Title: CEEG PV business
1CEEG PV business
2CEEG
- 1994 Transformer Industry
- 2004 PV Industry
- Four sites in China, headquarter is located
in Nanjing city - Over 5000 staffs
Structure
3Founder of CEEG
Mr. Lu Tingxiu President of CEEG Group Chairman
of the China Sunergy President of Semicon
Industry President of CEEG transformer business
- He takes charge of development and production of
59 national high and new technology products, and
develops 4 major kinds, 26 items of high and new
technology new industries with high capacity to
earn money, such as microwave carbon tester,
DuPont NOMEX insulation technology dry-type
transformer, high temperature resistant
liquid-immersed power transformer, high efficient
and low cost solar cells and so on. - He leads the CEEG RD and Management group,
cooperates with DuPont to initially develop and
design many hi-tech pilot products, such as SG
series of dry-type transformer, SRN high
temperature resistant transformer, and KBSG mine
explosion-proof transformer, etc. It takes 4
years to reach and exceed 40 years' technical
level of international products of the same kind,
so as to push technical upgrade of the
traditional industry.
4Leader
- Mr. Stephen Cai , CEO of CEEG PV BUSINESS. He
joined CEEG in January 2007 ,bringing more than
20 years international experience in sales,
marketing and management, Prior to joining CEEG,
Stephen has worked in DUPONT for more than 15
years, in a variety of senior management roles.
general manager of department - Mr. Cai is the owner of CEEG shanghai, a
subsidiary of CEEG Group, He led CEEG overseas
sales team, make inroads into the Europe market
,and occupy the a considerable mainstream market
share there.He proposed photovoltaic industry
integration strategy early in 2008. In April
2008,he formally began to put forward the process
of photovoltaic integration strategy. - Mr. Cai plan to invest overse power plant
projects in 2009
Mr. Stephen Cai Deputy-president of CEEG
Group CEO of CEEG PV BUSINESS President of CEEG (
ITALY) President of CEEG (UK)
5Leader
Dr. Zhao Jianhua CTO of China Sunergy
- Dr. Zhao Jianhua came from NSWU Solar Science
Research Centre. He is dedicated to the research
and promotion of high performance silicon solar
cell. - Dr. Zhao keeps the world silicon cell (mono)
conversion efficiency record of 24.6. - Develop the SE Cells in Commercial productions.
(Average efficiency will be above17.2 from 2008) - Cooperate with Sunpower to develop the n-type
Cells (Average efficiency will be above 19.3),
Commercial productions will begin at shanghai
December 2009. - (Source www.chinasunergy.com)
6CEEG DEVELOPMENT
7- May.2007, China Sunergy (CSUN) is listed in
NASDAQ.
8Characteristics
SE solar cell High conversion efficiency,
(17-18.5) High reliability Excellent
performance under low lighting Low mismatch of
cell performance during encapsulation Low reverse
current Low hot spot effect Low degradation
under light exposure SE Modules High
reliability High conversion efficiency Excellent
low-light performance Preventing damages by hot
spot effect Safe and reliable cables and
connectors Output power is 8-10 higher than
common panels
9Time flow for 2-4MW panels at present
Agreement
Selection
Testing
Packing Storage
Delivery on Board
Payment advance
Purchasing
Production
Sorting
Transport
Time 25-30 days including weekends
10Testing, Sorting and Package
- Manual and vision check
- SPI flashing testing equipment
- Material durability testing facilities
- Tolerance below 1
- Tolerance 1-1.5
- Tolerance 1.5-3
- Pallet box, 20-35 panels / pallet
- eg. 602 panels/40 container
- 840 panels/40 container 490
panels/40 container
11Warranty and Service
Warranty - for product warranty, free from
defects in material workmanship 5 years -
for power performance of more than 90 of nominal
power 10 years - for power performance of more
than 80 of nominal power 25 years After
Service -An experienced technical group ready
for oversea direction, assistance and problem
solving in MAR 2010 -A warehouse with 3
containers solar modules in Milan, Italy,
accomplish the replacement within 3 business
days. -A amount of solar cells stored in the
factory, ready for emergency.
12Strategic Partners
13 14- Location Puglia, Italy
- Module type 180W-Mono (SE)
- System size 4.3MWp
- System type Ground-Mounted
One of the biggest ground-mounted PV projects in
Italy, with a total capacity of 4.3 MW, and
financial support from Interbanca, will be
completed by July 2009. CEEG has the honor to
provide the high efficiency SE solar modules,
helping our customer to maximize their power
plants output to up to 7.5 GWH per year.
15- Location Pordenone, Italy
- Module type 165-72M
- System size 50KWp
- System type rooftop
16- Location Jindrichuv Hradec, Czech Republic
- Module type 210W, Multi
- System size 2.5MWp
- System type Ground-Mounted
Completed in Nov 2008, the biggest PV project in
the Czech Republic. The entire 1.5 MW of 210W
Multi-Crystalline solar modules were provided by
CEEG. This project was financially supported by
CSOB, one of the biggest banks in the Czech
Republic.
17- Location Rimini, Italy
- Module type 170-72M
- System size 308KWp
- System type rooftop
One of the biggest PV commercial rooftop projects
in Italy Completed in June 2008
18- Location Germany
- Module type 170W, Mono
- System size 100KWp
- System Type Rooftop
19- Location Ravenna, Italy
- Module type 170-72M
- System size 50KWp
- System type industrial rooftop
20Workshop of CEEG SST
21(No Transcript)