Engineering Consultancy - PowerPoint PPT Presentation

About This Presentation
Title:

Engineering Consultancy

Description:

Seward Wyon- Engineering Consultancy and Mechanical design, Port and Marine Crane Refurbishment, Crane Maintenance, Heavy Lifting Equipment.log on :-Url :- – PowerPoint PPT presentation

Number of Views:1018

less

Transcript and Presenter's Notes

Title: Engineering Consultancy


1
WELCOME
  • Seward Wyon
  • The Old TanneryKelston, BathBA1 9AN
  • Tel 44 (0) 117 932 7565
  • Fax 44 (0) 117 932 7763
  • Email info_at_sewardwyon.co.uk

2
  • A guide to Install and maintain a Machine
  • Any instrument made to reduce the work effort of
    a human being is a Machine.
  • Like how for the better existence of a building,
    laying a strong foundation is the most important
    part, similarly for proper functioning and
    performance of a machine, its installation and
    further maintenance is very important .
  • Installation of a Machine
  • The Support Structure (Foundation)-The base must
    be in a position to handle the load of the heavy
    machine that can be made of iron without any
    problems that is abnormal shaking, too close to
    any other machine allowing clashing, creating
    strong vibrations that can create risk.
  • J-Bolts Strong bolts fix the machine to the
    foundation very firmly and strongly. When
    concrete is poured to the surface, these bolts
    are fixed so that they grip on to the base as
    strongly as a one could imagine.

3
  • Remoteness Energy created by one machine should
    at any cost not disrupt the functioning of the
    other machine. Thus sufficient gap should be
    provided between machines and the foundation of
    the machine should be such that it is able to
    absorb the vibration created by itself.
  • Alignment- To avoid any work stoppage or
    accidents due to improper alignment, at the
    initial stages itself a machine should be check
    for proper alignment. Experts in this area would
    play a vital role in checking if this is done
    well. There is equipment made for the purpose of
    proper alignment which an alignment crew would
    use.
  • Environment- EvenEiffel tower increases its
    height by 15 inches during summer. Machines are
    affected to a large extent due to sunlight, a
    minor earth quake far away disrupting the
    alignment of the machine, draught conditions,
    strong vibrations etc.

4
(No Transcript)
5
  • Maintaining a Machine
  • A two wheeler would not function well if not
    properly serviced a Machine is not exception to
    repair and maintenance.
  • Types of maintenance
  • Before actual repair- Prevention is always better
    than cure. A time line should be decided by the
    management of the company to ensure that proper
    checks are made to make sure the machines are in
    good condition.
  • Necessary oiling, cleaning, checking for any
    leakage, checking the alignment of the machine,
    checking the vibration absorption capacity of the
    machine, checking for the nuts bolts to be
    properly fixed etc. should be done at least every
    6-9 months.

6
  • After the failure A breakdown, stoppage of work
    would invite unplanned repairs and checks. This
    are generally more cost and time consuming for
    the company as first the defect has to be
    identified and then the repair work has to start.
  • In cases where the size of the equipment is very
    huge or is very critical, softwareare maintained
    to ensure the timely maintenance of the machine.
  •  
  • Machines where/are created to help reduce humans
    effort. It should be made sure that they do only
    that is in no way creating any threat to the
    society, whether its due to release of toxins in
    the air, due to improper maintenance or accidents
    due to negligence.

7
THANK YOU
  • Seward Wyon
  • The Old TanneryKelston, BathBA1 9AN
  • Tel 44 (0) 117 932 7565
  • Fax 44 (0) 117 932 7763
  • Email info_at_sewardwyon.co.uk
Write a Comment
User Comments (0)
About PowerShow.com