Preparing for a Successful - PowerPoint PPT Presentation

1 / 65
About This Presentation
Title:

Preparing for a Successful

Description:

Preparing for a Successful R7 Migration Ruth Pharr CISTECH, Inc. * * * * * IMPORTANT: P and L in PowerLink must be CAPS * Log on to iSeries XA environment * Log on to ... – PowerPoint PPT presentation

Number of Views:163
Avg rating:3.0/5.0
Slides: 66
Provided by: cistechNe
Category:

less

Transcript and Presenter's Notes

Title: Preparing for a Successful


1
Preparing for a Successful R7 Migration Ruth
Pharr CISTECH, Inc.
2
Session Objectives
Part 1 - Planning and Preparation Gain an
understanding of the planning and preparation
tasks to implement R7, including initial server
installation and migration. Part 2 - Client
Architecture Implementation Discuss the
requirements and review the process for
implementing the R7 Power Architecture including
Link Manager, Power Link and Net Link.
3
Agenda
  • R7 Requirements
  • Technical Planning
  • Installation and Migration
  • Integration and Testing
  • Go-Live and Support
  • Helpful Resources
  • Summary

4
R7 Requirements
  • iSeries Requirements
  • Minimum OS/400 release for R7 is V5R2
  • Latest iSeries fixes (V5R4)
  • SF99540 Latest cumulative package
  • SF99504 Database PTFs
  • SF99539 Group Hipers
  • SF99369 Java PTFs

5
R7 Requirements
  • XA Requirements
  • RPG Compiler (for migration tools)
  • XAR6 client must be at level 17 or higher or
    conversion will not work
  • User definitions
  • Integrator customizations

6
Technical Planning
  • R7 Online Questionnaire
  • http//support.mapics.com/r7orderhm.htm
  • Required to order R7
  • Can your iSeries run R7 clients
  • Ensure successful implementation
  • Current system configuration
  • 5250 users and Power users
  • Typical PC configuration
  • Will you need help

7
Technical Planning
8
Technical Planning
  • Infor and your affiliate will work with you to
    verify that your machine will handle new
    requirements for Java applications (Power
    Architecture)
  • Collect performance data
  • Use capacity planning tools to determine if
    hardware upgrades are recommended
  • Perform upgrades in advance
  • Customers who approach R7 implementation this way
    achieve better results.

9
Technical Planning
  • Create custom R7 checklist based on your path
  • CISTECHs template Excel Worksheet
  • Update with latest information from Infor
    documentation
  • Assign responsibilities and target dates
  • Manage your implementation effort
  • Not intended to be used as a complete
    step-by-step guide

10
  • Questions
  • on R7 Requirements
  • or Technical Planning?

11
Technical Planning
  • Five Phases
  • Planning and Preparation
  • Initial Install and Test Migration
  • Integration, Tuning and User Training
  • Final Migration and Go-Live
  • Post-Migration Support

12
Technical Planning
  • 1. Planning and Preparation
  • Review R7 application changes
  • SH14411 Technical Newsletter
  • Review R7 Upgrade information
  • SH14412 Technical Planning Guide
  • SH14413 R7 Install/Upgrade Guide
  • SH15308 R6 to R7 Migration Steps
  • Check Third-Party Applications
  • Analyze changes to custom code

13
Installation and Migration
  • 2. Initial Install and Test Migration
  • Enter keys
  • Perform initial installation (CAS)
  • Install applications that will be migrated to R7
    and run tailoring
  • Apply latest PCMs
  • Download and apply migration fixes
  • Run migration process

14
Installation and Migration
  • XAR6 to XAR7 Migration Example
  • XAR6 - apply SH14057 and activate new Security
    Areas to be migrated to R7 (one time)
  • Same applications installed in the from and to
    environments
  • Install any new applications in a duplicate
    environment for testing and training
  • Verify migration was successful
  • View migration report MIGRnR7P
  • (n your current release)

15
Installation and Migration
16
Installation and Migration
17
Installation and Migration
Date 2/02/06 Time 92414
File Migration Report Listing
MIGR6R7P
THE MIGRATIONS WERE SUCCESSFUL FOR ALL OTHER
INSTALLED APPLICATIONS
END OF REPORT
18
Integration and Testing
  • 3. Integration, Tuning and User Training
  • Integrate R7 with custom code
  • CISTECHs Upgrade Assistant
  • Minimize effort and cost
  • Minimize risk
  • Tune the environment (clients)
  • Conduct User Training

19
  • Questions
  • on R7 Migration
  • or Integration?

20
Go-Live and Support
  • 4. Final Migration and Go-Live
  • Download and apply latest migration tool fixes
  • Run migration process again
  • 5. Post-Migration Support
  • User Support
  • Download/apply PTFs as needed
  • Client Tuning

21
Helpful Resources
  • Contact CISTECH or your affiliate for help with
  • Planning for R7
  • iSeries Upgrades
  • R7 Installation and migration
  • User Training for R7 applications
  • Integrate your custom code using Upgrade
    Assistant
  • Performance analysis and tuning
  • Training for IT Personnel

22
Summary
  • R7 requires extra planning, particularly with the
    client applications
  • Minimum OS Release is V5R2
  • R7 server installation has not changed
  • R7 migration supported for R4, R5 R6
  • You have resources and tools to help you succeed

23
R7 Implementation Java Architecture
Implementation
24
Agenda
  • R7 Requirements
  • Host and Network Configuration
  • R7 Java Architecture
  • Client Installation
  • Performance Considerations
  • Summary

25
R7 Requirements
  • IT Skills Needed
  • Familiar with iSeries Integrated File System
    (IFS)
  • Experience configuring TCP/IP on the iSeries
  • Basic networking skills
  • Understanding of iSeries Database (for tuning
    clients by creating logical files)

26
Technical Planning
  • Infor and your affiliate will work with you to
    verify that your machine will handle new
    requirements for Java applications (Browser
    Architecture)
  • Collect performance data
  • Use capacity planning tools to determine if
    hardware upgrades are recommended
  • Perform upgrades in advance
  • Customers who approach R7 implementation this way
    achieve better results.

27
R7 Requirements
  • iSeries Requirements
  • 5722JC1 Toolbox for Java
  • 5722JV1 Java Developer Kit Options
  • BASE Developer Kit for Java
  • Java Developer Kit 1.4
  • OS400 (5722SS1) Option 30 QSHELL
  • 5722TC1 TCP/IP Connectivity Utilities
  • Latest iSeries Java PTFs from IBM
  • Latest iSeries Cumulative Package

28
R7 Requirements
  • PC Requirements (Recommended)
  • OS Windows
  • Memory 512 (256 MB free)
  • better 1GB (512 MB free)
  • Processor Pentium II 400
  • Disk 20 GB (200 MB free)
  • Display XGA
  • Resolution 1024x768
  • Internet Browser with Java enabled

29
  • Questions
  • On
  • R7 Requirements?

30
Host Configuration
  • iSeries Configuration Requirements
  • Domain Entry for host to participate on the
    network
  • Host Table Entry for identifying the host
  • Configure Netserver to view IFS directories

31
Host Configuration
CFGTCP Option 12
32
Host Configuration
CFGTCP Option 10
33
Network Configuration
  • Network Configuration Requirements
  • Domain Name Services (DNS)
  • Must be able to ping using host names
  • From iSeries to the PC
  • From PC to iSeries
  • Create a share to MAPICS directory in the IFS

34
  • Questions
  • On
  • Configuration?

35
R7 Java Architecture
  • LinkManager
  • Management and maintenance for client environment
  • PowerLink
  • Browser with new look and feel
  • Internal LAN only
  • NetLink
  • Thin client
  • Internet Access

36
Client Installation
  • SH14777 (download from EInfo)
  • Installation Guide for R7 Clients
  • LinkManager User Guide
  • New Features at latest fix level
  • Install IFS Client Objects from CD (SH14608)
  • Restore server objects to the AMXLIBx library
  • Initialize IFS for the environment
  • Sign on to environment as QSECOFR
  • Enter the XA environment to be installed
  • Key INZIFS on command line
  • Enter to accept English as default help text

37
R7 Java Architecture
  • iSeries IFS Environment
  • Folders created in IFS when you run environment
    initialization
  • \\hostname\root\MAPICS\AMALIBx
  • (xapplication designator)
  • Contain Java applications (.jar files)
  • Client configuration stored here
  • Fixes for clients are placed in IFS for download
    and applying to clients at login

38
R7 Java Architecture
XA R7 Environments R7, RE, ZC, and ZB
39
R7 Java Architecture
To manually create a new environment from an
existing one, you run an XA command to copy
folders and restart all the Java Server Jobs
refer to EInfo knowledge base
XA R7 Environments R7, RE and RV
40
Client Installation
  • Start the Global Environment
  • Log on to iSeries
  • Start Global Environment
  • PSICTLUJB ENV(xy) UJOB(PSVJUP) OPTION(GLOBAL)
  • (xy) is the environment designator
  • WAIT for the two jobs in QUSRWRK to reach JVAW
    status
  • MPXREGSRV
  • MPXMGRSRV
  • IMPORTANT Do not start U-jobs for environment
    until instructed to do so in the installation
    guide

41
Client Installation
42
Client Installation
  • Install Java Runtime Environment
  • Java Runtime 1.4.2 is required
  • Remove previous versions using Add/Remove
    Programs before installing
  • Installed only once per PC
  • Navigate to URL for LinkManager or PowerLink
    installation (in next slides)
  • Click on Java Runtime Environment 1.4.2 in the
    Title to begin installation
  • Follow prompts and accept certificates

43
Client Installation
Click
44
Client Installation
  • Install LinkManager
  • Only IT Personnel PCs or a server
  • Open your web browser
  • Navigate to this address
  • Http//ltlthostgtgt.ltltdomaingtgt36001/LinkManager/
  • (host) is the name of your iSeries
  • (domain) is the name of your domain
  • Click on Infor XA Link Manager in the title to
    begin installation
  • Follow prompts and accept certificates

45
Client Installation
Click
46
Client Installation
47
Client Installation
48
Client Installation
  • Install PowerLink
  • Apply client fix package before initial
    installation of PowerLink
  • SH14855 (look for future session on PTFs)
  • Start U-Job for MAPICS Java Server in the desired
    environment
  • PSICTLUJB ENV(xy) UJOB(PSVJUP) REQUEST(START)
  • OR Start the PSVJUP U-Job in CAS
  • NOTE Conversion of User Definitions and
    Integrator Business Objects will occur the first
    time you start the U-Job for the environment
    (after a data migration)
  • Wait for U-Job to become active

49
Client Installation
PSVJUP is active
Active Job is in DEQW status
50
Client Installation
  • Install PowerLink
  • Navigate to this address
  • Http//ltlthostgtgt.ltltdomaingtgt36001/PowerLink/xy
  • (host) is the name of your iSeries
  • (domain) is the name of your domain
  • (xy) is the designator for the R7 environment
  • Click on Infor XA Power-Link R7 in the title to
    begin installation
  • Follow prompts and accept certificates

51
Client Installation
Click
52
Client Installation
53
Client Installation
54
Client Installation
55
  • Questions
  • On
  • Client Installation?

56
Client Installation
  • Install NetLink
  • NOTHING TO INSTALL
  • Web Browser Access over Internet
  • Navigate to this address
  • Http//ltlthostgtgt.ltltdomaingtgt36001/NetLink/
  • (host) is the name of your iSeries
  • (domain) is the name of your domain

57
Client Installation
58
Client Installation
59
Client Installation
  • NetLink vs. PowerLink
  • Create, Change, Copy and Delete actions are
    supported in both
  • The following are available only in PowerLink
  • Mass actions (Mass change, mass delete)
  • Quick Change, Compare, Host Print and Host Jobs
  • Wizards (MO close, Create PO from requisition,
    Check Component Availability)

60
Performance
  • Performance Considerations
  • Logicals for faster data access
  • Apply latest Database PTF package from IBM
  • Switches vs. Hubs
  • Network traffic Performance Assessment
  • iSeries Performance configuration
  • Meet recommended PC requirements
  • Auxiliary Servers for NetLink and SystemLink
  • Response Time depends
  • on your network and PC configuration
  • more than ever before

61
Performance
  • iSeries Performance Configuration (SH14413)
  • MAXACT for BASE pool (WRKSYSSTS) - start high,
    adjust as needed
  • System Values
  • QACTJOB 400
  • QADLTOTJ 50
  • QMAXACTLVL NOMAX
  • QPRCMLTTSK 1
  • QTOTJOB 1000
  • QUTCOFFSET Offset for your time zone

62
Performance
  • iSeries Performance Configuration (SH14413)
  • Prestart Jobs set maximum usage to 1
  • CHGPJE SBSD(QSYS/sbsd) PGM(QSYS/pgm) MAXUSE(1)
  • SBSD PGM
  • QUSRWRK QZDASOINIT
  • QUSRWRK QZRCSRVS
  • QSERVER QZDAINIT
  • QSERVER QPWFSERVSO

63
Helpful Resources
  • Contact CISTECH or your affiliate for help with
  • Planning for R7
  • iSeries Upgrades
  • R7 Installation and migration
  • User Training for R7 applications
  • Integrate your custom code using Upgrade
    Assistant
  • Performance analysis and tuning
  • Training for IT Personnel

64
Summary
  • R7 Power Architecture has more hardware resource
    considerations
  • LinkManager provides maintenance and
    administration to application servers
  • PowerLink has replaced the Browser
  • NetLink should be installed on an auxiliary
    server for best performance

65
Thank You!
  • Technical Information
  • Ruth Pharr Belinda Daub
  • ruth.pharr_at_cistech.net belinda.daub_at_cistech.
    net
  • 704-814-0007 704-814-0004
  • Sales Information
  • Mike Taylor
  • mike.Taylor_at_cistech.net
  • 423-266-3011
Write a Comment
User Comments (0)
About PowerShow.com