Title: TUMS


1
TUMS
  • March 25, 2009

2
AGENDA - TUMS
  • Project Updates
  • VOIP Deployment (Mona Brennan-Coles)
  • SLB Data Center Upgrade (Doug Vandevrie)
  • Infrastructure Updates
  • Email Updates (Ed Gibson)
  • Data Management (Jon Hickmott)
  • VMWare Presentation Foxnet Solutions

3
Project Updates
  • TUMS March 25th

4
VoIP Deployment Project
  • Power Strategy Closet Upgrades
  • UPS/AC/Generator/PoE Network Switches
  • VoIP Telephone Deployment
  • Replace digital phones
  • Use one network port for both computer and phone

5
Power Strategy Closet Upgrades
6
VoIP Phone Deployment - Completed
  • Support Services Building
  • Material Sciences Addition
  • New Sports (TRAC) Facility Building
  • Robarts Research Institute

7
VoIP Phone Deployment - Scheduled
  • Clinical Skills (March 31st)
  • Kresge, Molecular Biology Laboratory (April 1st)
  • Avian Research (April 2009)
  • Dental Sciences, Medical Sciences, Health
    Sciences Addition (April/May 2009)
  • ICFAR Building (May 2009)
  • West Valley Building (June 2009)

8
VoIP 911 Location Lookup
  • Provide Location information for 911 calls
  • Web display at Campus Police Dispatch
  • Prototype
  • Completed and reviewed by Campus Police
  • Testing
  • March and April 2009
  • Deployment
  • May 2009

9
SLB Data Center Upgrade
  • Scope
  • Electrical
  • UPS Replacement
  • 160KVA UPS to be moved from NSC237
  • doubling our current UPS capacity in SLB29
  • Electrical Distribution upgrade within facility
  • Move to 208V distribution within all racks
  • Improved power efficiency and economies
  • HVAC upgrades
  • Replace one A/C with New, larger AC

10
SLB Data Center Upgrade
  • Scope
  • Monitoring
  • Improved environmental and facilities monitoring
  • equivalent to that in SSB
  • Remote Management
  • Replace legacy Analog KVM with IP enabled KVM

11
SLB Data Center Upgrade
  • Current Status
  • Asset inventory and initial Asset classification
    complete
  • 8 servers being moved to SSB on March 29th as a
    1st step in risk mitigation for services supplied
    by these hosts.
  • IP KVM Hardware on order
  • Should be onsite by end of March.
  • Planning Meetings continue with PPD
  • more to come

12
Infrastructure Updates
  • TUMS March 25th

13
Email Outlook Connector
  • Stats 586 Users -gt 395 Converted (67)
  • Sun provided a Calendar/Connector SME onsite for
    1 week
  • Outcomes
  • Connector application is an add-on to Outlook.
  • Policy changes within the outlook application
    could disable the connector add-on
  • Re-enabling the add-on presents a faster
    recovery path to some problems

14
Email Outlook Connector
  • Reoccurring Meeting Bug
  • Documented and repeatable instances where a
    reoccurring meeting is deleted in outlook.
  • Instance is observed to disappear from outlook
    and CE.
  • However, after a refresh of the associated
    calendar in Outlook deleted instance reappears
  • Deleted instance does not reappear in CE
  • If you encounter this bug please advise ITS by
    emailing connector-support_at_uwo.ca

15
Data Deduplication Project
  • Completed Deployment
  • All Clients migrated to tape backups (to clear
    disk)
  • Upgraded FalconStor Virtual Tape Library (new
    server)
  • Installed FalconStor Single Instance Repository
  • Installed new disk and reorganized old disk
  • VTL has 9 TB
  • SIR has 32 TB
  • All client backups migrated to new environment
  • Fine tuned the deduplication process
  • Some Compressed backups moved back to tape
  • Currently averaging 151 or better compression

16
Data Deduplication Infrastructure
17
Data Deduplication Process
  • Backup taken over night written to virtual tapes
    on the VTL
  • Clone process runs in morning reads virtual tapes
    on VTL and writes them to physical tapes in L700
    tape library (In Engineering)
  • Deduplication process run in afternoons reads all
    FULL Virtual tapes and writes only unique blocks
    to Single Instance Repository
  • Virtual tape replaced with a virtual index tape

18
Tier II Storage
  • New storage model being designed to supplement
    the
  • Current production SAN
  • More affordable storage
  • Larger capacity
  • Not as redundant
  • Limited performance
  • Alternative backup model

19
Tier II hardware and software
  • 2 Sun X4500 servers purchased
  • 48 x 500GB Sata drives (16 TB usable under RAID
    60)
  • Currently running Solaris 10 which offers
  • ZFS, NFS, iSCSI, Compression
  • SnapShots, Replication, Thin provisioning
  • Investigating OpenSolaris which adds
  • CIFS, WebDav
  • (Rumors Data Deduplication in near future)

20
Tier II alternative Backup model
  • Uses Snapshots and Replication
  • Snapshot taken ever night
  • Snapshot is replicated over to 2nd disk array
  • Maintain nightly snapshots on both arrays back 56
    days
  • Can tailor the backups to the data
  • Static data backed up once/week
  • Active data backed up multiple time a day

21
VMWare Update Foxnet Solutions