Revival Project Work Package 07 - PowerPoint PPT Presentation

1 / 30
About This Presentation
Title:

Revival Project Work Package 07

Description:

Solar Collection System for domestic hot water. Control Alterations to ... New solar water heating to include Gas auxiliary heater. Solar Water Heating. 67. 66 ... – PowerPoint PPT presentation

Number of Views:28
Avg rating:3.0/5.0
Slides: 31
Provided by: louis101
Category:

less

Transcript and Presenter's Notes

Title: Revival Project Work Package 07


1
Revival Project -Work Package 07
Daneshill House Stevenage
Progress Report Six Florence May 2006
2
REVIVAL STEVENAGE
  • Stevenage Work Packages
  • Night Cooling using thermal mass PCM
  • Partial Night Cooling using thermal mass PCM
  • Energy Efficient Lighting controls
  • Low Energy Lighting Controls
  • Solar Collection System for domestic hot water
  • Control Alterations to Existing AC Plant
  • Associated project works
  • Winter Ventilation to Old Block
  • Replacement of Under floor Electric Heating to
    Old Block
  • Overall aim to demonstrate Co2 reduction of 50
    compared to existing building.

3
REVIVAL STEVENAGE
  • Delivery Context of Stevenage Work Packages
  • The 14 Stevenage work packages are being
    delivered as part of Phased programme of
    refurbishment of an occupied public building.
  • They are part of 8 individual refurbishment
    projects with different funding and timescales.
  • The 8 projects have a total value of 2.35m
  • (3.3m Euros)
  • The Revival financial contribution is 48k
  • (67,000 Euros) 2

4
REVIVAL STEVENAGE
  • Update on Progress and Delivery May 2006

5
REVIVAL STEVENAGE
  • Update on Progress and Delivery

6
REVIVAL STEVENAGE
Problem Encountered in last reporting period
  • Tenders for current phase of works (including 4th
    floor new block) were 996k against budget
    available of 756k
  • Council decided to omit 5th floor old block from
    current phase of works.

7
REVIVAL STEVENAGE
  • Atrium Energy Efficient Controls
  • The control alterations to the ground first
    floor Atrium areas are now completed final
    commissioning under cooling load conditions will
    take place in May 2006.
  • Energy monitoring under the improved system will
    take place during summer 2006.

8
REVIVAL STEVENAGE
Old Block Summer Cooling Energy Efficient
Lighting Works
  • Work on 3rd floor summer cooling lighting
    controls will start on site in May 2006
  • Work will include the Squid top up mechanical
    cooling units.

9
3rd floor Night Cooling with Squid top up
mechanical cooling
10
CoolDeck Component Drawing
11
Squid Top Up Cooling Unit
Inlet
12
3rd floor Solar Occupancy lighting control
13
REVIVAL STEVENAGE
4th floor New Block Refurbishment
Direct comparison can be made with Night Cooling
areas
14
REVIVAL STEVENAGE
  • Solar Water Heating
  • Detailed design completed and scheme out to
    tender.
  • Vacuum tube type solar panels have been selected
  • Completion of installation due Summer 2006

15
REVIVAL STEVENAGE
  • Solar Water Heating
  • Existing water heating using 25.9MWh/year
  • Current emissions 11,148kg/CO2/year
  • New emissions 3,302kg (Reduction 66)
  • New solar water heating to include Gas auxiliary
    heater

16
Annual Costs and Savings Comparison
Table from MouchelParkman Feasibility Study
17
Installation Cost Comparison of Two Types of Panel
Table from MouchelParkman Feasibility Study
18
REVIVAL STEVENAGE
Solar Water Heating
  • Life Cycle Analysis Whole Life Cost

Table from MouchelParkman Feasibility Study
19
REVIVAL STEVENAGE
Solar Water Heating
31 m2 of solar panels 35kw auxiliary gas boiler
20
REVIVAL STEVENAGE
Winter Ventilation to Old Block
  • To provide acceptable winter ventilation to the
    old block, a system of Co2 controlled radiators
    is being installed.
  • The system is called oXygen manufactured by
    Jaga of Belgium
  • 6 radiators are being installed as part of the
    3rd floor project

21
REVIVAL STEVENAGE
  • System has Co2 controls and can also be used in
    summer to provide controlled ventilation within
    the passive cooled area

22
REVIVAL STEVENAGE
Phase Change Material Issues
  • Workshop held in November to discuss issue raised
    at London meeting over PCM service life.
  • Workshop looked at PCM sample from 6th floor with
    330 actives cycles since 2002

23
REVIVAL STEVENAGE
PCM Workshop Findings
  • No physical signs of change evident in the 2002
    installed samples examined
  • Future on site PCM temp. monitoring should be
    taken in middle of material. (New probe
    temperature sensor has been obtained tested)
  • 2002 samples require retesting off site.
    (Climator subsequently retested 2002 samples in
    factory) Independent testing needed
  • No definitive view was expressed over whether to
    use C24 or C22 in next phase.
  • (Goran Head considers the difference cannot be
    measured)

24
REVIVAL STEVENAGE
PCM Development
  • PCM manufacturing process has changed
  • Now smaller, vacuumed sealed packets
  • Increased capacity for same volume
  • Implications for CoolDeck System
  • Greater surface area airflow disruption which
    may improve efficiency
  • Two full plate PCM samples have been produced
    tested on 6th floor (some slight increase in
    system noise was evident)

25
REVIVAL STEVENAGE
  • Single CoolDeck plate with new format PCM
    Modules

26
Summary Energy Consumption Monitoring Table
27
Summary Energy Consumption Monitoring Table
28
REVIVAL STEVENAGE
  • Next Period of the Stevenage Project
  • Control Alterations to Existing AC Plant
  • Carry out the comisioning and commence monitoring
    of new control system
  • Solar Collection System for domestic hot water
    system
  • Place order for and complete the installation of
    the new solar hot system (complete with auxiliary
    gas boiler.

29
REVIVAL STEVENAGE
  • Next Period of the Stevenage Project
  • Passive Cooling to Old Block Areas
  • Complete the installation of a passive cooling
    system on third floor of the old block area.
  • Energy Efficient Lighting to Old Block Areas
  • Complete the installation of an energy efficient
    lighting system on third floor of the old block
    area.
  • Co2 Stock Analysis
  • Prepare consultants brief commission
    Consultant for Co2 Stock Analysis
  • Continue Monitoring Programme
  • Complete summary monitoring template
  • Temperature Power on 3rd floor Old Block
  • Atrium Temperature Power
  • Power monitoring to 4th floor new block
  • Repeat CoolDeck monitoring on 6th floor with
    probe in centre of PCM

30