1
Reliability Maintenance
Paul C. Czarapata
2
Maintenance Time
  • The following chart represents the amount of time
    spent on maintenance during a 168 hour week. IT
    DOES NOT REPRESENT TOTAL DOWNTIME. Some periods
    overlap each other where the chart treats them
    linearly. It also does not represent
    availability for the same reason.

3
(No Transcript)
4
Status Update
  • Items Presented to DOE review
  • Voltage to Frequency Converters
  • Part of Quench Protection System in Tevatron
  • Plan called for replacement of Low Beta House
    Systems
  • All cards replaced, All crates replaced, All
    sense resistors modified.
  • Plan expanded to include all VFCs in Tevatron

5
Status cont. 2
  • Overhaul Cryogenics Wet Engines
  • All overhauls are complete and should take us
    comfortably into the summer shutdown.
  • Cold Compressor Bearings
  • We have located an alternate source.
  • We have enough on hand but additional units are
    going to be ordered this FY.

6
Status cont. 3
  • Compressor Starters
  • Plan is to replace 2/3 this Fiscal Year 1/3 next
    year
  • First 1/3 are complete.
  • Second 1/3 will be done in Summer shutdown
  • Remainder will be ordered after October.

7
Status cont. 4
  • Other items are in process and showing good
    progress. We have handled the majority of the
    critical items.

8
Current Mysteries
  • Ground Motion
  • Traced to Domestic water well 1
  • Magnet Motion
  • Traced to bad Tevatron magnet stands
  • Kicker Pre-fires
  • Company says you have the best pre-fire rate of
    anyone using this configuration

9
Motion in MI-8 line
10
Newest Dilema
  • Magnet Stands are rusting away.
  • Evidence of motion with Humidity (rust jacking)
  • Evidence of motion with high current in magnets
  • (weebolls wobble but they dont fall down!)
  • Ed. Note weebolls were round bottom toys for
    small kids.

11
Tev Dipole Roll vs. I
12
Magnet motion vs. Quench and humidity
13
Magnet Stand in A16
14
Replacement of Stands
  • During the January shutdown we successfully
    replaced the A16-3 stand while the magnet was at
    nitrogen temperatures. The total number of
    stands needing replacement is now being cataloged
    for replacement when time is available.
  • We have placed additional tilt monitors in the
    Tevatron

15
And still more!
  • Linac Power Tubes
  • Use 7 per year
  • This was based on 10,000 hr lifetime (typical)
  • Have had two failures after 2,000 hrs.
  • Compete with other labs for tubes
  • Military no longer uses this tube so volume is
    down for vendor.
  • Thoriated cathodes were changed from 2 to 1.5
    due to OSHA difficulties.

16
Linac Tubes cont.
  • Coming out of the January shutdown we had a tube
    that was believed to be only marginally useful
    (25).
  • Two tubes due in February. Vendor says we will
    get 1 per month between now and August. We
    currently have Argonnes spare installed.

17
Vulnerabilities
  • A list of items (vulnerabilities) was generated
    August of 02.
  • These items would keep the lab down for at least
    3 months should they fail.
  • The list was prioritized by likelihood and
    forwarded to DOE by Steve Holmes.
  • The list represented 28.7M just in equipment.

18
Summary
  • We continue to battle an aging infrastructure for
    the machine components.
  • We will need high reliability and availability to
    meet the laboratories aggressive running
    schedule.
  • We will need increased funding to stay ahead of
    the problems.