Publications and Forms Management: AFI 33360 Update - PowerPoint PPT Presentation

1 / 21
About This Presentation
Title:

Publications and Forms Management: AFI 33360 Update

Description:

Date the supp is certified as current will be included in the ... Certify as Current. Re-integrate with updated basic. 18. Dating ... and certifying official ... – PowerPoint PPT presentation

Number of Views:47
Avg rating:3.0/5.0
Slides: 22
Provided by: patrickjac
Category:

less

Transcript and Presenter's Notes

Title: Publications and Forms Management: AFI 33360 Update


1
Publications and Forms Management AFI 33-360
Update
  • Mr Phil Canterbury
  • SAF/AAX
  • July 10, 2008

2
Overview
  • Background
  • Interim Changes
  • Discussion Points
  • Conclusion

3
Background
  • 2006 major rewrite of AFI 33-360
  • IC-01 on GMs and PMs in March 2007 under senior
    leadership direction
  • IC-02 incorporating field inputs to 2006
    rewrite Released July 2007
  • IC-03 to be issued within 90 days
  • Next planned change maybe a rewrite

4
IC-03 Changes
  • Update Accessibility Statement
  • Remove errant webpage link
  • Updating Records Management Statement
  • Removing reference to rescinded publication
  • New web link to AFRIMS site behind AF Portal
  • Removing reference to Tagging
  • Will replace with formatting or processing
  • Hope to save confusion during field inspections

5
IC-03 Changes
  • Clarify AFCAs role for Report Control purposes
  • TBD at this time
  • Possible move to SAF/XCPP
  • Change identifier for Interservice Publications
  • Change from (IP) to (I)
  • Emphasize publication structure in para 2.12.1
  • Detail in para 2.12.1 overlooked!
  • Underline and bold text

6
IC-03 Changes
  • Certify Current
  • Interim change does not automatically certify
    publication as current
  • OPR must annotate section III of AF 673
  • Coordination Tables
  • Add SAF/AAX as mandatory coordinator for all AF
    supplements to DOD Instructions and Directives
  • Update Office Symbols and email addresses

7
MAJCOM Discussion Points
  • AF Forms
  • System generated mirror-like forms
  • Operating Instructions
  • Management below Wing level
  • Pubs/Forms Managers
  • Contractors
  • ANG/RE Coordination
  • Units below MAJCOM

8
MAJCOM Discussion Points
  • Policy and Guidance Memorandums
  • Designed obsolescence -180 day life cycle
  • Legality of Publications
  • Official policy/guidance when made available
  • Rescinding Publications
  • Coordination requirements
  • Functional Publication Library (FPL)
  • Command Post authorized

9
MAJCOM Discussion Points
  • Supply Manual (AFMAN 23-110)
  • Quarterly updates and AFGMs
  • Limited use of Social Security Numbers
  • AFI 33-332 will provide guidance detailed
  • Bullets
  • Allowing use of bullets in non-directive
    publications
  • Supplementing DOD Instructions that contain
    Policy
  • Must provide clear scope in opening statement

10
Conclusion
  • SAF/AAX welcomes comments/changes to AFI 33-360
    or the AF Form 673
  • Make use of the AF Form 847 to submit
    comments/changes
  • SAF/AAX intends to continue developing the
    publications process to the benefit of all users


11
Questions?
12
Use of the AF Form 673
  • AF Form 673 used for
  • Submitting new, revised (AC, IC), rewritten,
    cancelled pubs and forms
  • Regular or special reviews of pubs and forms
  • Pubs and forms prescribed therein will be
    reviewed at same time, using same 673
  • AF Form 673 recent updates
  • Designated area for VA-related information
  • Coordination section enabled for digital
    signatures
  • Two-year/Special Review section includes space
    for certifiers sig.
  • Some blocks re-ordered or pre-filled to
    facilitate use

13
Discussion Point - Forms vs System Generated
Reports
  • Use of

14
Major Changes
  • Guidance on field supplements
  • Field OPRs may issue standalone or integrated
  • Strongly encouraged to issue integrateduseful
    format for readers
  • OPR specify preference on 673 if no
    specification, AFDPO will create and post an
    integrated version
  • Only 1 version posted to e-Pubs if integrated
    version exists, it will be posted
  • Field Managers may mandate use of only 1 type of
    supplement for your OPRs
  • HAF OPRs are under direction to provide clearer
    terms on field supplements when writing the
    basicexpect increased HAF oversight

15
Major Changes
  • Clarifies process of updating supplements
  • When higher headquarters pub is changed, OPRs
    have 180 days to update supplements
  • If no supplementary material in a standalone
    supp is affected by updates to higher pub, OPR
    should certify as current
  • Date the supp is certified as current will be
    included in the front matter
  • If no supplementary material in an integrated
    supp is affected by changes to higher pub, OPRs
    may certify the integrated version as current
    AFDPO will re-integrate supplementary text with
    updated basic and re-post on e-Pubs

16
Major Changes
  • Clarifies process of updating supplements
    (cont.)
  • If there is conflicting information in the supp,
    it must immediately be rescinded and removed from
    website
  • OPR should issue a GM in its place to avoid
    gaps in guidance to users
  • If not updated within 180 days (IC, AC, GM,
    cert. current), the supp will be removed from the
    website and, in effect, cancelled
  • GMs issued to replace or amend a supp will
    expire when supp is revised (must be within 180
    days)
  • GMs exceeding 180 days will be removed from the
    website
  • If the expired GM was used to update
    non-conflicting guidance, the supp will also be
    removed

17
Major Changes
18
Major Changes
  • Dating Publications
  • Pubs managers to assign date to pubs and forms
  • AFDPO will assign date for departmental
    publications
  • AFDPO-assigned dates will not exceed 7 business
    days after receipt of correct, complete materials
    from OPR
  • Publications (including ICs) and forms may be
    assigned an effective date falling in the future
  • Publication date is the effective date
  • Backdating (release after date on pub/form) is
    absolutely prohibited

19
Major Changes
  • Clarifies the certified current process
  • May be done during regular 2-year review or
    during an out-of-cycle review
  • OPR and certifying official sign off
  • If another action is rolled in with response
    (cancellation, IC, AC, etc.), OPR must include
    necessary coordination, signatures, and materials
    (e.g., draft changes) as part of the response
  • If another action is rolled in with response,
    certifying official only needs to sign the 673
    once

20
Major Changes
  • Mandatory Coordination
  • MAJCOM, FOA, DRU managers set mandatory coord
    for their orgs and subordinate activities
  • Use Table 2.2 as a guideensure all legal
    requirements are met
  • If no manager (as is the case for some FOAs),
    OPRs will use Table 2.2
  • Subordinate activities wishing to set their own
    mandatory coordination may obtain permission and
    guidance from their MAJCOM/FOA/DRU
  • Public Affairs moved to technical/functional
    table
  • Legal review determined other coordination
    requirements eliminated need for additional PA
    review

21
Major Changes
  • Adjustments to forms-related guidance
  • Includes explicit guidance on form waivers
  • Field forms designers designate who may
    obtain/use standard forms-designer software
  • Mandates inclusion of releasability statement if
    releasability is restricted
  • Includes guidance on overprints and use of forms
    in information systems
  • OPRs may work directly with forms designers to
    make purely technical fixes (changes to layout or
    purpose of the form still need to be coordinated)
  • If only technical fixes are made, forms will not
    be redated
Write a Comment