Ball-Tech Energy Ltd. Present the BallTechnic System Air - PowerPoint PPT Presentation

1 / 24
About This Presentation
Title:

Ball-Tech Energy Ltd. Present the BallTechnic System Air

Description:

Ball-Tech Energy Ltd. Present the BallTechnic System Air Conditioning and Industrial Heat Exchangers Cleaning Systems A total solution for Air-Con ... – PowerPoint PPT presentation

Number of Views:157
Avg rating:3.0/5.0
Slides: 25
Provided by: balltech
Category:

less

Transcript and Presenter's Notes

Title: Ball-Tech Energy Ltd. Present the BallTechnic System Air


1
Ball-Tech Energy Ltd. Present the BallTechnic
System
  • Air Conditioning and Industrial Heat Exchangers
    Cleaning Systems
  •  
  •  

2
Ball-Tech Energy
Ltd. Established in 1989 as an RD
company.? Reorganized in 1994 with new
investment and management.specializes in the
field of water treatment. Main product line The
BallTechnic System. Patented throughout the
world.? Installed in air conditioning or
industrial water piping. Keep heat exchanger
tubes permanently clean. ? Enables heat
exchanger nonstop operation at its optimum
design condition.? Over 1700 Installations in
Israel, Italy, France, Mexico, S. Africa
Thailand, India, Malaysia, Singapore, China,
Hong Kong and the Philippines
Located in
the modern Industrial Park in Rosh Haain,
Israel.
3
A total solution for Air-Con.
Industrial cooling systems Scale Fouling and
its Environmental problems.
4
The Problem
  • Keeping Air Conditioning Systems in Full Capacity
    Efficiency
  • The Solution
  • Keeping the Heat Exchanger Tubes Always Clean

5
Central Air-conditioning System -Block Diagram
COMPLETE COOLING CYCLE
6
The Problem
  • Cooling capacity of The majority of medium to
    large central air conditioning systems are
    designed around a re-circulating open water
    cooling systems.
  • Water flow in the tubes of Shell Tube heat
    exchanger and remove the heat from the coolant
    gas.
  • Water contains low solubility salts and sediments
    that deposit and build a stony scale on the inner
    tubes surfaces, causing fouling of the heat
    exchanger unit.
  • Fouling of the heat exchanger unit is causing
    reduction of the Air Conditioning C.O.P
  • 1mm of scale can be deposited in 2000 hours of
    operation.
  • 1mm scale reduces the the system by 45

7
What is Causing Fouling? Why? How Fast ?
  • Water contain minerals of Magnesium and
    Calcium that tend to deposit on hot surfaces.
  • Scale, fouling sediments can be found after
    100-200 operation hours


8
Coefficient of Performance (COP) of A/C systems
Cooling Rate of A/C Systems T.R
C.O.P
Electrical power required to generate above T.R
9
The Problem
  • Accumulation of stony deposits on the tube inner
    wall has a heat insulating effect that results
    in
  • ? Reduction of system C.O.P and overall capacity
  • ? Lower C.O.P requires extra installed
    capacity- resulting in higher
    installation cost
  • ? Lower C.O.P means higher electricity
    consumption and
  • maintenance costs.
  • A/C system stoppage due to compressor high head
    pressure.

10
The Effect of Scale on A/C Performance




11
Current Design Consideration to Compensate
Fouling
  • Add more capacity per unit
  • Add units as backup during disassembly and
    cleaning
  • Current Operational Consideration to Compensate
    Fouling
  • Use more electricity for the required cooling
  • Operate another system earlier
  • Special maintenance to disassemble and clean the
    heat
  • exchanger

12

13
Keeping Heat Exchanging Tubes Always Clean
Existing Solutions
  • Chemical cleaning by acids.
  • Shutting down and chemical-acid cleaning of
    the heat exchanger tubes.
  • Frequent mechanical disassembly and acid
    cleaning of the heat
  • exchanger tubes require excessive maintenance
    time.
  • Acid can damage the tubes and the system.
  • An additional backup unit is required to provide
    cooling while
  • cleaning the system.
  • Loss of production and cooling for days.
  • Environmental problems due to the disposal of
    the chemicals.

14
  • Ball Tech system
  • It is an hydro-mechanical system,
  • circulate Sponge Balls through condenser's tubes
    and keep them permanently clean.

15
Ball Tech system installation
16
Ball Tech system Cleaning Concept
  • Features
  • The system injects and collects the soft balls
    in seconds
  • 100 reliable system
  • Inject and Clean the tubes every 40 min
    (adjustable) totally
  • avoids scale
  • The Sponge Balls made of natural rubber with
    special wear resistance
  • additives
  • The sponge ballls diameter is 1 mm larger
    than that of the heat
  • exchanger inner tubes diameter..
  • Sponge Balls and condense water specific
    weight are identical.
  • Sponge Ball has Excellent Flexibility
  • The sponge balls enter and moves through the
    heat exchanger tubes by
  • the water flow
  • The sponge balls wipe off the inner tubes
    walls without disturbing the
  • condense water flow.
  • Balls replacements - Every 1500 Hrs of the
    chiller works.

17
Ball Tech system installation
18
Ball Tech Injector and Sponge Ball rinsing
19
Ball Tech system advantages
  • It is a simple, reliable hydro-mechanical system.
  • It keeps heat exchangers tubes permanently and
    absolutely clean.
  • It is simple to install and requires no
    modification to the heat exchanger.
  • The ball flow does not disturb the condense water
    flow.
  • It does not impair environmental quality.
  • It preserves heat exchangers C.O.P. as designed
    by the manufacturer.

20
  • Saving on Air-conditionings energy consumption
    about 15 and more.
  • Reduce maintenance and chemicals cost.
  • It is one-time investment recoverable within one
    year.
  • It prevents accelerated chillers compressor
    wear.
  • Clean and simple procedures for supervision by
    any maintenance technician.

21
  • Patent Protection
  • Ball-Tech Energy Ltd. has patented its
    BallTechnic System products throughout the world
  •  
  • Patents No
  • ? US 5176204
    Israel 96802
  • ? US 5176204
    Israel 94289
  • ? US 5086833
    Israel 79885
  • ? US 4865121
    Europe 0-417-332-B1
  • Patents Applications in the following countries
  • Israel
    Japan
  • USA
    China
  • Mexico
    Singapore
  • S. Africa
    Thailand
  • Europe
    Australia

22
The Thermodynamic Cycle P-H Graph
23
Calculation of Cleaning Reliability
  • The BallTechnic system is using 30 balls for
    every 100 tubes in a pass (30 of the counted
    tubes)
  • ? Can this ratio clean all the tubes?
  • ? Yes, with 99.999.... reliability
  • Some simple probability calculations
  • ? The chance of a ball not to pass through a
    specific
  • tube is 0.7
  • ? There are, however, about 40 cleaning cycle in
    24Hrs
  • and deposits are formed within 200 Hrs.
  • ? The probability of a ball not to clean a tube
    is reduced
  • over 24 Hrs. at the power of 40 is
  • (0.7)40 6.3 10-7 0.00000063
  • Conclusion cleaning reliability of every tube
    is proved.
  • Field experience Unnecessary disassembly of the
    heat
  • exchangers of systems equipped with BallTechnic
    shows 100 clean tubes with no exception

24
Ball Transfer Force
  • Balls specific gravity is the same as water
  • Ball diameter is 1 mm larger than tube diameter
  • Pressure drop on tube is at least 1 meter (0.1
    bar) per pas
  • Example
  • A 20 mm tube diameter, with 0.1bar (1 meter)
    pressure difference per pass
  • The force that pushes the ball through the tube
    is
  • 0.1 bar x (3.14x22 cm)/4 0.315 Kg
  • This pressure is much higher than is required to
    push the sponge ball through the tube.
Write a Comment