article submitted to UK Construction Magazine
  • Official opening of Solar Hot Water System
  • Public presentation as part of Energy Week in
    Town Centre
  • Article in local paper

44
REVIVAL STEVENAGE
  • Recent Dissemination Activities

The Official Opening of the Solar hot Water System
Public Display During Energy Week
45
REVIVAL STEVENAGE
  • Dissemination Activities for 2007
  • Articles to be submitted to UK wide publications
    such as
  • Building Magazine
  • Building Design
  • PFM (Premises Facilities Management)
  • MBA (Modern Building Services)
  • Heating and Ventilating News
  • Building Services Environmental Engineer
  • Energy Institute Journal
  • Energy in Buildings Industry
  • Energy, Resource, Environmental and Sustainable
    Management
  • Article will be in Stevenage Chronical Mag.
    (Distributed to 33,000 homes)
  • Specific site visits to be arranged
  • Second Presentation on site to West Angilain
    Energy Environment Group (WAEEG)

46
Thank youany questions?