WHY USE GSSI GPR?
2
History of GPR
  • GPR invented 1970
  • Uses
  • To Find Bedrock, Water Tables, and Geological
    Features
  • Nuclear power industry 1980s

3
Theory
  • Electromagnetic Reflection (EMR)
  • Ultra Wide Band frequency
  • 300 MHz to 3 GHz
  • 64 KHz repetition rate

4
Characteristics
  • Average radiated power - .004
    milliwatts
  • Practical limits 15-18 in concrete with 1.6GHz
    antenna
  • Up To 36 Deep with 900MHz antenna

5
ADVANTAGES OF GPR
  • EXTREMELY ACCURATE
  • FAST
  • REAL TIME TARGETING
  • NON-DESTRUCTIVE
  • ONE SIDE ACCESS (SLAB ON GRADE)
  • NON-INTRUSIVE
  • DIGITAL MEDIA STORAGE

6
EXAMPLES2D 3DData
7
Typical Slab on Grade
8
GOOD CONCRETE
DETERIORATED
9
Slab on Grade VS Structural Slab
10
Plan-view Mapping
WIRE MESH
Rebar Mat
11
DOUBLE REBAR MAT
Dbl Rebar Matt 2 D Dbl
rebar Matt 3D
12
Advanced Mappingin Super 3D
13
Identifying Conduit 2D
  • A target that doesnt fit the rebar pattern is
    most likely a conduit and requires further
    investigation

14
Identifying Conduit Slicing The Data
15
Mapping Out Radiant Heating Lines In Slab
2-D Plan View
3-D Depth Slice
16
BecausePicture worth a thousand words
Before Concrete
Results of scanning
17
GSSI - Demonstration Fermi National Accelerator
Laboratories April 13, 2005
  • Four Sites were chosen for the purpose to
    showcase GPR with known embedments inside the
    concrete of Fermi Labs.
  • The Four Sites
  • First Site IBC Cryostat Area (Side)
    Grid 002
  • Second Site ICB Collaring Press Saw Cut Grid
    003
  • Third Site ICB 2W Headquarters Conf Rm Grid
    005
  • ICB Computer Area (Field Issues)
    Grid 006

18
First Site IBC Cryostat Area (Side)
End of Wire Mesh
19
First Site IBC Cryostat Area (Side)
20
First Site IBC Cryostat Area (Side)
21
First Site IBC Cryostat Area (Side)
New Roll of 4 Mesh
Curling End of Wire 4 Wire Mesh
22
Second Site ICB Collaring Press Saw Cut
23
Second Site ICB Collaring Press Saw Cut
24
Second Site ICB Collaring Press Saw Cut
25
Third Site ICB 2W Headquarters Conf Rm
Target Under Conf Table
Known Conduit See User Mark
26
Third Site ICB 2W Headquarters Conf Rm
Wire Mesh
27
Third Site ICB 2W Headquarters Conf Rm
Conf Room Wall
28
Third Site ICB 2W Headquarters Conf Rm
29
Fourth SiteICB Computer Area (Field Issues)
2.
3.
1.
The Bright white dots are the targets in the
concrete. This is a 2D side profile.
30
Fourth SiteICB Computer Area (Field Issues)
3.
2.
1.
Conduits
Post Processing
On Screen
31
Fourth SiteICB Computer Area (Field Issues)
Pinpoint targets in the 2D Profile view while
interactive cross-hairs are shown on the 3D Cube
above.
32
Fourth SiteICB Computer Area (Field Issues)
Note The Mesh Depth Change
2x2ft Structure Scan Optic Pad Conduits in
Yellow
33
Conclusion
  • The four sites scanned by Structure Scan yielded
    excellent results.
  • A. Near field conduits were evident.
  • B. 4 wire mesh was shown clearly
  • C. Conduits were seen deeper as well.
  • D. Post Processing data helps exact target