Title: NSTX presentation
1NSTX
Supported by
NSTX Team Meeting
Culham Sci Ctr U St. Andrews York U Chubu U Fukui
U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu
Tokai U NIFS Niigata U U Tokyo JAEA Hebrew
U Ioffe Inst RRC Kurchatov Inst TRINITI KBSI KAIST
POSTECH ASIPP ENEA, Frascati CEA, Cadarache IPP,
Jülich IPP, Garching ASCR, Czech Rep U Quebec
College WM Colorado Sch Mines Columbia
U Comp-X General Atomics INEL Johns Hopkins
U LANL LLNL Lodestar MIT Nova Photonics New York
U Old Dominion U ORNL PPPL PSI Princeton U Purdue
U SNL Think Tank, Inc. UC Davis UC
Irvine UCLA UCSD U Colorado U Maryland U
Rochester U Washington U Wisconsin
December 4, 2008
2NSTX Team Meeting Agenda
Time 100 230, Place NSTX LSB 318, Dec. 4,
2008 General Items (30 minutes) Outage
Updates (30 minutes) Program items (30
minutes)
3Safely, Safely, Safely
- ESH Issues (J. Levine) -
- Heath/Safety is the foundation of what we do!
- NSTX Outage is coming to close soon. Please be
mindful of safety when you may be trying extra
hard to get ready for the run! - NSTX Operation is starting soon. Again, please
be as you enter the test cell. The radiation
requirement will change so please be ready with a
proper radiation badge and with appropriate
training completed. - The winter is fast approaching (if not here
already)! Be very careful with slippery surfaces
when you are outside. Do not forget to put salt
on your home walkways and driveways when frozen
condition occur! Keep yourself in good physics
condition through occasional light exercise.
4NSTX Upgrades
- NSTX preparing the mission needs (CD-0)
material for the NSTX major upgrade (new
Center-stack and the second NBI) for OFES/DOE - A visit to Germantown on Dec. 3, 2008 to give
an update on the NSTX upgrade CD-0 planning - OFES/DOE requested an NSTX upgrade CD-0 document
containing combined CS and NBI scopes at the
earliest possible time. - Draft Upgrade Schedule Aiming to be ready in
FY 13-14 (CD-4) - CD-0 (Mission needs) - ASAP FY 09
- CD-1 (CDR) - Late FY 09 (or early FY 10)
- CD-2 (PDR) - FY 10
- CD-3 (FDR) - FY 11
- Important points made
- Comprehensive up front design and RD for
realistic cost and schedule - Adequate cost and schedule contingency
- Identify risks early
5Modular design of NSTX enables removal of present
CS and replacement with a new higher-performance
CS
- Present CS has been removed and re-installed
several times for maintenance and modifications - New CS would have larger radius for increased
conductor area and toroidal field current, while
maintaining low aspect ratio A ? 1.5 - Construction tolerance requirements are similar
to present NSTX CS
Approximate outline of new Center-Stack
6Technical Risks
7An NBI heating system available from TFTR could
be moved to the NSTX test cell and installed
next to the present NBI
- PPPL has extensive experience operating,
maintaining, refurbishing NBI - NBI is well understood and has provided reliable
heating to high b values in NSTX
NSTX test cell
TFTR test cell
8Technical Risks
9NSTX Schedule
- NSTX FY 09 run of 14 run weeks will be
completed in June and resume operation in
late-Sept. / early Oct. time frame. - We will start the run in mid-Feb (Al, Mike
Bell). - Jon to issue a research planning guidance for
the FY 09 run and the first phase of the FY 10
run with LLD and BES for the research forum. - The 2009 summer outage period will be minimized
as much as possible to allow return to operation
with LLD, BES and MSE-LIF in later
September/early October. We will need everyone's
help and cooperation! - A realistic LLD/BES/MSE-LIF installation
schedule needs to be developed. - We will do minimum diagnostic calibration (only
those which are absolutely needed.)