Title: Waste to Energy
1Waste to Energy
Environmentally Safe Waste Disposal that
generates renewable and valuable energy sources
Steam ? Electricity
2- Parent Company to Montenay Inc.
- Worlds second largest Waste Services Company
- 71,000 employees in 34 countries
- Burnaby incinerator is one of three Waste to
Energy Plants in North America, the others are in
Pennsylvania and Miami
3Waste-to-Energy Facility (WTEF)
- Built in 1988
- Serves the Greater Vancouver Regional Districts
(GVRD) - WTEF burns about 20 of GVRD Garbage
- ISO 14001 certified
4EverydayIns Outs
- 720 tonnes of garbage
- 6 tonnes of lime (to control acid gas emission)
- 50 megawatt-hours of electricity
- 270 KG of ammonia (to control NOx emissions)
- 120 KG of activated carbon (to control mercury
emissions) - 1500 KG of phosphoric acid (added to stabilize
leachable metals in the fly ash)
- 960 tonnes of steam sold to nearby paper plant
- 360 megawatt-hours of electricity
- 120 tonnes of bottom ash (used in road building
and landfill cover) - 25 tonnes of fly ash (disposed at landfill)
- 20 tonnes of scrap metal (recycled into
reinforcing steel)
5THE PROCESS
6Looking UP ? Looking DOWN ?
Mountains of Garbage About 80 trucks a day haul
garbage collected in the GVRD to the 4,000 tonnes
refuse bunker. Completely contained within the
plant, no odours can escape.
7- Controlled by one or two men the Garbage is mixed
an lifted into the feed chutes. - Each of the 3 lines burn 10 tonnes of garbage an
hour. - Garbage moves down the grate where it burns at
temps of more than 1000 Celsius
8- Bottom ash amounts to about 17 per cent of the
waste that comes into the plant. - Metal is removed and recycled
- The remaining ash is used as an aggregate for
building roads
9- Heat and gases pass into the boiler area where
they heat tubes filled with water. - Water become steam in a process that cools the
gases. - These gases are then sent to the air pollution
control system - Gases are treated to remove acids, metals and
particulate matter. - Every process is carefully monitored by the
control room
10Cleaned gases are discharged through the 60 meter
high stack A portion of the steam produced is
sold to a paper mill that recycles paper products
to produce cardboard The steam produced is sent
to a turbo generator to create electricity for
sale to the BC Hydro electrical grid