Advanced Recycling Equipment, Inc.
Providing Alternative Energy Sources
Biomass Energy
2
(No Transcript)
3
Combustion gases dwell in Extended Combustion
Chamber for 1-2 seconds for complete combustion
of biomass fuel.
Combustion begins in Primary Combustion Chamber
through the use of Primary, Secondary and
Tertiary Air.
Gases enter the Boiler for Thermal Recovery.
Gases enter the high efficiency Emissions Control
Device to eliminate unwanted particulates and
fly-ash.
Clean gases exit the system through the Stack.
All the while, the Induced Draft Fan maintains
negative pressure throughout the system.
Combustion Process Flow
4
Auto De-Ash System
  • Automatic Self-Cleaning
  • No Manual Raking or Rampdown/Burndown
  • Continual Operation
  • Minimal Maintenance / Downtime
  • Reduced Labor/Operational Costs
  • Increased Efficiency
  • Clean Environment
  • Safer Operation

5
Extended Combustion Zone
  • Extends Dwell Time of Combustion Gases to Exceed
    1.3 Seconds
  • Reduces Emissions
  • Completes Combustion of all Carbon-Based
    Materials
  • Reduces Maintenance and Downtime on Heat
    Recovery Unit

6
Fully-Automated Controls
  • Allows for Complete Automation
  • Modulates Control Components to Vary with Load
  • Improves Efficiency
  • Gives Operator Full Control in Manual / Auto
    Mode
  • Network / Ethernet Compatible
  • Allows for Remote Access
  • Capable of Trending All Information for Document
    / Record History
  • Allows for Variation of Fuel Moisture Content

7
Storage Material Handling
  • 10-1200 Cubic Yard Capacity
  • Allows for Mixing of Different Fuel Types
  • Allows for Direct Truck Unloading or
  • Manual Loading

Fuel Transfer System
Fuel Storage System
8
Additional Features
  • Pre-Cast Refractory-Lined Combustion Chambers
  • Modular Construction
  • High Insulating Characteristics Resulting in Low
    External Temperature
  • Capable of Burning Assorted Fuels up to 50
    Moisture Content of Varying Sizes
  • Designed to Operate Efficiently at 20-100 of
    Rated Output
  • Safe to Operate with Various Alarm Options
  • Equipped with both Electrical and Non-Electrical
    Burnback Sensors

9
Services Provided
  • Engineering
  • Full System Layout and Design
  • Component Design and Engineering
  • Coordination with outside project partners, such
    as Architects and Engineers
  • Technical Support
  • System Installation (Mechanical and Electrical)
  • Full System Support, Startup and Commissioning
  • Full-Time Service Technicians
  • Maintenance
  • Service Contracts Available
  • Scheduled Preventative Maintenance and Cleaning
  • Full Parts Inventory

10
Multiple Combustion Unit Installation(2) 800HP
Hot Water Systems
11
600 HP Steam Combustion UnitIn Full Operation
12
Hospital Application
Thermal Recovery Provides Steam for Sterilization
Processes and Heating Cooling of Facility
  • Scope of Supply
  • 15 MMBTU Steam
  • Equipped with Auto De-Ash
  • Extended Combustion Zone
  • PCC Controls
  • 450 HP, 150 psig Steam Boiler
  • 200 Cubic Yard Live Auger
  • Bottom Storage Bin
  • Combustion Air Pre-Heater
  • Multi-Clone Collector
  • Fuel
  • Ground Residual Waste from Forest Floor
  • Ground Pallets
  • Screened Fines from Particle Board Process

13
Greenhouse Application
Thermal Recovery Provides Heat to Greenhouse
Facility
  • Scope of Supply
  • 8 MMBTU Hot Water
  • Equipped with Auto De-Ash
  • PCC Controls
  • Hot Water Heat Exchanger
  • 40 Cubic Yard Live Auger
  • Bottom Storage Bin
  • Fuel
  • Ground Cabinets and Doors
  • Other Assorted Wood Waste

14
Greenhouse Application
Thermal Recovery Provides Steam for Building Heat
  • Scope of Supply
  • 6 MMBTU Steam
  • Extended Combustion
  • PCC Controls
  • Equipped with Auto De-Ash
  • Fuel Screening Equipment
  • Multi-Clone Collector
  • 50 Cubic Yard Live Auger
  • Bottom Storage Bin
  • 200 HP Steam Boiler
  • Fuel
  • Whole Tree Chips
  • Green Sawmill Chips
  • Sawdust

15
School Application
Thermal Recovery Provides Low Pressure Steam to
Heat School Facilities
  • Scope of Supply
  • 8.5 MMBTU Steam
  • Extended Combustion
  • PCC Controls
  • Equipped with Auto De-Ash
  • Truck Unloading System
  • 35 Cubic Yard Live Auger
  • Bottom Storage Bin
  • 250 HP Low Pressure Steam Boiler with Automatic
    Soot Blower System
  • Fuel
  • Pallet Scrap
  • Green Wood Waste

16
Industrial/Manufacturing Application
Thermal Recovery Provides Hot Water Plant Heating
and Cooling
Location
Wichita, KS
  • Scope of Supply
  • 8 MMBTU Hot Water
  • Extended Combustion
  • PCC Controls
  • Equipped with Auto De-Ash
  • Hot Water Heat Exchange
  • Cyclone Collector
  • Fuel
  • Dry Hardwood Sawdust
  • Particle Board

17
Dry Kiln Application
Thermal Recovery Provides Steam for Dry Kiln
Operations
  • Scope of Supply
  • 9 MMBTU Steam
  • Extended Combustion
  • PCC Controls
  • Equipped with Auto De-Ash
  • 250 HP Steam Boiler
  • 200 Cubic Yard Storage Silo
  • with Material Handling Equipment
  • Fuel
  • Dry Hard and Soft Woods
  • Shavings

18
School Application
Thermal Recovery Provides Hot Water Heat to
School Facility
  • Scope of Supply
  • 8 MMBTU Hot Water
  • Extended Combustion
  • Equipped with Auto De-Ash
  • PCC Controls
  • 200 HP Hot Water Boiler
  • 20 Cubic Yard
  • Truck Unloader/Storage
  • Gas/Oil Backup Burner
  • Fuel
  • Forest Waste
  • Management Residue

19
Correctional Facility Application
Thermal Recovery Provides Steam for Laundry
Service and Facility Heat
  • Scope of Supply
  • 13.5 MMBTU
  • Extended Combustion Zone
  • Auto De-Ash
  • PCC Controls
  • 400 HP, 250 psig Steam Boiler
  • 300 Cubic Yard Live Auger Bottom Storage System
    with Shaker/Screener for Over-Sized Material
  • Combustion Air Pre-Heater
  • Multi-Clone Collector
  • Fuel
  • Ground Residual Waste from Forest Floor

20
Projects In-Progress
CHALLENGER CCUE412-A Akron, NY
  • Providing Warm Air to Paper Sludge Dryer
  • 12 MMBTU
  • Extended Combustion Zone, Auto De-Ash, PCC
    Controls
  • Hot Air Heat Exchanger
  • Combustion Air Pre-Heater
  • Multi-Clone Collector
  • CHALLENGER CG1000 Hopper Grinder processing
    ground doors and pallets from local manufacturing
    facilities into the fuel for the Thermal
    Combustion System.

21
8 MW Co-Gen Facility
22
(No Transcript)