1WHY USE GSSI GPR?
2History of GPR
- GPR invented 1970
- Uses
- To Find Bedrock, Water Tables, and Geological
Features - Nuclear power industry 1980s
3Theory
- Electromagnetic Reflection (EMR)
- Ultra Wide Band frequency
- 300 MHz to 3 GHz
- 64 KHz repetition rate
4Characteristics
- Average radiated power - .004
milliwatts - Practical limits 15-18 in concrete with 1.6GHz
antenna - Up To 36 Deep with 900MHz antenna
5ADVANTAGES OF GPR
- EXTREMELY ACCURATE
- FAST
- REAL TIME TARGETING
- NON-DESTRUCTIVE
- ONE SIDE ACCESS (SLAB ON GRADE)
- NON-INTRUSIVE
- DIGITAL MEDIA STORAGE
6EXAMPLES2D 3DData
7Typical Slab on Grade
8GOOD CONCRETE
DETERIORATED
9Slab on Grade VS Structural Slab
10Plan-view Mapping
WIRE MESH
Rebar Mat
11DOUBLE REBAR MAT
Dbl Rebar Matt 2 D Dbl
rebar Matt 3D
12Advanced Mappingin Super 3D
13Identifying Conduit 2D
- A target that doesnt fit the rebar pattern is
most likely a conduit and requires further
investigation
14Identifying Conduit Slicing The Data
15Mapping Out Radiant Heating Lines In Slab
2-D Plan View
3-D Depth Slice
16BecausePicture worth a thousand words
Before Concrete
Results of scanning
17GSSI - Demonstration Fermi National Accelerator
Laboratories April 13, 2005
- Four Sites were chosen for the purpose to
showcase GPR with known embedments inside the
concrete of Fermi Labs. - The Four Sites
- First Site IBC Cryostat Area (Side)
Grid 002 - Second Site ICB Collaring Press Saw Cut Grid
003 - Third Site ICB 2W Headquarters Conf Rm Grid
005 - ICB Computer Area (Field Issues)
Grid 006
18First Site IBC Cryostat Area (Side)
End of Wire Mesh
19First Site IBC Cryostat Area (Side)
20First Site IBC Cryostat Area (Side)
21First Site IBC Cryostat Area (Side)
New Roll of 4 Mesh
Curling End of Wire 4 Wire Mesh
22Second Site ICB Collaring Press Saw Cut
23Second Site ICB Collaring Press Saw Cut
24Second Site ICB Collaring Press Saw Cut
25Third Site ICB 2W Headquarters Conf Rm
Target Under Conf Table
Known Conduit See User Mark
26Third Site ICB 2W Headquarters Conf Rm
Wire Mesh
27Third Site ICB 2W Headquarters Conf Rm
Conf Room Wall
28Third Site ICB 2W Headquarters Conf Rm
29Fourth SiteICB Computer Area (Field Issues)
2.
3.
1.
The Bright white dots are the targets in the
concrete. This is a 2D side profile.
30Fourth SiteICB Computer Area (Field Issues)
3.
2.
1.
Conduits
Post Processing
On Screen
31Fourth SiteICB Computer Area (Field Issues)
Pinpoint targets in the 2D Profile view while
interactive cross-hairs are shown on the 3D Cube
above.
32Fourth SiteICB Computer Area (Field Issues)
Note The Mesh Depth Change
2x2ft Structure Scan Optic Pad Conduits in
Yellow
33Conclusion
- The four sites scanned by Structure Scan yielded
excellent results. - A. Near field conduits were evident.
- B. 4 wire mesh was shown clearly
- C. Conduits were seen deeper as well.
- D. Post Processing data helps exact target
- location with Super 3D.